Skip to content
PlanIndex Get alerts
Menu

Planning application

Land to the south of Westwood Heath Road, Burton Green, Coventry

Awaiting decision Warwick W/25/0945 Planning Permission

Works: New dwelling Major scheme

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Full planning application for residential development comprising 416no. dwellings (which results in an overall net increase of 120no. dwellings when compared to existing approval ref. W/24/1648 for 296no. dwellings (which is itself a variation of previous approvals W/21/1280, W/24/0367 and W/24/0963) and which is achieved through the addition of a further phase (Phase 5) of residential development) together with formal and informal open space, drainage, landscaping, access and associated infrastructure works. [NB. this full application seeks to consolidate all previous approvals for residential development on this site]

As published by the council, reference W/25/0945

Application record

Reference
W/25/0945
Type
Planning Permission
Status
Registered
Received
7 Jul 2025
Validated
7 Jul 2025
Ward
Kenilworth Abbey and Arden
Parish
Burton Green

Site history

Applications at this address on the Warwick register

This site has had 3 applications since 2021: 1 approved, 0 refused.

  • DOC/26/0024 Awaiting decision

    Land to the South of Westwood Heath Road, Burton Green, Coventry

    Application for the Discharge of Condition 15 (Construction Method Statement) in relation to Phase 2 of Planning Permission W/17/2357

    Submitted 7 May 2026 Conditions
  • W/21/0427 Granted

    Land to the South of Westwood Heath Road, Burton Green,Coventry

    Variation of conditions 4 (approved plans) and 26 (approved plans in relation to highway works) of planning permission W/17/2357 (Hybrid planning application for the erection of up to 425 dwellings [including detailed first phase of 129 dwellings with remainder of the site being outline including details of access], convenience store, open space, infrastructure provision and means of access onto Westwood Heath Road / agricultural access onto Bockendon Lane) to allow changes to the house types and the layout of the secondary roads within the detailed phase (129 dwellings) of the site. There are no material changes proposed to the approved development parcels within Phase 1.

    Decided 18 Sep 2021 Amendments

Timeline

Dates from the published record

  1. 7 Jul 2025

    Received by Warwick

  2. 23 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 1 September 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Warwick took a median of 64 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Savills (UK) Ltd Agent, registered in London

Active · incorporated 1991 · London

920 applications on PlanIndex · across 135 councils · 94% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

