Planning application
Land West of Firefly Road, Baginton
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Full application for the erection of commercial buildings, with associated infrastructure, landscaping, drainage, ground modelling and access.
As published by the council, reference W/25/0816
Application record
- Reference
- W/25/0816
- Type
- Planning Permission
- Status
- Unknown
- Received
- 9 Jun 2025
- Validated
- 27 Jun 2025
- Ward
- Cubbington and Leek Wootton
- Parish
- Baginton
Timeline
Dates from the published record
-
9 Jun 2025
Received by Warwick
-
27 Jun 2025
Validated
Checked as complete and ready for consideration.
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 22 August 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Warwick took a median of 68 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Oxalis Planning Ltd Agent, a planning consultancy registered in Loughborough
Active · incorporated 2010 · Loughborough
84 applications on PlanIndex · across 6 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
195 documents on file for this application
- WCC Highways Authority
- Committee Decisions
- Update Report
- Mr steve williams-Objects-The Willows Holly Walk BAGINTON(FULL)
- National Highways response
- CLLR BEN EDWARDS-OBJECTS-10 HALL CLOSE STONELEIGH(FULL)
- Committee Report - Single Report
- cover email with attachment from Senior Energy and Carbon Advisor
- Senior Carbon and Energy Adviser
- NATIONAL HIGHWAYS
- WCC Flood Risk Management
- Conservation comment
- CLLR Ben Edwards-Objects-10 Hall Close Stoneleigh(FULL)
- HISTORIC ENGLAND RESPONSE
- NZC Proforma
- -NZC_proforma.-1878892 - CPW Comments.
- UNIT 1 -12 MAT 01 LCA OPTIONS APPRAISAL DOCUMENT STAGE 2
- Energy and Climate Change Adaptation Statement
- Planting plan Sheet 1of2_1-500-A0
- LANDSCAPE CONCEPT-PLAN-1-1000-A1
- BAGINTON PARISH COUNCIL
- Drainage Strategy.
- Drainage Design Strategy Addendum
- TRANSPORT TECHNICAL NOTE
- LANDSCAPE CONCEPT PLANTING PLAN SHEET 1 OF 2
- LANDSCAPE CONCEPT PLAN
- Mrs Janet Goggins-Crabtree-Objects-24 Oak Close Baginton Village Coventry(FULL)
- Health and community Protection
- CLLR JOSH PAYNE
- WCC Flood Risk Management
- NATIONAL HIGHWAYS
- COVER EMAIL FROM AGENT RE TO ADDRESS EHO'S COMMENTS
- REVISED NOISE IMPACT ASSESSMENT
- Landscape Typologies Plan.
- WCC Landscape team response
- Health and community Protection
- RESPONSE TO LANDSCAPE COMMENTS
- MAINTENANCE PROPOSALS
- LANDSCAPE PLANTING PLAN SHEET 2OF2_1-500-A0.
- LANDSCAPE PLANTING PLAN SHEET 1OF2_1-500-A0.
- LANDSCAPE CONCEPT SECTS SHEET 2OF2-1-200-A1
- LANDSCAPE CONCEPT SECTS SHEET 1OF2-1-200-A1
- LANDSCAPE CONCEPT PLAN 1-1000-A1
- SOFT LANDSCAPE MAINTENANCE PROPOSALS.
