Skip to content
PlanIndex Get alerts
Menu

Planning application

Booker Cash & Carry and BMW Car Service Garage 41-49 and 49-59 Battersea Park Road London SW8 5AL

Awaiting decision Wandsworth 2025/4299 Matters relating to a S106 Agreement

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Matters relating to a Section 106 Agreement pursuant to the District Heating Network Statement required under Schedule 2, Part 9, Clause 3 associated with planning permission 2022/1835 dated 06/06/2025 (Demolition of the existing building and construction of three new buildings (between 12 and 22 storeys in height), together comprising 55 residential units (Use Class C3) and Student Accommodation comprising 762 student bedrooms (Sui Generis) along with 495sqm (GIA) flexible Commercial, Business and Service (Use Class E) and/or Local Community and Learning (Class F) floorspace with associated works including hard and soft landscaping, car parking, new vehicular access/servicing, and other ancillary works.)

As published by the council, reference 2025/4299

Application record

Reference
2025/4299
Type
Matters relating to a S106 Agreement
Status
Pending As published: REGISTERED
Received
26 Nov 2025
Validated
4 Dec 2025
Ward
Nine Elms
Postcode
SW8 5AL

Site history

Applications at this address on the Wandsworth register

This site has had 2 applications since 2025.

  • 2025/4029 Withdrawn

    Booker Cash & Carry and BMW Car Service Garage 41-49 and 49-59 Battersea Park Road London SW8 5AL

    Deed of Variation to the S106 Legal Agreement associated with PP2022/1835 (Demolition of the existing building and construction of three new buildings (between 12 and 22 storeys in height), together comprising 55 residential units (Use Class C3) and Student Accommodation comprising 762 student bedrooms (Sui Generis) along with 495sqm (GIA) flexible Commercial, Business and Service (Use Class E) and/or Local Community and Learning (Class F) floorspace with associated works including hard and soft landscaping, car parking, new vehicular access/servicing, and other ancillary works. (This is a revised scheme. The revisions include alterations to the internal layout of plots 1, 2, and 3 in relation to the provision of wheelchair accessible and adaptable dwellings and increasing the size of balconies on floor 11 of plot 1. The previous revisions (May 2024 consultation) included a reduction inheight of plot 1, internal alterations, a reduction in student accommodation and residential dwellings, changes to tenure, an increase in community floorspace and alterations to landscaping, play space, parking and public realm works.) ).

    Submitted 6 Nov 2025 Conditions

Timeline

Dates from the published record

  1. 26 Nov 2025

    Received by Wandsworth

  2. 4 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 29 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 29 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Wandsworth took a median of 57 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Wandsworth for determination, against a statutory target of eight weeks. Over the last year Wandsworth decided condition discharge and variation applications in a median of 101 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 41-49 Battersea Park Road SW8 5AL

    2025/3822 Submitted 23 Oct 2025 50 yards away

    90% historically approved · decision due ~29 Dec

    Submission of details pursuant to the discharge of Condition 20 (Demolition and Construction Environmental Management Plan) of planning permission 2022/1835 dated 06/06/2025 (Application for phased full planning permission for: demolition of all existing buildings and construction of three new buildings, together comprising residential (Use Class C3) and student accommodation (Sui Generis) along with commercial, business and service (Use Class E) and/or local community and learning (Class F) floorspace. Associated works include hard and soft landscaping, car parking and new vehicular access / servicing, and other ancillary works).

    Awaiting decision Full applications Demolition 15 docs
  • 41-49 Battersea Park Road SW8 5AL

    2025/3320 Submitted 22 Sep 2025 50 yards away

    Submission of details pursuant to the partial discharge of Condition 4 (Site Contamination) of planning permission 2022/1835 dated 06/06/2025 (Application for phased full planning permission for: demolition of all existing buildings and construction of three new buildings, together comprising residential (Use Class C3) and student accommodation (Sui Generis) along with commercial, business and service (Use Class E) and/or local community and learning (Class F) floorspace. Associated works include hard and soft landscaping, car parking and new vehicular access / servicing, and other ancillary works).