253 documents on file for this application

  • University Hospitals Coventry and Warwickshire NHS Trust Resposne Consultation Response · 13 Aug 2026
  • Housing Strategy Consultation Response · 05 May 2026
  • Planning Statement | Acute Healthcare Matters Consultation Response · 16 Apr 2026
  • HOUSING REPORT Supporting Report · 15 Apr 2026
  • Cover Letter Supporting Report · 15 Apr 2026
  • Coventry Highways Network Consultation Response · 03 Feb 2026
  • WCC Highways Authority Consultation Response · 28 Jan 2026
  • WCC Rights of Way Consultation Response · 25 Dec 2025
  • Highways Technical Note - Final Case Correspondence · 18 Nov 2025
  • WCC Infrastructure Team Consultation Response · 13 Nov 2025
  • Sports and Leisure Consultation Response · 13 Oct 2025
  • Sports and Leisure Consultation Response · 13 Oct 2025
  • Sports and Leisure Consultation Response · 13 Oct 2025
  • Green Space Consultation Response · 08 Oct 2025
  • Health and community Protection Consultation Response · 02 Oct 2025
  • ES Appendix 13.2 - Day 55dB High Quality.bmp Supporting Report · 29 Sep 2025
  • ES Appendix 13.3 - Day High Quality.bmp Supporting Report · 29 Sep 2025
  • ES Appendix 13.4 - Night High Quality.bmp Supporting Report · 29 Sep 2025
  • ES Appendix_9.1_-_STL_Site_Investigation_Report_ Supporting Report · 29 Sep 2025
  • Police & Crime Warwickshire Consultation Response · 23 Sep 2025
  • NHS Coventry and Warwickshire Integrated Care Board Consultation Response · 22 Sep 2025
  • conservation Consultation Response · 19 Sep 2025
  • Warwickshire NHS Trust - Acute Healthcare Consultation Response · 08 Sep 2025
  • WCC STRATEGIC PLANNING AND INFRASTRUCTURE - SUMMARY RESPONSE Consultation Response · 03 Sep 2025
  • WCC Police & Crime Consultation Response · 29 Aug 2025
  • HOUSING STRATEGY Consultation Response · 28 Aug 2025
  • COVENTRY CITY COUNCIL - HIGHWAYS AUTHORITY Consultation Response · 22 Aug 2025
  • WCC LANDSCAPE TEAM Consultation Response · 22 Aug 2025
  • HISTORIC ENGLAND Consultation Response · 21 Aug 2025
  • WCC FLOOD RISK MANAGEMENT Consultation Response · 21 Aug 2025
  • Si Lam-Objects-9 Broadwell Heights Burton Green Coventry(FULL) Objection Comment · 21 Aug 2025
  • RESPONSE FROM NHS COVENTRY & WARWICKSHIRE ICB Consultation Response · 21 Aug 2025
  • Mrs eunice leack-Objects-201 Cromwell Lane Burton Green Kenilworth(FULL) Objection Comment · 20 Aug 2025
  • Mrs Pippa Gardner-Objects-190 Cromwell Lane Kenilworth(FULL) Objection Comment · 20 Aug 2025
  • COVENTRY CITY COUNCIL - DEVELOPMENT MANAGEMENT Consultation Response · 20 Aug 2025
  • NATURAL ENGLAND Consultation Response · 19 Aug 2025
  • NATURAL ENGLAND-ANNEX A Consultation Response · 19 Aug 2025
  • WCC ARCHAEOLOGICAL SERVICES Consultation Response · 19 Aug 2025
  • WCC RIGHTS OF WAY Consultation Response · 19 Aug 2025
  • WCC ARBORICULTURE Consultation Response · 19 Aug 2025