- RESPONSE TO GST COMMENTS 0925 V1
- Drainage Strategy
- Drainage Design Strategy Addendum
- Air_Quality_Assessment_FINAL
- Response to Landscape Comments 0925 V1
- Detailed Planting Plan ( sheet 2 of 2)
- Detailed Planting Plan ( sheet 1 of 2)
- Concept Sects_Sheet 2of2
- Concept Sects_Sheet 1of2
- concept-plan-
- AIR QUALITY ASSESSMENT
- CLLR PAM RADFORD -CUBBINGTON AND LEEK WOOTTON WARD
- WCC Highways
- Mr Andrew Robinson-Objects-1 Lunt Cottages Coventry Road Baginton Coventry(FULL)
- Mr Walter Bush-Objects-1 Market Corner Coventry Road Baginton(FULL)
- Mr Andrew Robinson-Objects-1 Lunt Cottages Coventry Road Baginton Coventry(FULL)
- WCC Ecology
- LANDSCAPE & VISUAL APPRAISAL
- Mrs A bush-Objects-1 Coventry Road baginton Warks(FULL)
- WCC LANDSCAPE TEAM
- Mrs Julie Robinson-Objects-1 Lunt Cottages Baginton(FULL)
- Mrs Sheila Aldridge-Objects-Home Farm House Church Road, Baginton Coventry(FULL)
- WDC - ENVIRONMENTAL HEALTH
- Cover email with attachment
- WDC - Green Spaces Team
- COVENTRY CITY COUNCIL - ARCHAEOLOGY
- Mr Malcolm Cluff-Objects-32 rowley road Coventry(FULL)
- BAGINTON PARISH COUNCIL
- Coventry City Council
- Miss Terri Wells-Objects-12 Frances road Baginton Coventry(FULL)
- Mr Roger Horsfall-Objects-The Mews, Home Farm Church Road Baginton(FULL)
- CLLR Benjamin Edwards-Objects-10 Hall Close Stoneleigh(FULL)
- National Highways
- WCC Local Lead Flood Authority
- RHEBA HORSFALL- THE MEWS, HOME FARM, CHURCH ROAD BAGINTON
- Miss Chris England-Objects-7 Kimberley Road Baginton Coventry(FULL)
- CLLR PAM REDFORD
- Steve Williams - The Willows, Holly Walk Baginton
- Miss Tracie Ball-Objects-59 Meadow Road Wolston Coventry(FULL)
- Bubbenhall Parish Council - response
- Mrs Rheba Horsfall-Objects-The Mews, Home Farm Church Road Baginton(FULL)
- Historic England
- Mr Steve Williams-Objects-The Willows Holly Walk BAGINTON(FULL)
- NZC proforma.
- bioregional cover email
- WARWICKSHIRE FIRE & RESCUE
- email from Baginton P/C
- WCC Police response
- Mr Jonathan Smith -Objects-UK Battery Industrialisation Centre Rowley Road Coven
- WCC Fire & Rescue Services
- WCC Warwick Fire and Rescue Service
- Heritage Statement
- Heritage Covering Statement
- Noise Impact Statement
- APPLICATION FORM REDACTED
- TRANSPORT STATEMENT
- TRANSPORT STATEMENT - APPENDIX A, B, C & D
- TRAVEL PLAN - PART 1
- TRAVEL PLAN - PART 2
- FLOOD RISK ASSESSMENT
- DRAINAGE STRATEGY PART 1
- DRAINAGE STRATEGY PART 2
- BIODIVERSITY NET GAIN ASSESSMENT
- APPENDIX A STATUTORY METRIC REV A
- ECOLOGICAL APPRAISAL
- LANDSCAPE & VISUAL APPRAISAL
- ENERGY AND CLIMATE CHANGE ADAPTATION STATEMENT
- EXTERNAL LIGHTING REPORT
- AIR QUALITY ASSESSMENT
- NOISE IMPACT ASSESSMENT
- LANDSCAPE DESIGN STATEMENT
- SOFT LANDSCAPE WORKS MAINTENANCE AND MANAGEMENT PROPOSALS
- LANDSCAPE CONCEPT PLAN
- CONCEPT SECTIONS (SHEET 1 OF 2)
- CONCEPT SECTIONS (SHEET 2 OF 2)
- DETAILED PLANTING PLAN (SHEET 1 OF 2)
- DETAILED PLANTING PLAN (SHEET 2 OF 2)
- TREE PIT, STAKING, & PLANT PROTECTION DETAILS
- GROUND CONDITIONS DESK STUDY REPORT PART 1
- GROUND CONDITIONS DESK STUDY REPORT PART 3
- GROUND CONDITIONS DESK STUDY REPORT PART 2
- GROUND CONDITIONS DESK STUDY REPORT PART 4
- GROUND CONDITIONS DESK STUDY REPORT PART 5
- GROUND CONDITIONS DESK STUDY REPORT PART 6
- GROUND CONDITIONS DESK STUDY REPORT PART 7
- UNITS 1 & 2 PROPOSED EXTERNAL LIGHTING LAYOUT
- UNITS 3 & 5 PROPOSED EXTERNAL LIGHTING LAYOUT
