Planning application
101 Prince of Wales Drive SW8 4BL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details pursuant to the partial re-discharge of Condition 18 (Details and samples of materials) in respect of Phase 3 (Blocks A, B and F) of the development permitted under planning permission 2022/0727 dated 22/12/2022.
As published by the council, reference 2022/5147
Application record
- Reference
- 2022/5147
- Type
- Details (following full perm.)
- Status
- FINAL DECISION
- Decision
- Approve No Conditions
- Received
- 15 Dec 2022
- Validated
- 4 Jan 2023
- Decided
- 12 Apr 2023
- Ward
- Nine Elms
- Decision by
- Delegated Standard
- Postcode
- SW8 4BL
Timeline
Dates from the published record
-
15 Dec 2022
Received by Wandsworth
-
4 Jan 2023
Validated
Checked as complete and ready for consideration.
-
12 Apr 2023
Decision issued: Approve No Conditions
-
20 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Development Site Of 101 103 And Former Battersea Gas Holders Prince Of Wales Drive SW8 4FE
Details pursuant to the partial discharge of Condition 45 (Development Management Plan) in respect of Phase 2 of the development permitted under planning permission 2020/3867 dated 15/04/2021.
Granted Full applications 7 docs -
Development Site Of 101 103 And Former Battersea Gas Holders Prince Of Wales Drive SW8 4FE
Matters relating to a S106 Agreement pursuant to the Marketing and Letting Plans for Blocks K & L required under Schedule 3, Part 1, Clauses 5.3 and 5.4 of the S106 Agreement associated with planning permission ref: 2015/0591 dated 18/09/15.
Granted Conditions 4 docs -
Development Site Of 101 103 And Former Battersea Gas Holders Prince Of Wales Drive SW8 4BL
Alterations to the number and location of telecoms equipment on the roof of Block J approved under planning permission ref: 2018/5190, dated 21/12/18.
Granted Amendments 17 docs -
Development Site Of 101 103 And Former Battersea Gas Holders Prince Of Wales Drive London SW11 4FS
Details pursuant to the partial discharge of Condition 37 (Water consumption) in respect of Phase 2 of the development permitted under planning permission 2020/3867 dated 15/04/2021.
Granted Full applications 29 docs -
Development Site Of 101 103 And Former Battersea Gas Holders Prince Of Wales Drive SW8 4BL
Details pursuant to the partial discharge of Condition 31 (Verification Report) in relation to the landscaped areas at podium level between Block M and Block H of the development permitted under planning permission 2016/1517, dated 24/10/16.
Granted Full applications 5 docs -
101 Prince of Wales Drive SW8 4BL
Non-material amendment is sought under Section 96a of the Town and Country Planning Act 1990 for amendments to planning permission 2022/0727 dated 22/12/2022. Amendments comprise alterations to Phase 3 of the development in respect of the approved façade materials, fenestration and landscaping.
Granted Amendments Windows or glazing 33 docs
Other full applications applications
In Wandsworth
-
2026/3090 Awaiting decision
73 Bickersteth Road SW17 9SH
Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations
-
2026/3096 Awaiting decision
1 B Gorst Road London Wandsworth SW11 6JB
Replacement boundary walls/gates
-
2026/3087 Awaiting decision
30 Eversleigh Road SW11 5XA
Rebuilding rear return ground floor infill extension, 1st floor rear return extension and 2nd floor loft conversion with front rooflights and rear dormers.
-
2026/3095 Awaiting decision
Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY
Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.
-
2026/3094 Awaiting decision
64 Hillbury Road London Wandsworth SW17 8JT
Installation of four replacement windows