  • BURTON GREEN PARISH COUNCIL Consultation Response · 18 Aug 2025
  • BIOREGIONAL Consultation Response · 18 Aug 2025
  • BIOREGIONAL Consultation Response · 18 Aug 2025
  • CLLR KYN AIZLEWOOD Consultation Response · 15 Aug 2025
  • WARWICKSHIRE FIRE AND RESCUE SERVICE Consultation Response · 15 Aug 2025
  • FORESTRY COMMISSION Consultation Response · 15 Aug 2025
  • Warwickshire Police Prevention Team Consultation Response · 13 Aug 2025
  • ENVIRONMENTAL HEALTH Consultation Response · 13 Aug 2025
  • RAMBLERS WARWICKSHIRE AREA Consultation Response · 11 Aug 2025
  • WCC ECOLOGY Consultation Response · 11 Aug 2025
  • Mr luke jolliffe-Supports-16 Cromwell close Coventry(FULL) Support Comment · 06 Aug 2025
  • Mr Adrian SMITH-Objects-199 Cromwell Lane, Burton Green Kenilworth(FULL) Objection Comment · 05 Aug 2025
  • WDC WASTE MANAGEMENT RESPONSE Consultation Response · 04 Aug 2025
  • ENVIRONMENT AGENCY Consultation Response · 31 Jul 2025
  • WDC Waste Management response Consultation Response · 21 Jul 2025
  • APPLICATION FORM REDACTED Application Form · 07 Jul 2025
  • PHASE 4 CALDEWDESIGN1-ELEVATIONS PLAN Drawing · 07 Jul 2025
  • PHASE 4 ESKDESIGN1-FLOOR PLANS Drawing · 07 Jul 2025
  • PHASE 4 ESKDESIGN1-ELEVATIONS PLAN Drawing · 07 Jul 2025
  • PHASE 4 PLANNING LAYOUT Drawing · 07 Jul 2025
  • PHASE 4 PLANNING LAYOUT PRESENTATION Drawing · 07 Jul 2025
  • PHASE 4 MATERIALS PLAN Drawing · 07 Jul 2025
  • PHASE 4 BOUNDARY TREATMENTS PLAN Drawing · 07 Jul 2025
  • PHASE 4 HARD LANDSCAPING PLAN Drawing · 07 Jul 2025
  • PHASE 4 POS AREA Drawing · 07 Jul 2025
  • PHASE 4 CYCLE CONNECTIVITY PLAN Drawing · 07 Jul 2025
  • PHASE 4 HIGHWAYS AND PARKING ARRANGEMENTS PLAN Drawing · 07 Jul 2025
  • PHASE 4 MASSING PLAN Drawing · 07 Jul 2025
  • PHASE 4 OCCUPANCY PLAN Drawing · 07 Jul 2025
  • PHASE 4 REFUSE AND CYCLING STRATEGY PLAN Drawing · 07 Jul 2025
  • PHASE 4 STREET HIERARCHY PLAN Drawing · 07 Jul 2025
  • PHASE 4 TENURE PLAN Drawing · 07 Jul 2025
  • PHASE 4 STREET SCENE PLAN Drawing · 07 Jul 2025
  • PHASE 4 -1 CYCLELOCKER-GENERAL ARRANGEMENT PLAN Drawing · 07 Jul 2025
  • PHASE 4 DETAILED LANDSCAPE COMPOSITE PLAN Drawing · 07 Jul 2025
  • PHASE 4 DETAILED LAND SCAPE PROPOSALS PLAN Drawing · 07 Jul 2025
  • PHASE 4 DETAILED LAND CAPE PROPOSALS PLAN Drawing · 07 Jul 2025
  • PHASE 4 CALDEW DESIGN1-FLOORPLANS Drawing · 07 Jul 2025
  • PHASE 4 SINGLE FRONT GABLE GARAGE PLAN Drawing · 07 Jul 2025
  • PHASE 4 SINGLE FRONT GABLEGARAGE Drawing · 07 Jul 2025
  • PHASE 4 GARAGE PLAN Drawing · 07 Jul 2025
  • PHASE 4 SEMI FRONT GABLED GARAGE Drawing · 07 Jul 2025
  • PHASE 4 DOVEDESIGN1ASFLOOR PLANS Drawing · 07 Jul 2025
  • PHASE 4 DOVEDESIGN 1 ELEVATIONS PLAN Drawing · 07 Jul 2025
  • PHASE 4 DOVEDESIGN1ASFLOORPLANS Drawing · 07 Jul 2025
  • PHASE 4 SEMI.P06 DOVE DESIGN 1ELEVATIONS PLAN Drawing · 07 Jul 2025
  • PHASE 4 HELMSLEY - DESIGN 1 ELEVATIONS PLAN Drawing · 07 Jul 2025
