Skip to content
PlanIndex Get alerts
Menu

Planning application

129 Burntwood Lane SW17 0AJ

Granted Wandsworth 2025/4458 Application for Full Permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of bi-folding door to rear elevation at ground floor level; replacement of side elevation door with window.

As published by the council, reference 2025/4458

Application record

Reference
2025/4458
Type
Application for Full Permission
Status
FINAL DECISION
Decision
Approve with Conditions
Received
10 Dec 2025
Validated
29 Dec 2025
Decided
10 Feb 2026
Ward
Wandsworth Common
Decision by
Delegated Standard
Postcode
SW17 0AJ

Timeline

Dates from the published record

  1. 10 Dec 2025

    Received by Wandsworth

  2. 29 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 10 Feb 2026

    Decision issued: Approve with Conditions

  4. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 133 Burntwood Lane SW17 0AJ

    2026/1031 Submitted 13 Mar 2026 8m away

    Alterations including erection of mansard roof extension to main rear roof and extension above part of two-storey back addition.

    Granted Full applications Extension Loft or dormer 9 docs
  • 141 Burntwood Lane SW17 0AJ

    2026/1516 Submitted 22 Apr 2026 23m away

    Installation of an external staircase to the rear of the property and blocking up of rear door at ground floor level

    Granted Full applications 11 docs
  • 65 Burntwood Lane SW17 0AJ

    2026/1744 Submitted 8 Jun 2026 32m away

    89% historically approved · decision due ~3 Aug

    Alterations including the removal of two existing rear windows to accommodate new bi-folding doors at ground floor level

    Awaiting decision Windows or glazing
  • 127 Burntwood Lane SW17 0AJ

    2026/3069 Submitted 26 Aug 2026 33m away

    89% historically approved · decision due ~21 Oct

    Proposed L-Shaped Mansard Loft Conversion, Rooflights, Rear Dormer Windows and External Staircase

    Awaiting decision Full applications Loft or dormer Windows or glazing
  • 105 Burntwood Lane SW17 0AJ

    2026/1179 Submitted 25 Mar 2026 43m away

    Erection of a single storey outbuilding in rear garden.

    Granted Full applications 7 docs
    Small domestic
  • 174 Tranmere Road SW18 3QU

    2026/2327 Submitted 30 Jun 2026 103m away

    Non-material amendment to planning permission dated 24/09/2025 ref 2025/2609 (Alterations including erection of mansard roof extension to main rear roof (with French doors and safety railings) and erection of extension above part of two-storey back addition; formation of roof terrace above part of two-storey back addition with 1.7m high screen surround ) so as to allow minor design amendments to the fenestration style approved

    Granted Extension Loft or dormer +1

In Wandsworth

  • 2026/3090 Awaiting decision

    73 Bickersteth Road SW17 9SH

    Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations

    27 Aug 2026 Full applications
  • 2026/3096 Awaiting decision

    1 B Gorst Road London Wandsworth SW11 6JB

    Replacement boundary walls/gates

    27 Aug 2026 Full applications
  • 2026/3087 Awaiting decision

    30 Eversleigh Road SW11 5XA

    Rebuilding rear return ground floor infill extension, 1st floor rear return extension and 2nd floor loft conversion with front rooflights and rear dormers.

    27 Aug 2026 Full applications
  • 2026/3095 Awaiting decision

    Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY

    Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.

    27 Aug 2026 Full applications
  • 2026/3094 Awaiting decision

    64 Hillbury Road London Wandsworth SW17 8JT

    Installation of four replacement windows

    27 Aug 2026 Full applications