    Granted Full applications Demolition 11 docs
  • 41-49 Battersea Park Road SW8 5AL

    2025/3318 Submitted 22 Sep 2025 50 yards away

    Submission of details pursuant to the discharge of Condition 16 (Stage 1 written scheme of investigation (WSI) Archaeology) of planning permission 2022/1835 dated 06/06/2025 (Application for phased full planning permission for: demolition of all existing buildings and construction of three new buildings, together comprising residential (Use Class C3) and student accommodation (Sui Generis) along with commercial, business and service (Use Class E) and/or local community and learning (Class F) floorspace. Associated works include hard and soft landscaping, car parking and new vehicular access / servicing, and other ancillary works).

    Granted Full applications Demolition 8 docs
  • 41-49 Battersea Park Road SW8 5AL

    2025/3321 Submitted 22 Sep 2025 50 yards away

    Submission of details pursuant to the discharge of Condition 18 (PM10 Continuous Monitoring) of planning permission 2022/1835 dated 06/06/2025 (Application for phased full planning permission for: demolition of all existing buildings and construction of three new buildings, together comprising residential (Use Class C3) and student accommodation (Sui Generis) along with commercial, business and service (Use Class E) and/or local community and learning (Class F) floorspace. Associated works include hard and soft landscaping, car parking and new vehicular access / servicing, and other ancillary works).

    Granted Full applications Demolition 5 docs
  • 41-49 Battersea Park Road SW8 5AL

    2026/0543 Submitted 9 Feb 2026 50 yards away

    TPO395/2009 T01 - London Plane: Crown lift northeast aspect to provide a 7-8m ground clearance over the carriageway/junction. TPO395/2009 T02-T06 - Common Lime / London Plane: Crown lift north to northwest aspect to provide a 6m ground clearance over the carriage way and 5m over the pedestrian foot path.

    Granted Trees 3 docs
  • 41-49 Battersea Park Road SW8 5AL

    2025/4276 Submitted 25 Nov 2025 50 yards away

    Application under Section 96A of the Town and Country Planning Act 1990 for non-material amendments to planning permission reference 2022/1835 (appeal reference APP/H5960/W/24/3358065) including a Deed of Variation to the S106 Legal Agreement associated with the planning permission, involving changes to the tenure of affordable housing to enable the occupation of all 55 affordable dwellings as social rent and amendments to the time period in which 'Substantial Implementation' prior the triggering of the early stage viability review and introduction of a cascade fall-back mechanism that switches the affordable housing contribution to a Payment in Lieu if the transfer of affordable housing is not carried out at completion.

    Withdrawn Amendments 4 docs

In Wandsworth

  • 2026/0930 Granted

    New Covent Garden Market, Nine Elms Lane SW8

    Matters relating to Schedule 3, Part 1, Paragraph 5 of the S106 Agreement dated 11/02/15 associated with planning permission 2014/2810 (Planning application for part outline and part detail planning permission for:(a) demolition of existing wholesale Fruit and Vegetable and Flower Market and ancillary buildings and structures, and residential building on Nine Elms Lane (apart from the existing multi storey car park);(b) Construction of mixed-use redevelopment comprising: a new Fruit and Vegetable Market and Flower Market and ancillary uses, including temporary and permanent façade; refurbishment and extension of existing waste collection area (including rooftop sports pitches); residential dwellings; flexible commercial uses, including retail, financial and professional services, café/restaurant, bar uses and hot food takeaways and offices; non-residential institutions; assembly and leisure uses; temporary storage and distribution buildings and associated works; associated car, cycle and motorcycle parking and servicing and new vehicle accesses, energy centres; and landscaping public realm and open space including part of the Linear Park. All matters reserved apart from access, details of all new markets and supporting buildings, and details of Building N8 and associated landscaping);(c) Site clearance and enabling works. An Environmental Statement has been submitted with the application under The Town and Country Planning (Environmental Impact Assessment) Regulations 2011.

