Skip to content
PlanIndex Get alerts
Menu

Planning application

Unit E.NR03, Plot E, South London Mail Centre 53 Nine Elms Lane SW8 5BB

Awaiting decision Wandsworth 2026/2570

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Submission of details pursuant to the discharge of Conditions 4 (noise insulation measures), 5 (external ventilation equipment) and 6 (servicing and delivery plan) of planning permission 2024/0913 dated 10/03/2025 (Use of part of the ground and lower ground floors of Plot E for Class E purposes)

As published by the council, reference 2026/2570

Application record

Reference
2026/2570
Status
Pending As published: REGISTERED
Received
2 Sep 2026
Ward
VNEB
Postcode
SW8 5BB

Site history

Applications at this address on the Wandsworth register

This site has had 2 applications since 2026.

  • 2026/2593 Withdrawn

    Unit E.NR03, Plot E, South London Mail Centre 53 Nine Elms Lane SW8 5BB

    Submission of details pursuant to the discharge of Condition 10 (Class E use) of planning permission 2024/0913 dated 10/03/2025 (Use of part of the ground and lower ground floors of Plot E for Class E purposes.).

    Submitted 17 Jul 2026 Full applications

Timeline

Dates from the published record

  1. 25 Jul 2026

    Added to PlanIndex

  2. 10 Aug 2026

    Status changed to NONINVALID

    Previously NEW.

  3. 2 Sep 2026

    Received by Wandsworth

  4. 2 Sep 2026

    Status changed to REGISTERED

    Previously NONINVALID.

  5. Decision

    Awaiting decision

    Decision expected by 28 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Wandsworth took a median of 61 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Wandsworth for determination, against a statutory target of eight weeks. Over the last year Wandsworth's median decision took 61 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Wandsworth's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • South London Mail Centre 53 Nine Elms Lane SW8 5BB

    2026/2887 Submitted 25 Aug 2026 50 yards away

    89% historically approved · decision due ~20 Oct

    Submission of details pursuant to the partial discharge of Condition 39 (Low Emissions Strategy) of planning permission 2019/2250 dated 18/12/2020 in respect of Blocks B1, B2 and D3.

    Awaiting decision
  • South London Mail Centre 53 Nine Elms Lane SW8 5BB

    2026/1560 Submitted 24 Jun 2026 50 yards away

    89% historically approved · decision due ~19 Aug

    Matters relating to a S106 Agreement in respect of the assessment of the carbon dioxide emissions of the completed Development for Plots E and F required under Schedule Three, Part Three, Paragraph 8.2 of the S106 Agreement dated 25/10/21 associated with planning permission 2021/0654.

    Awaiting decision
  • South London Mail Centre 53 Nine Elms Lane SW8 5BB

    2026/2592 Submitted 4 Aug 2026 50 yards away

    89% historically approved · decision due ~29 Sep

    Matters relating to a S106 Agreement pursuant to Clauses 14.3 (a) and 14.3 (d) of the S106 Agreement  dated 25/10/2021 associated with Planning Permission 2021/0654 (Application for variation of s106 Agreement dated 18th December 2020 associated with Planning Application Ref: 2019/2250).

    Awaiting decision
  • Unit B, Plot D, 55 Nine Elms Lane

    2026/1009 Submitted 12 Mar 2026 50 yards away

    Submission of details purusant to the discharge of Condition

    Withdrawn Full applications
  • South London Mail Centre 53 Nine Elms Lane SW8 5BB

    2023/0288 Submitted 25 Jan 2023 50 yards away

    Submission of Post-excavation assessment report pursuant to Condition 37 (Archaeology) of planning permission 2019/2250 dated 28th March 2019 in relation to Plot C2 only.

    Granted Full applications 5 docs
  • South London Mail Centre 53 Nine Elms Lane SW8 5BB

    2021/2595 Submitted 1 Jun 2021 50 yards away

    Submission of details pursuant to the partial approval of Condition 59 (Phasing Plan) for Plots E, F and G only of planning permission 2019/2250 dated 18th December 2020: "Application under Section 73 of the Town and Country Planning Act 1990 for variations to Conditions 9 (Parameter Plans), 10 (GEA Floorspace Limits), 34 (BREEAM) and 52 (Wind Mitigation) of part outline and part detail planning permission 2017/6762 dated 28th March 2019 for "Minor Material Amendment pursuant to Conditions 1 (time limit), 2 (time limit for reserved matters), 9 (parameter plans), 11 (Maximum Floorspaces), 15 (distribution and internal configuration of residential units for each plot), 32 (construction sequence and delivery plan) and 41 (land and groundwater contamination) of part outline and part detailed planning permission 2016/2424, dated 23rd January 2017 for "Minor Material Amendment pursuant to Conditions 3 (reserved matters), 9 (parameter plans), 10 (GEA floorspace limits), 13 (residential unit limit), 18 (car parking space limit), 32 (B8 use restriction) and 41 (land and groundwater contamination) of part outline and part detailed planning permission 2011/2462, dated 30/03/12 for demolition of all existing buildings and construction of a mixed use redevelopment comprising 7 building plots with buildings up to 23 storeys high to provide residential units; commercial and community floorspace; associated basement parking and part of the 'Nine Elms Linear Park'. All matters reserved apart from the appearance and scale of Blocks B1, D1 & G and two new access points from Nine Elms Lane." An addendum to the Environmental Statement has been submitted under The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended)."

    Granted Full applications Demolition 5 docs