Skip to content
PlanIndex Get alerts
Menu

Planning application

133 Burntwood Lane SW17 0AJ

Granted Wandsworth 2026/1031 Application for Full Permission

Works: Extension Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations including erection of mansard roof extension to main rear roof and extension above part of two-storey back addition.

As published by the council, reference 2026/1031

Application record

Reference
2026/1031
Type
Application for Full Permission
Status
FINAL DECISION
Decision
Approve with Conditions
Received
13 Mar 2026
Validated
26 Mar 2026
Decided
14 May 2026
Ward
Wandsworth Common
Decision by
Delegated Standard
Postcode
SW17 0AJ

Timeline

Dates from the published record

  1. 13 Mar 2026

    Received by Wandsworth

  2. 26 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 14 May 2026

    Decision issued: Approve with Conditions

  4. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 129 Burntwood Lane SW17 0AJ

    2025/4458 Submitted 10 Dec 2025 8m away

    Installation of bi-folding door to rear elevation at ground floor level; replacement of side elevation door with window.

    Granted Full applications Windows or glazing 9 docs
  • 141 Burntwood Lane SW17 0AJ

    2026/1516 Submitted 22 Apr 2026 15m away

    Installation of an external staircase to the rear of the property and blocking up of rear door at ground floor level

    Granted Full applications 11 docs
  • 65 Burntwood Lane SW17 0AJ

    2026/1744 Submitted 8 Jun 2026 40m away

    89% historically approved · decision due ~3 Aug

    Alterations including the removal of two existing rear windows to accommodate new bi-folding doors at ground floor level

    Awaiting decision Windows or glazing
  • 127 Burntwood Lane SW17 0AJ

    2026/3069 Submitted 26 Aug 2026 41m away

    89% historically approved · decision due ~21 Oct

    Proposed L-Shaped Mansard Loft Conversion, Rooflights, Rear Dormer Windows and External Staircase

    Awaiting decision Full applications Loft or dormer Windows or glazing
  • 105 Burntwood Lane SW17 0AJ

    2026/1179 Submitted 25 Mar 2026 51m away

    Erection of a single storey outbuilding in rear garden.

    Granted Full applications 7 docs
    Small domestic
  • 174 Tranmere Road SW18 3QU

    2026/2327 Submitted 30 Jun 2026 99m away

    Non-material amendment to planning permission dated 24/09/2025 ref 2025/2609 (Alterations including erection of mansard roof extension to main rear roof (with French doors and safety railings) and erection of extension above part of two-storey back addition; formation of roof terrace above part of two-storey back addition with 1.7m high screen surround ) so as to allow minor design amendments to the fenestration style approved

    Granted Extension Loft or dormer +1

In Wandsworth

  • 2026/3090 Awaiting decision

    73 Bickersteth Road SW17 9SH

    Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations

    27 Aug 2026 Full applications
  • 2026/3095 Awaiting decision

    Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY

    Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.

    27 Aug 2026 Full applications
  • 2026/3094 Awaiting decision

    64 Hillbury Road London Wandsworth SW17 8JT

    Installation of four replacement windows

    27 Aug 2026 Full applications
  • 2026/3082 Awaiting decision

    The Ship 41 Jews Row London Wandsworth SW18 1TB

    Installation of new external AC condensers and relocation of existing external condenser

    27 Aug 2026 Full applications
  • 2026/3073 Awaiting decision

    1 Gracedale Road SW16 6SW

    Single storey rear extension to house a dining room. Alterations to the existing side stores to form part of the new kitchen. Works to include upgrading the fabric of the existing stores and providing a new roof and rooflights to the stores. Replacement windows to the side and rear of the existing house.

    26 Aug 2026 Full applications