  • PHASE 4 HELMSLEY FLOOR PLANS Drawing · 07 Jul 2025
  • PHASE 4 HELMSLEY DESIGN 1FLOOR PLANS-SEMIRIGHT Drawing · 07 Jul 2025
  • PHASE 4 KILDALE DESIGN 1ELEVATIONS PLAN Drawing · 07 Jul 2025
  • PHASE 4 KILDALE DESIGN 1ASELEVATIONS PLAN Drawing · 07 Jul 2025
  • PHASE 4 KILDALE FLOOR PLANS Drawing · 07 Jul 2025
  • PHASE 4 KILDALE FLOOR PLANS Drawing · 07 Jul 2025
  • PHASE 4 KILDALE DESIGN 1ELEVATIONS PLAN Drawing · 07 Jul 2025
  • PHASE 4 ROTHER DESIGN1AS FLOOR PLANS Drawing · 07 Jul 2025
  • PHASE 4 ROTHER DESIGN1FLOOR PLANS Drawing · 07 Jul 2025
  • PHASE 4 ROTHER DESIGN 1ELEVATIONS PLAN Drawing · 07 Jul 2025
  • PHASE 4 ROTHER DESIGN 1ASELEVATIONS PLAN Drawing · 07 Jul 2025
  • PHASE 4 GOWANFLOORPLANS Drawing · 07 Jul 2025
  • PHASE 4 GOWAN DESIGN1ASELEVATIONS PLAN Drawing · 07 Jul 2025
  • PHASE 4 SEATONFLOOR PLANS Drawing · 07 Jul 2025
  • PHASE 4 SEATONDESIGN1AS ELEVATIONS PLAN Drawing · 07 Jul 2025
  • PHASE 4 SEVERNFLOORPLANS Drawing · 07 Jul 2025
  • PHASE 4 SEVERN DESIGN1ASELEVATIONS PLAN Drawing · 07 Jul 2025
  • PHASE 4 SWINDALE DESIGN1ASELEVATIONS PLAN Drawing · 07 Jul 2025
  • PHASE 4 SWINDALE FLOOR PLANS Drawing · 07 Jul 2025
  • PHASE 4 TERNE FLOOR PLANS Drawing · 07 Jul 2025
  • PHASE 4 TEMEDESIGN1ASELEVATIONS PLAN Drawing · 07 Jul 2025
  • PHASE 4 WINSTERDESIGN1-FLOORPLANS Drawing · 07 Jul 2025
  • PHASE 4 WINSTERDESIGN1-ELEVATIONS PLAN Drawing · 07 Jul 2025
  • PHASES 2+3 - PLANTING PLAN 4 OF 12 Drawing · 07 Jul 2025
  • PHASES 2+3 - PLANTING PLAN 5 OF 12 Drawing · 07 Jul 2025
  • PHASES 2+3 - PLANTING PLAN 6 OF 12 Drawing · 07 Jul 2025
  • PHASES 2+3 - PLANTING PLAN 7 OF 12 Drawing · 07 Jul 2025
  • PHASES 2+3 - PLANTING PLAN 8 OF 12 Drawing · 07 Jul 2025
  • PHASES 2+3 - PLANTING PLAN 9 OF 12 Drawing · 07 Jul 2025
  • PHASES 2+3 - PLANTING PLAN 10 OF 12 Drawing · 07 Jul 2025
  • PHASES 2+3 - PLANTING PLAN 11 OF 12 Drawing · 07 Jul 2025
  • PHASES 2+3 - PLANTING PLAN 12 OF 12 Drawing · 07 Jul 2025
  • PHASES 2+3- PLANTING PLAN 1 OF 12 Drawing · 07 Jul 2025
  • PHASES 2+3 - PLANTING PLAN 2 OF 12 Drawing · 07 Jul 2025
  • PHASES 2+3 - PLANTING PLAN 3 OF 12 Drawing · 07 Jul 2025
  • LANDSCAPE LAYOUT - CENTRAL PUBLIC OPEN SPACE AND PHASE 3 HOUSING Drawing · 07 Jul 2025
  • PHASES 2+3 CENTRAL PLAY AREA - LEAP Drawing · 07 Jul 2025
  • PHASES 2+3 - WESTERN PLAY AREA - NEAP Drawing · 07 Jul 2025
  • PHASES 2+3 - GENERAL ARRANGEMENT PLAN Drawing · 07 Jul 2025
  • LANDSCAPE LAYOUT - WESTERN BIODIVERSITY OFFSETTING LAND Drawing · 07 Jul 2025
  • LANDSCAPE LAYOUT - WESTERN PUBLIC OPEN SPACE AND PHASE 2 HOUSING Drawing · 07 Jul 2025
  • PHASES 2+3 - HARD SURFACES STREET FURNITURE AND BOUNDARY TREATMENTS 1 OF 2 Drawing · 07 Jul 2025
  • PHASES 2+3 - HARD SURFACES STREET FURNITURE AND BOUNDARY TREATMENTS 2 OF 2 Drawing · 07 Jul 2025
  • PHASES 2+3 - CENTRAL PLAY AREA LEAP - PLAY EQUIPMENT FURNITURE AND SURFACES Drawing · 07 Jul 2025
