Planning application
45 Larpent Avenue SW15 6UU
Works: Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Alterations to existing double garage including installation of windows and french doors to front elevation and installation of two sky lights to roof in connection with its use as habitable annexe space.
As published by the council, reference 2026/3012
Application record
- Reference
- 2026/3012
- Status
- REGISTERED
- Received
- 27 Aug 2026
- Postcode
- SW15 6UU
Timeline
Dates from the published record
-
27 Aug 2026
Received by Wandsworth
-
27 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 22 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Wandsworth took a median of 60 days over the applications it decided in the last year.
What happens while it is decided
The process from here
This application is with Wandsworth for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Wandsworth is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
33 Larpent Avenue SW15 6UU
Alterations to include replacement roof to mansard roof extension and roof of single storey rear extension. Replacement of all windows with timber double glazed units.
Granted Other Extension Loft or dormer +2 14 docsSmall domestic -
28 Larpent Avenue SW15 6UU
87% historically approved · decision due ~19 May
T1-Tree Privet Outgrown location in the shrub border, suggested works are to reduce by up to 1.5m from branch tips to create a more compact shape
Awaiting decision Trees -
37 Larpent Avenue SW15 6UU
Erection of single-storey rear extension.
Granted Householder Extension 10 docsSmall domestic -
18 Larpent Avenue SW15 6UU
Ash (T1) - Fell. Ash (T2) - Remove overlong branch towards neighbours property to rear back to main stem. Bay laurel (T3) - Reduce height by 3m from tips. Fig (T4) - reduce long laterals back by 3m from tips. Holly (T5) - Old Hedge row tree: Fell. Pittosporum and various species (G1) - Reduce by 1m from tips.
Decided Trees 3 docs -
45 Larpent Avenue SW15 6UU
Replacement of garage door with new windows in connection with the conversion into habitable accommodation.Erection of proposed pitched roof including mezzanine level to the existing garage.
Refused Householder Windows or glazing 7 docsDomestic -
45 Larpent Avenue SW15 6UU
Erection of a single storey rear and side extension, erection of a new boundary wall and railings. Widening of vehicle entrance.
Granted Householder Extension 8 docsSmall domestic