Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00280/FUL

Unit C Holly Industrial Park Ryan Way Watford WD24 4YP

Awaiting decision Watford Full Planning Permission

Proposal

Installation of air condensor units and flue

As published by the council, reference 26/00280/FUL

Timeline

Dates from the published record

  1. 2 Apr 2026

    Received by Watford

  2. 15 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 24 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Watford for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00493/FULH Awaiting decision

    54 Devon Road Watford Hertfordshire WD24 4HN

    Erection of a front porch extension with associated shower room.

    29 Jun 2026 35m away Householder
  • 22/00413/FULH Decided

    62 Devon Road Watford Hertfordshire WD24 4HN

    Erection of a front porch.

    28 Mar 2022 45m away Householder
  • 22/00260/FUL Decided

    Unit K Penfold Industrial Park Imperial Way Watford WD24 4YY

    Proposed 5 no A/C units to the side elevation to be located at high level. Proposed incoming and extract supply louvres to the rear elevation to be silver aluminium

    17 Feb 2022 100m away Full applications
  • 23/00833/FULH Decided

    8 Tavistock Road Watford WD24 4HL

    Proposed works - changes to internal part of house, changes of location to two windows and external door, creating new porch in front of house.

    18 Sep 2023 125m away Householder
  • 23/01055/FULH Refused

    3 Carisbrooke Avenue Watford WD24 5HU

    Erection of a ground floor rear and side wrap around extension and part first floor side extension.

    16 Nov 2023 132m away Householder
  • 20/01215/FULH Withdrawn

    16 Tavistock Road Watford WD24 4HL

    Erection of a ground floor rear extension with parapet wall under 3m and rooflight, first floor extension with 3m and 1.5m projection with roof to match existing, hip to gable end extension with dormer roof extension, new rear and side fenestration and front porch

    3 Nov 2020 151m away Householder

In Watford

  • 26/00456/FUL Decided

    46 Clarendon Road Watford WD17 1HE

    Replacement roof plant

    16 Jun 2026 Full applications
  • 26/00455/FUL Decided

    Centinal House 46 Clarendon Road Watford WD17 1HE

    Creation of a terrace area at the second floor level and associated works.

    16 Jun 2026 Full applications
  • 26/00331/FUL Refused

    The Spinney Watford WD17 4QF

    Creation of 5no. new car parking spaces.

    29 Apr 2026 Full applications
  • 25/00722/FUL Refused

    Tarmay House 148 St Albans Road Watford WD24 4FS

    Restropective planning of Installation of commercial kitchen extractor ducting system

    4 Aug 2025 Full applications
  • 26/00076/FUL Refused

    84 Whippendell Road Watford WD18 7LR

    Conversion of rear part of shop and basement to a one bedroom flat with a light-well to the front and new windows to the side.

    4 Feb 2026 Full applications