  • PHASES 2+3 - WESTERN PLAY AREA NEAP - PLAY EQUIPMENT Drawing · 07 Jul 2025
  • PHASES 2+3 - WESTERN PLAY AREA NEAP - FURNITURE AND SURFACES Drawing · 07 Jul 2025
  • PHASES 2+3 - SITE WIDE MATERIALS AND FURNITURE PALETTE Drawing · 07 Jul 2025
  • PHASES 2+3 - ILLUSTRATIVE PLANTING PALETTE 1 OF 3 Drawing · 07 Jul 2025
  • PHASES 2+3 - ILLUSTRATIVE PLANTING PALETTE 2 OF 3 Drawing · 07 Jul 2025
  • PHASES 2+3 - ILLUSTRATIVE PLANTING PALETTE 3 OF 3 Drawing · 07 Jul 2025
  • ALLOTMENT PROPOSALS PLAN Drawing · 07 Jul 2025
  • WELDMESH FENCE AND GATE PLAN Drawing · 07 Jul 2025
  • TIMBER KNEE RAIL PLAN Drawing · 07 Jul 2025
  • COMPOSTING BAYS PLAN Drawing · 07 Jul 2025
  • TIMBER PLANTER PLAN Drawing · 07 Jul 2025
  • PHASES 2+3 ENCLOSURES PLAN Drawing · 07 Jul 2025
  • PHASES 2+3 MATERIALS PLAN Drawing · 07 Jul 2025
  • PHASES 2+3 MASSING PLAN Drawing · 07 Jul 2025
  • PHASES 2+3 TENURE PLAN Drawing · 07 Jul 2025
  • PHASES 2+3 OCCUPANCY PLAN Drawing · 07 Jul 2025
  • PHASES 2+3 REFUSE AND CYCLE STRATEGY PLAN Drawing · 07 Jul 2025
  • PHASES 2+3 STREET HIERARCHY PLAN Drawing · 07 Jul 2025
  • PHASES 2+3 STREET SCENES A-B-COMPRESSED Drawing · 07 Jul 2025
  • PHASES 2+3 CYCLE STORE PLANS AND ELEVATIONS Drawing · 07 Jul 2025
  • PHASES 2+3 HIGHWAYS AND PARKING ARRANGEMENTS PLAN Drawing · 07 Jul 2025
  • PHASES 2+3 GHOUSE TYPE BROCHURECOMPRESSED1 Supporting Report · 07 Jul 2025
  • PHASES 2+3 PLANNING LAYOUT Drawing · 07 Jul 2025
  • WESTWOOD PARK PHASE 5 STATEMENT OF COMMUNITY INVOLVEMENT Supporting Report · 07 Jul 2025
  • ES VOLUME 1A - MAIN ENVIRONMENTAL STATEMENT Supporting Report · 07 Jul 2025
  • ES - NON-TECHNICAL SUMMARY Supporting Report · 07 Jul 2025
  • ES APPENDIX 6.6 - SCHEDULED MONUMENT DRAINAGE IMPACT Supporting Report · 07 Jul 2025
  • ES APPENDIX 7.1 - GHG EMISSION CALCULATIONS Supporting Report · 07 Jul 2025
  • ES APPENDIX 7.2 - CLIMATE RISK ASSESSMENT Supporting Report · 07 Jul 2025
  • ES APPENDIX 7.3 - INTERRELATED EFFECTS OF CLIMATE CHANGE Supporting Report · 07 Jul 2025
  • ES APPENDIX 8.1 - BASELINE ECOLOGICAL APPRAISAL - NOV 2017 Supporting Report · 07 Jul 2025
  • ES APPENDIX 8.2 - BASELINE ECOLOGICAL APPRAISAL Supporting Report · 07 Jul 2025
  • ES APPENDIX 11.1 - FLOOD RISK ASSESSMENT PART 1 Supporting Report · 07 Jul 2025
  • ES APPENDIX 11.1 - FLOOD RISK ASSESSMENT PART 2 Supporting Report · 07 Jul 2025
  • ES APPENDIX 11.1 - FLOOD RISK ASSESSMENT PART 3 Supporting Report · 07 Jul 2025
  • ES APPENDIX 11.1 - FLOOD RISK ASSESSMENT PART 4 Supporting Report · 07 Jul 2025
  • ES APPENDIX 11.1 - FLOOD RISK ASSESSMENT PART 5 Supporting Report · 07 Jul 2025
  • ES APPENDIX 13.1 - AGREED SCOPE Supporting Report · 07 Jul 2025
  • ES APPENDIX 13.2 - DAY 55DB Supporting Report · 07 Jul 2025
  • ES APPENDIX 13.3 - DAY Supporting Report · 07 Jul 2025
  • ES APPENDIX 13.4 - NIGHT Supporting Report · 07 Jul 2025
  • ES APPENDIX 15.1 - TRANSPORT ASSESSMENT Supporting Report · 07 Jul 2025