- UNITS 6 & 7 PROPOSED EXTERNAL LIGHTING LAYOUT
- UNITS 8 & 9 PROPOSED EXTERNAL LIGHTING LAYOUT
- ACCESS ROADS PROPOSED EXTERNAL LIGHTING LAYOUT
- UNITS 10, 11 & 12 PROPOSED EXTERNAL LIGHTING LAYOUT
- UNIT 1 - GA GROUND FLOOR PLAN
- UNIT 1 - GA ROOF PLAN
- UNIT 1 GA ELEVATIONS
- UNIT 1 - OFFICE FLOOR PLANS
- UNIT 2 - GA GROUND FLOOR PLAN
- UNIT 2 - GA ROOF PLAN
- UNIT 2 GA ELEVATIONS
- UNIT 2 - OFFICE FLOOR PLANS
- UNIT 3 - GA GROUND FLOOR PLAN
- UNIT 3 - GA ROOF PLAN
- UNIT 3 GA ELEVATIONS
- UNIT 3 - OFFICE FLOOR PLANS
- UNIT 4 - GA GROUND FLOOR PLAN
- UNIT 4 - GA GROUND FLOOR PLAN
- UNIT 4 GA ELEVATIONS
- UNIT 4 - OFFICE FLOOR PLANS
- UNIT 5 - GA GROUND FLOOR PLAN
- UNIT 5 - GA ROOF PLAN
- UNIT 5 GA ELEVATIONS
- UNIT 5 - OFFICE FLOOR PLANS
- UNIT 6 - GA GROUND FLOOR PLAN
- UNIT 6 - GA ROOF PLAN
- UNIT 6 GA ELEVATIONS
- UNIT 6 - OFFICE FLOOR PLANS
- UNIT 8 - GA GROUND FLOOR PLAN
- UNIT 8 - GA ROOF PLAN
- UNIT 8 GA ELEVATIONS
- UNIT 8 - OFFICE FLOOR PLANS
- UNIT 9 - GA GROUND FLOOR PLAN
- UNIT 9 - GA ROOF PLAN
- UNIT 9 GA ELEVATIONS
- UNIT 9 - OFFICE FLOOR PLANS
- UNITS 10, 11 & 12 - GA GROUND FLOOR PLAN
- UNITS 10, 11 & 12 - ROOF PLAN
- UNIT 10, 11 & 12 GA ELEVATIONS
- UNIT 10 - OFFICE FLOOR PLANS
- UNIT 11 - OFFICE FLOOR PLANS
- UNIT 12 - OFFICE FLOOR PLANS
- UNIT 7 - GA GROUND FLOOR PLAN
- UNIT 7 - GA ROOF PLAN
- UNIT 7 GA ELEVATIONS
- UNIT 7 - OFFICE FLOOR PLANS
- PROPOSED SERVICES DRAWING
- PROPOSED EASEMENT DRAWING
- CYCLE SHELTERS DETAILS
- BIN STORES DETAILS
- EXTERNAL FINISHES PLAN
- FENCING AND BARRIERS DETAILS
- PROPOSED DRAINAGE STRATEGY
- SITE LOCATION PLAN
- SITE LAYOUT PLAN
- EARTHWORK VOLUMES
- PROPOSED LEVELS
- DESIGN AND ACCESS STATEMENT PART 1
- DESIGN AND ACCESS STATEMENT PART 2
- DESIGN AND ACCESS STATEMENT PART 3
- DESIGN AND ACCESS STATEMENT PART 4
- PLANNING STATEMENT
- APPLICATION DOCUMENTS SCHEDULE
- COVERING LETTER
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Warwick for determination, against a statutory target of eight weeks. Over the last year Warwick decided full applications in a median of 116 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Warwick
-
W/26/1297 Awaiting decision
Lower Norton Farm, 20 Henley Road, Lower Norton, Norton Lindsey, Warwick, CV35 8RB
Alterations and retention of building and retrospective change of use of equine yard to Commercial use to include retail sale, service, repair, body work and preparation for the sale of motor cars, vans, trailers, lorries and motorcycles and plant together with the retail sale of these vehicles.
-
W/26/1253 Awaiting decision
Holly Farm Business Park, Honiley Road, Honiley, Kenilworth, CV8 1NP
Erection of a single storey building for storage use falling with Class B8 of the Use Classes Order.
-
W/25/0302 Granted
Topline Ventures Limited, Land off High Cross Lane, Pinley Green, CV35 7BG
Erection of a rural workers dwelling together with all associated works.
-
W/26/0442 Withdrawn
Birches Wood Farm, Crackley Lane, Kenilworth, CV8 2JT
Demolition of existing dwelling and erection of replacement self-build dwelling and the installation of a package sewage treatment plant.
-
W/26/1218 Awaiting decision
34 Hamilton Terrace, Leamington Spa, CV32 4LY
Proposed change of use from office (Use Class E) to single dwelling house (Use Class C3) and internal alterations with bricked up first floor window opening to the north-east elevation