Skip to content
PlanIndex Get alerts
Menu

Planning application

Development Site Of 101 103 And Former Battersea Gas Holders Prince Of Wales Drive SW8 4BL

Granted Wandsworth 2019/5064 Details (following full perm.)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details pursuant to the partial discharge of Condition 31 (Verification Report) in relation to the landscaped areas at podium level between Block M and Block H of the development permitted under planning permission 2016/1517, dated 24/10/16.

As published by the council, reference 2019/5064

Application record

Reference
2019/5064
Type
Details (following full perm.)
Status
FINAL DECISION
Decision
Approve No Conditions
Received
21 Nov 2019
Validated
2 Dec 2019
Decided
2 Dec 2019
Ward
Queenstown - Historic
Decision by
Delegated Standard
Postcode
SW8 4BL

Timeline

Dates from the published record

  1. 21 Nov 2019

    Received by Wandsworth

  2. 2 Dec 2019

    Validated

    Checked as complete and ready for consideration.

  3. 2 Dec 2019

    Decision issued: Approve No Conditions

  4. 20 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Wandsworth

  • 2026/3090 Awaiting decision

    73 Bickersteth Road SW17 9SH

    Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations

    27 Aug 2026 Full applications
  • 2026/3096 Awaiting decision

    1 B Gorst Road London Wandsworth SW11 6JB

    Replacement boundary walls/gates

    27 Aug 2026 Full applications
  • 2026/3087 Awaiting decision

    30 Eversleigh Road SW11 5XA

    Rebuilding rear return ground floor infill extension, 1st floor rear return extension and 2nd floor loft conversion with front rooflights and rear dormers.

    27 Aug 2026 Full applications
  • 2026/3095 Awaiting decision

    Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY

    Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.

    27 Aug 2026 Full applications
  • 2026/3094 Awaiting decision

    64 Hillbury Road London Wandsworth SW17 8JT

    Installation of four replacement windows

    27 Aug 2026 Full applications