Planning application
Land Southwest Of Myton Gardens Primary School, Fusiliers Way, Warwick
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of a new sporting facility consisting of sports pavilion, athletics track and associated...
As published by the council, reference W/26/0859
Application record
- Reference
- W/26/0859
- Status
- Registered
- Received
- 18 Jun 2026
- Validated
- 22 Jun 2026
- Ward
- Warwick Myton and Heathcote
- Parish
- Warwick
Timeline
Dates from the published record
-
18 Jun 2026
Received by Warwick
-
22 Jun 2026
Validated
Checked as complete and ready for consideration.
-
8 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 17 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Warwick took a median of 102 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
174 applications on PlanIndex · across 32 councils · 94% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
78 documents on file for this application
- WDC Environmental Health
- WDC Policy
- CLLR WARWICK TOWN COUNCIL -OBJECTS-THE COURTHOUSE JURY STREET WARWICK(FULL)
- WCC Arboriculture
- conservation officer response
- WCC Flood Risk Management
- WCC RIGHTS OF WAY
- Warks Wildlife Trust
- WCC Ecology
- Natural England
- SPORT ENGLAND
- Warwickshire Police
- WCC Landscape
- WCC FIRE AND RESCUE
- Statutory_Biodiversity_Metric_24Mar26
- APPLICATION FORM REDACTED
- TREE SURVEY & ARBORICULTURE IMPACT ASSESSMENT - MYTON SCHOOL - ATHLETICS TRACK A
- TREE PROTECTION STATUS -AIA - MYTON SCHOOL - ATHLETICS TRACK AND PAVILLION WARWI
- MYTON ATHLETICS FACILITY - SITE INVESTIGATIONPART 1 OF 2
- MYTON ATHLETICS FACILITY - SITE INVESTIGATIONPART 2 OF 2
- MYTON ATHLETICS AND PAVILION PRELIMINARY ECOLOGICAL APPRAISAL (REV01)PART 1 OF
- MYTON ATHLETICS AND PAVILION PRELIMINARY ECOLOGICAL APPRAISAL (REV01)PART 2 OF 3
- MYTON ATHLETICS AND PAVILION PRELIMINARY ECOLOGICAL APPRAISAL (REV01)PART 3 OF
- MYTON ATHLETICS AND PAVILLION PROJECT BNG DESIGN STAGE REPORT REV00PART 1 OF 2
- MYTON ATHLETICS AND PAVILLION PROJECT BNG DESIGN STAGE REPORT REV00PART 2 OF 2
- TOPOGRAPHICAL SURVEY-FOR COMMENT
- WIP LIGHTING PLAN
- TRANSPORT STATEMENT FINAL
- NOISE IMPACT ASSESSMENT
- MYTON ATHLETICS WARWICK V2 FLOOD RISK ASSESSMENT AND DS RPORT
- WARWICK EUROPA WAY ARCHAEOLOGICAL EVALUATION DEC201212-210-964205
- MYTON ATHLETICS FACILITY CEMP PART 1 OF 4
- MYTON ATHLETICS FACILITY CEMP PART 2 OF 4
- MYTON ATHLETICS FACILITY CEMP PART 3 OF 4
- MYTON ATHLETICS FACILITY CEMP PART 4 OF 4
- MYTON ATHLETICS GLTA REPORT REV01 D01 REV02PART 1 OF 2
- MYTON ATHLETICS GLTA REPORT REV01 D01 REV02PART 2 OF 2
- PROPOSED GROUND FLOOR PLAN
- PROPOSED ROOF PLAN LEVEL
- SITE LOCATION PLAN 1:1250:A3
- EXISTING SITE PLAN
- PROPOSED SITE PLAN
- PROPOSED SITE LOCATION PLAN
- PROPOSED ELEVATIONS PLAN
- PROPOSED BUILDING SECTIONS PLAN
- PROPOSED SUBSTATION PLANS AND ELEVATIONS
- VENTILATION PLAN
- VENTILATION PLAN
- PROPOSED FIRST FLOOR PLAN
- LANDSCAPE GENERAL ARRANGEMENT PLAN
- BOUNDARY TREATMENT SECTIONS 1 OF 2
- BOUNDARY TREATMENT SECTIONS 2 OF 2
- LANDSCAPE SECTIONS 1 OF 2
- LANDSCAPE SECTIONS 2 OF 2
- BIN STORE ENCLOSURE
- PLANTING STRATEGY PLAN
- PROPOSED TRACK DRAINAGE LAYOUT TENDER PLAN
- LONG JUMP DETAIL CONSTRUCTION PLAN
- STEEPLE CHASE WATER JUMP DETAIL TENDER
- SHOT PUT DETAIL CONSTRUCTION PLAN
- HIGH JUMP DETAIL TENDER1
- HAMMER AND DISCUS DETAIL CONSTRUCTION PLAN
- JAVELIN DETAIL TENDER PLAN
- POLE VAULT DETAIL CONSTRUCTION PLAN
- APPENDIX A - FLOODLIGHTING PERFORMANCE REPORT CONSTRUCTION
- APPENDIX B - OPTI VISION LED GEN3.5 DATASHEETCONSTRUCTION1
- APPENDIX C - SPORTS LIGHTING STATEMENT CONSTRUCTION
- FLOODLIGHTING SCHEME AND REPORTTENDER03
- PROPOSED SITE PLAN OPTION 2TENDER12
- TRACK AND INFIELD SECTION BUILD-UPTENDER02
- FIELD EVENT DIMENSIONS TENDER1
- DESIGN ACCESS STATEMENT REDPART1
- DESIGN ACCESS STATEMENT REDPART2
- DESIGN ACCESS STATEMENT REDPART3
- DESIGN ACCESS STATEMENT REDPART4
- FINAL CIL FORM1
- FINAL COVER LETTER
- FINAL MYTON ATHLETICS PLANNING STATEMENT
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Warwick for determination, against a statutory target of eight weeks. Over the last year Warwick's median decision took 102 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Warwick's portal will say. Our guide explains the common types.