  • ES APPENDIX 1.1 - GLOSSARY OF TERMS Supporting Report · 07 Jul 2025
  • ES APPENDIX 3.1 - WHOLE LIFE CARBON ASSESSMENT Supporting Report · 07 Jul 2025
  • ES APPENDIX 3.2 - ENERGY STATEMENT Supporting Report · 07 Jul 2025
  • ES APPENDIX 5.1 - POLICY CONTEXT Supporting Report · 07 Jul 2025
  • ES APPENDIX 5.2 - CONSTRUCTION DUST RISK ASSESSMENT METHODOLOGY Supporting Report · 07 Jul 2025
  • ES APPENDIX 5.3 - MODEL INPUT PARAMETERS Supporting Report · 07 Jul 2025
  • ES APPENDIX 5.4 - MODEL VERIFICATION Supporting Report · 07 Jul 2025
  • ES APPENDIX 6.1 - ARCHAEOLOGICAL DESK-BASED ASSESSMENT Supporting Report · 07 Jul 2025
  • ES APPENDIX 6.2 - ARCHAEOLOGICAL GEOPHYSICAL SURVEY Supporting Report · 07 Jul 2025
  • ES APPENDIX 6.3 - ARCHAEOLOGICAL EVALUATION REPORT Supporting Report · 07 Jul 2025
  • ES APPENDIX 6.4 - BUILT HERITAGE STATEMENT Supporting Report · 07 Jul 2025
  • ES APPENDIX 6.5 - ARCHAEOLOGICAL EXCAVATION Supporting Report · 07 Jul 2025
  • CHARACTER AREA PLAN Drawing · 07 Jul 2025
  • LOCATION PLAN Site Location Plan · 07 Jul 2025
  • CYCLE CONNECTIVITY PLAN Drawing · 07 Jul 2025
  • COMPOSITE PLANNING LAYOUT Drawing · 07 Jul 2025
  • DETAILED SITEWIDE MASTERPLAN Drawing · 07 Jul 2025
  • BIODIVERSITY NET GAIN BASELINE DV2 Supporting Report · 07 Jul 2025
  • PHASE 5 WESTWOOD HEATH DESIGN ADDENDUM (LOW RESOLUTION) COMPRESSED Supporting Report · 07 Jul 2025
  • W220055-DAS INCLUDING UPDATED DESIGN CODE-1553454 PART 1 Supporting Report · 07 Jul 2025
  • W220055-DAS INCLUDING UPDATED DESIGN CODE-1553454 PART 2 Supporting Report · 07 Jul 2025
  • PHASE 5 PLANNING LAYOUT Drawing · 07 Jul 2025
  • PHASE 5 COLOUR PLANNING LAYOUT (LOW RESOLUTION) Drawing · 07 Jul 2025
  • PHASE 5 ENCLOSURES PLAN Drawing · 07 Jul 2025
  • PHASE 5 MATERIALS PLAN Drawing · 07 Jul 2025
  • PHASE 5 MASSING PLAN Drawing · 07 Jul 2025
  • PHASE 5 TENURE PLAN Drawing · 07 Jul 2025
  • PHASE 5 OCCUPANCY PLAN Drawing · 07 Jul 2025
  • PHASE 5 REFUSE AND CYCLE STRATEGY PLAN Drawing · 07 Jul 2025
  • PHASE 5 HIGHWAYS ARRANGEMENTS PLAN Drawing · 07 Jul 2025
  • PHASE 5 STREET HIERARCHY PLAN Drawing · 07 Jul 2025
  • PHASE 5 STREET SCENES (LOW RES) PLAN Drawing · 07 Jul 2025
  • PHASE 5 CYCLE STORE FLOOR AND ELEVATIONS PLAN Drawing · 07 Jul 2025
  • PHASE 5 EXISTING AND PROPOSED SITE SECTIONS Drawing · 07 Jul 2025
  • PHASE 5 EMERGENCY FIRE DISTANCE PLAN Drawing · 07 Jul 2025
  • PHASE 5 HOUSE TYPE BROCHURE (LOW RESOLUTION) Supporting Report · 07 Jul 2025
  • PHASE 5 DETAILED LANDSCAPE PROPOSALS PLAN Drawing · 07 Jul 2025
  • PHASE 5 DETAILED LANDSCAPE PROPOSALS PLAN Drawing · 07 Jul 2025
  • PHASE 5 DETAILED LANDSCAPE PROPOSALS PLAN Drawing · 07 Jul 2025
  • PHASE 5 DETAILED LANDSCAPE PROPOSALS PLAN Drawing · 07 Jul 2025
  • PHASE 5 DETAILED LANDSCAPE PROPOSALS Drawing · 07 Jul 2025
  • PHASE 5 BIODIVERSITY OFFSETTING LAND PLAN Drawing · 07 Jul 2025