    Received 6 Mar, published by the council 29 Jul 2026 Conditions
  • 2025/1644 Granted

    Market Towers, 1 Nine Elms Lane, SW8

    Matters relating to a S106 Agreement in respect of the written evidence of the transfer or lease of the Affordable Housing Units required under Schedule 3, Part 1, Paragraphs 4 (b), 5 (b), and 6 (b) of the S106 Agreement associated with planning permission ref: 2022/1343 dated 19/07/23 (Deed of Variation to the S106 Legal Agreement of the planning permission 2014/0871 (as amended) dated 26th August 2014 for minor-material amendments, under Section 73 of the Town and Country Planning Act, to planning permission 2012/0380 "Demolition of existing buildings and structures. Erection of two new buildings of 58 storeys (up to 200m above ground) and 43 storeys (up to 161m above ground) high to provide up to 494 residential units, retail uses (classes A1-A4); a hotel (class C1) together with a high level viewing space; provision of private and public open spaces; vehicular access and reconfigured vehicular access routes; provision of cycle, motorcycle and car parking, servicing and energy centre within the two level basement; landscaping; excavation works; and other associated works".).

    Received 8 May, published by the council 29 Jul 2026 Conditions
  • 2026/0289 Granted

    South London Mail Centre 53 Nine Elms Lane SW8 5BB

    Matters relating to a S106 Agreement pursuant to the Affordable Workspace Management Plan required under Schedule 3, Part 7, Paragraph 1.2 of the S106 Agreement dated 22nd October 2021 associated with planning permission 2020/5054 (Erection of an eleven-storey building with rooftop terrace and basement comprising predominantly office (Class E) floorspace at ground and upper levels and flexible commercial/community (Class E) floorspace at ground level together with landscaping and other associated works).

    Received 21 Jan, published by the council 29 Jul 2026 Conditions
  • 2025/1529 Granted

    Phase 3 Peabody Estate (Block 3D), St Johns Hill SW11 1UA

    Matters relating to S106 Schedule 10, Part 1.1, Be Seen energy performance indicators to Block 3D pursuant to planning permission dated 03/11/2022 ref 2021/5678 (Variation of Condition 15 (in accordance with approved drawings), Condition 24 (lifetime homes standards), Condition 25 (Code for Sustainable Homes Interim (Design Stage) Certificate), Condition 28 (Energy Performance Certificate), Condition 32 (secure cycle parking spaces), Condition 41 (building heights), Condition 42 (non-residential floorspace) and Condition 43 (residential units) pursuant to planning permission dated 19/01/2019 ref 2017/5837 to allow: Changes to internal residential layouts resulting in an amended residential unit mix (including an increase of up to 59 residential units); minor adjustments to the massing, building footprint and height of Plots 3 and 7 (Phase 3) and associated changes to the external building façade of Plots 3, 7and 8 (Phase 3); reconfiguration of commercial floorspace; alterations to play space and landscape design, servicing arrangements, cycle parking and provision of plant.)

    Received 28 Apr, published by the council 29 Jul 2026 Conditions
  • 2026/1872 Granted

    Block 8 Burridge Gardens St John's Hill SW11 1UA

    Matters related to Schedule 10, Part 1.1 (Be Seen) for Block 8 pursuant to of section 106 agreement dated 03/11/2022 related to planning permission ref. 2021/5678 (Variation of Condition 15 (in accordance with approved drawings), Condition 24 (lifetime homes standards), Condition 25 (Code for Sustainable Homes Interim (Design Stage) Certificate), Condition 28 (Energy Performance Certificate), Condition 32 (secure cycle parking spaces), Condition 41 (building heights), Condition 42 (non residential floorspace) and Condition 43 (residential units) pursuant to planning permission dated 19/01/2019 ref 2017/5837 to allow: Changes to internal residential layouts resulting in an amended residential unit mix (including an increase of up to 59 residential units); minor adjustments to the massing, building footprint and height of Plots 3 and 7 (Phase 3) and associated changes to the external building fa??ade of Plots 3, 7and 8 (Phase 3); reconfiguration of commercial floorspace; alterations to play space and landscape design, servicing arrangements, cycle parking and provision of plant.).

    Received 18 May, published by the council 25 Jul 2026 Conditions