Planning application
Tideway Central FLO JV Tideway Central Cringle St SW11 8BX
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
This application is for a small brick substation built to support the tunnelling works at the Kirtling St Thames Tideway worksite. The site is to be handed back to Thames Water and they have expressed a wish for the substation to remain in place. The substation is located in the Brooks Court part of the Kirtling St site, and this is outside the Thames Tideway Development Consent Order (DCO) approved boundaries and consequently requires an additional Town and Country Planning Application to leave in place. The substation is a small brick built flat roof structure 4metres by 4metres approx.
As published by the council, reference 2025/0963
Application record
- Reference
- 2025/0963
- Type
- Application for Full Permission
- Status
- FINAL DECISION
- Decision
- Approve with Conditions
- Received
- 24 Mar 2025
- Validated
- 28 Mar 2025
- Ward
- Nine Elms
- Decision by
- Delegated Standard
- Postcode
- SW11 8BX
Timeline
Dates from the published record
-
24 Mar 2025
Received by Wandsworth
-
28 Mar 2025
Validated
Checked as complete and ready for consideration.
-
29 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Wandsworth granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Temporary building on Plot 1 of Battersea Power Station Phase 6 Cringle Street SW11 8BX
89% historically approved · decision due ~24 Aug
Installation of 6 no. internally illuminated signs to the north, south, east and west elevations of the temporary development on Plot 1 (within Phase 6 of the Battersea Power Station site, planning permission ref. 2023/4018, as amended), detailed as: 2 no. signs on the north elevation measuring 7.36m x 0.57m and 2.29m x 0.535m; 1 no. sign on the south elevation measuring 7.36m x 0.57m; 2 no. signs on the east elevation measuring 7.36m x 0.57m and 0.77m x 1.56m; and 1 no. sign on the west elevation measuring 7.36m x 0.57m.
Awaiting decision -
BPS Kirtling Street Phase 5A SW8 5BN
89% historically approved · decision due ~2 Nov
Submission of details pursuant to Condition 45 (archaeological investigation) for Phase 5A only of planning permission 2021/0414 dated 28/02/2022 for the Battersea Power Station masterplan.
Awaiting decision -
Battersea Power Station Phase 3b Kirtling Street SW8 5BN
89% historically approved · decision due ~21 Oct
Application under Section 96A of the Town and Country Planning Act 1990 for 'non-material' amendments to conditions 8 (floorspace restrictions), 10 (distribution of uses) and 11 (maximum floorspace per development zone) of planning permission 2020/0579 dated 05/09/2020. The amendments relate to the change of use of unit UG-14 within Phase 3B of the development from retail / professional and financial services (class A1/A2) to food and beverage (class A3/A4/A5).
Awaiting decision -
Battersea Power Station development site Phase 5A SW8 5BN
89% historically approved · decision due ~30 Oct
Submission of details pursuant to Condition 81 Part C (air quality assessment) for Phase 5A only of planning permission 2021/0414 dated 28/02/2022 for the Battersea Power Station masterplan.
Awaiting decision -
Battersea Power Station development site Phase 5A SW8 5BN
89% historically approved · decision due ~30 Oct
Submission of details pursuant to Condition 53 (drainage maintenance regime) for Phase 5A only of planning permission 2021/0414 dated 28/02/2022 for the Battersea Power Station masterplan.
Awaiting decision -
Battersea Power Station Kirtling Street London SW8 5BN
89% historically approved · decision due ~28 Jun
2022/1168 - Submission of landscape details pursuant to Condition 19 for Phase 3B only of planning permission 2020/0579 dated 25/09/2020 for "Application under Section 73 of the Town and Country Planning Act 1990 for variations to Conditions 7 (Parameter Plans), 8 (Floorspace Areas), 10 (Distribution of Use Classes), 11 (Maximum Floorspace Areas), 13 (No. of Residential Units) and 61 (Approved Drawings) of the outline planning permission dated 8th November 2016 (ref: 2016/1119) for: "the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bars and cafes, offices, hotel, residential, community and cultural space, assembly and leisure space, serviced apartments, an energy centre and basement plant; parking for cars, coaches, motorcycles and bicycles; new access and internal road system and servicing; 'off-site' highway works; works to the jetty and riverwall to facilitate river transport and fuel delivery; provision of open space and landscaping." 2020/0579 - Application under Section 73 of the Town and Country Planning Act 1990 for variations to Conditions 7 (Parameter Plans), 8 (Floorspace Areas), 10 (Distribution of Use Classes), 11 (Maximum Floorspace Areas), 13 (No. of Residential Units) and 61 (Approved Drawings) of the outline planning permission dated 8th November 2016 (ref: 2016/1119) for: "the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bar
Awaiting decision Reserved matters New dwelling Extension +1
Other full applications
In Wandsworth
-
2026/3090 Awaiting decision
73 Bickersteth Road SW17 9SH
Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations
-
2026/3095 Awaiting decision
Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY
Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.
-
2026/3094 Awaiting decision
64 Hillbury Road London Wandsworth SW17 8JT
Installation of four replacement windows
-
2026/3082 Awaiting decision
The Ship 41 Jews Row London Wandsworth SW18 1TB
Installation of new external AC condensers and relocation of existing external condenser
-
2026/3073 Awaiting decision
1 Gracedale Road SW16 6SW
Single storey rear extension to house a dining room. Alterations to the existing side stores to form part of the new kitchen. Works to include upgrading the fabric of the existing stores and providing a new roof and rooflights to the stores. Replacement windows to the side and rear of the existing house.