  • PHASE 5 LANDSCAPE SPECIFICATION PLAN Drawing · 07 Jul 2025
  • PHASE 5 TOPOGRAPHICAL SURVEY PLAN Drawing · 07 Jul 2025
  • PHASE 5 TOPOGRAPHICAL SURVEY Drawing · 07 Jul 2025
  • PHASE 5 T AND V JUNCTION VISIBILITY TACTILE PAVING AND INTER VISIBILITY SPLAYS P Drawing · 07 Jul 2025
  • PHASE 5 T AND V JUNCTION VISIBILITY TACTILE PAVING AND INTER VISIBILITY SPLAYS Drawing · 07 Jul 2025
  • PHASE 5 T AND V JUNCTION VISIBILITY TACTILE PAVING AND INTER VISIBILITY SPLAYS Drawing · 07 Jul 2025
  • PHASE 5 REFUSE VEHICLE SWEPT PATH ANALYSIS PLAN Drawing · 07 Jul 2025
  • PHASE 5 REFUSE VEHICLE SWEPT PATH ANALYSIS PLAN Drawing · 07 Jul 2025
  • PHASE 5 REFUSE VEHICLE SWEPT PATH ANALYSIS PLAN Drawing · 07 Jul 2025
  • ES FIGURE 1.1 -LOCATION PLAN Supporting Report · 07 Jul 2025
  • ES FIGURE 3.1 - DETAILED SITE WIDE MASTERPLAN Supporting Report · 07 Jul 2025
  • ES FIGURE 5.1 - SENSITIVE RECEPTORS Supporting Report · 07 Jul 2025
  • ES FIGURE 5.2 - AQMA Supporting Report · 07 Jul 2025
  • ES FIGURE 5.3 - AIR QUALITY MONITORING SITE Supporting Report · 07 Jul 2025
  • ES FIGURE 6.1 - ARCHAEOLOGICAL AND BUILT HERITAGE RECEPTORS Supporting Report · 07 Jul 2025
  • ES FIGURE 8.1 - ECOLOGICAL DESIGNATIONS Supporting Report · 07 Jul 2025
  • ES FIGURE 8.2- ECOLOGICAL MITIGATION AND ENHANCEMENTS Supporting Report · 07 Jul 2025
  • ES FIGURE 12.1 - GL2183 F1 - SITE CONTEXT Supporting Report · 07 Jul 2025
  • ES FIGURE 12.2 - GL2183 F2 - SITE LOCATION Supporting Report · 07 Jul 2025
  • ES FIGURE 12.3 - GL2183 F3 - LANDSCAPE DESIGNATION Supporting Report · 07 Jul 2025
  • ES FIGURE 12.4 - GL2183 F4 - TOPOGRAPHY Supporting Report · 07 Jul 2025
  • ES FIGURE 12.5 - GL2183 F5 - LANDSCAPE CHARACTER Supporting Report · 07 Jul 2025
  • ES FIGURE 12.6 - GL2183 F6 - VIEW Supporting Report · 07 Jul 2025
  • ES FIGURE 12.7 - GL2183 F7 - VIEWS 2 AND 3 Supporting Report · 07 Jul 2025
  • ES FIGURE 12.8 - GL2183 F8 - VIEWS 4 AND 5 Supporting Report · 07 Jul 2025
  • ES FIGURE 12.9 - GL2183 F9 - VIEWS 6 AND 7 Supporting Report · 07 Jul 2025
  • ES FIGURE 12.10 - GL2183 F10 - VIEWS 8 AND 9 Supporting Report · 07 Jul 2025
  • ES FIGURE 12.11 - GL2183 F11 - VIEWS 10 AND 11 Supporting Report · 07 Jul 2025
  • ES FIGURE 12.12 - GL2183 F12 - VIEWS 12 AND 13 Supporting Report · 07 Jul 2025
  • ES FIGURE 12.13 - GL2183 F13 - VIEW 14 Supporting Report · 07 Jul 2025
  • ES FIGURE 12.14 - GL2183 F14 - VIEW 15 Supporting Report · 07 Jul 2025
  • ES FIGURE 12.15 - GL2183 F15 - VIEW 16 Supporting Report · 07 Jul 2025
  • ES FIGURE 12.16 - GL2183 F16 - VIEWS 17 AND 18 Supporting Report · 07 Jul 2025
  • PHASE 5 ARBIRICULTURAL IMPACT ASSESSMENT 9307AIA.002 REV A Supporting Report · 07 Jul 2025
  • PLANNING STATEMENT - MAY 2025 V3.0 Supporting Report · 07 Jul 2025
  • COVERING LETTER 26-06-25 Case Correspondence · 07 Jul 2025
  • CIL FORM 1 CIL Form · 07 Jul 2025
  • CIL FORM 10 CIL Form · 07 Jul 2025

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Warwick for determination, against a statutory target of eight weeks. Over the last year Warwick decided full applications in a median of 119 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land South of Westwood Heath Road, Coventry

    DOC/25/0007 Submitted 4 Feb 2025 66m away

    94% historically approved · decision due ~1 Apr

    Application For Discharge of Condition 4 (Sample Materials) for Planning Application W/24/0963

    Awaiting decision Conditions 10 docs
  • Land South of Westwood Heath Road, Burton Green, Coventry

    DOC/24/0074 Submitted 4 Dec 2024 66m away

    94% historically approved · decision due ~1 Mar

    Application for Discharge of Condition 3 (Sample Materials) for planning permission W/21/1280

    Awaiting decision Conditions 8 docs
  • Land South of, Westwood Heath Road, Coventry

    DOC/25/0029 Submitted 8 May 2025 66m away

    94% historically approved · decision due ~3 Jul

    Application to Discharge of Conditions 4 (Electric Vehicle Recharging Points) & 6 (Cycle Parking) of planning permission W/24/1100

    Awaiting decision Conditions 10 docs
  • Land to the South of Westwood Heath Road, Burton Green, Coventry, CV4 8NS

    DOV/25/0002 Submitted 19 Sep 2025 115m away

    94% historically approved · decision due ~2 Dec

    Application for Deed of Variation of s106 Agreement in reference to planning permission W/17/2357 (proposed variation in relation to Mortgagee in Possession clause).

    Awaiting decision Conditions
  • Land to the South of Westwood Heath Road, Burton Green, Coventry

    DOC/26/0024 Submitted 7 May 2026 257m away

    94% historically approved · decision due ~2 Jul

    Application for the Discharge of Condition 15 (Construction Method Statement) in relation to Phase 2 of Planning Permission W/17/2357

    Awaiting decision Conditions 11 docs
  • Land to the South of Westwood Heath Road, Burton Green,Coventry

    W/21/0427 Submitted 8 Mar 2021 295m away

    Variation of conditions 4 (approved plans) and 26 (approved plans in relation to highway works) of planning permission W/17/2357 (Hybrid planning application for the erection of up to 425 dwellings [including detailed first phase of 129 dwellings with remainder of the site being outline including details of access], convenience store, open space, infrastructure provision and means of access onto Westwood Heath Road / agricultural access onto Bockendon Lane) to allow changes to the house types and the layout of the secondary roads within the detailed phase (129 dwellings) of the site. There are no material changes proposed to the approved development parcels within Phase 1.

    Granted Amendments 138 docs
    Major scheme

In Warwick

  • W/25/0302 Granted

    Topline Ventures Limited, Land off High Cross Lane, Pinley Green, CV35 7BG

    Erection of a rural workers dwelling together with all associated works.

    4 Mar 2025 Full applications
  • W/26/0442 Withdrawn

    Birches Wood Farm, Crackley Lane, Kenilworth, CV8 2JT

    Demolition of existing dwelling and erection of replacement self-build dwelling and the installation of a package sewage treatment plant.

    31 Mar 2026 Full applications
  • W/26/0623 Granted

    31 Highland Road, Kenilworth, CV8 2EU

    Erection of a two-storey rear extension and first floor side and rear extensions, addition of a new garden room to the rear of the existing external store and addition of Cotswold stone finish and all associated works.

    6 May 2026 Full applications
  • W/26/0193 Granted

    64-66 Market Place, Warwick

    Proposed new metal staircase to replace existing spiral external staircase.Alteration to existing roof to accomodate new staircase.

    6 Feb 2026 Full applications
  • W/26/1207 Awaiting decision

    24 Russell Street, Leamington Spa, CV32 5QB

    Change of use of ground floor from bar / nightclub (Sui Generis) to Class E office use and associated works.

    18 Aug 2026 Full applications