Planning application
Battersea Power Station Site Kirtling Street
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Display of wall mounted menu boxes.
As published by the council, reference 2021/4071
Application record
- Reference
- 2021/4071
- Type
- Advertisements
- Status
- Withdrawn As published: INVALID
- Decision
- Withdrawn
- Received
- 2 Sep 2021
- Validated
- 2 Sep 2021
- Ward
- VNEB
Timeline
Dates from the published record
-
2 Sep 2021
Received by Wandsworth
-
20 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat withdrawal means
The applicant withdrew this application before Wandsworth decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About advertisement consent applications
Advertisement consent is judged on two things only: amenity and public safety, not competition or other planning considerations. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Battersea Power Station Site Kirtling Street SW8 5BP
100% historically approved · decision due ~14 Dec
Matters relating to a S106 Agreement pursuant to the Internal Roads Plan in relation to Schedule 14, Paragraph 2.1 of the Section 106 agreement (dated 25th September 2020) for Phases 1, 2 and 3A only within the Battersea Power Station development.
Awaiting decision Conditions 21 docs -
Battersea Power Station Phase 3B and 3PP Kirtling Street SW8 5BN
Details of ecological mitigation measures pursuant to condition 44 of planning permission 2020/0579 dated 25 September 2020 for Phase 3B and Phase 3PP of the Battersea Power Station development.
Granted Full applications 9 docs -
Battersea Power Station Phase 3A, Kirtling Street SW8
Details of ecological mitigation measures pursuant to condition 44 of planning permission 2014/2837 dated 5 December 2014 for Phase 3A of the Battersea Power Station development.
Granted Full applications 9 docs -
Battersea Power Station Phase 3B SW8 5BN
Details of the interface between Phase 3B and the NLE pursuant to condition 66 of planning permission dated 25/09/2020 ref 2020/0579 (Application under Section 73 of the Town and Country Planning Act 1990 for variations to Conditions 7 (Parameter Plans), 8 (Floorspace Areas), 10 (Distribution of Use Classes), 11 (Maximum Floorspace Areas), 13 (No. of Residential Units) and 61 (Approved Drawings) of the outline planning permission dated 8th November 2016 (ref: 2016/1119) for: "the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bars and cafes, offices, hotel, residential, community and cultural space, assembly and leisure space, serviced apartments, an energy centre and basement plant; parking for cars, coaches, motorcycles and bicycles; new access and internal road system and servicing; 'off-site' highway works; works to the jetty and riverwall to facilitate river transport and fuel delivery; provision of open space and landscaping." )
Granted Full applications New dwelling Extension +1 52 docs -
Battersea Power Station development site, London, SW8 5BN
Matters relating to a Section 106 agreement dated 28/02/2022 pursuant to Schedule 20, C2.1 (Public Realm Phasing Plan) associated with Phase 3B of the Battersea Power Station Development.
Granted Conditions 5 docs -
Battersea Power Station Phase 3b Kirtling Street SW8 5BN
Application under Section 96a of the Town and Country Planning Act 1990 (as amended) for non-material amendments to planning permission 2020/0579 dated 25/09/2020 ("Application under Section 73 of the Town and Country Planning Act 1990 for variations to Conditions 7 (Parameter Plans), 8 (Floorspace Areas), 10 (Distribution of Use Classes), 11 (Maximum Floorspace Areas), 13 (No. of Residential Units) and 61 (Approved Drawings) of the outline planning permission dated 8th November 2016 (ref: 2016/1119) for: "the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bars and cafes, offices, hotel, residential, community and cultural space, assembly and leisure space, serviced apartments, an energy centre and basement plant; parking for cars, coaches, motorcycles and bicycles; new access and internal road system and servicing; 'off-site' highway works; works to the jetty and riverwall to facilitate river transport and fuel delivery; provision of open space and landscaping."). The amendments seek to include all approved drawings in relation to phase 1, phase 2 and phase 3A of the Battersea Power Station development on the decision notice dated 25/09/2020.
Granted Amendments New dwelling Extension +1 5 docs
Other advertisement consent applications
In Wandsworth
-
2026/3255 Awaiting decision
Development Site Of Market Tower 1 Nine Elms Lane London Wandsworth SW8 5NQ
Please see Application Documents and Application Drawings, prepared by Endpoint.
-
2026/1403 Granted
38-44 St Johns Road SW11 1PW
Display of internally illuminated wall mounted lettering sign and projecting sign and window mounted vinyl signage.
-
2025/4411 Granted
Ground Floor 36 Trinity Road SW17 7RE
Display of 2 x non illuminated fascia signs, and 1 x vinyl graphic to glazing.
-
2026/3190 Awaiting decision
Corner of Battersea Park Road and Pump House Lane Battersea Power Station SW8 5BP
Temporary, non-illuminated static advertisement panel measuring 14m wide x 5.5 height x 0.5 depth mounted to the outward-facing elevation of temporary site accommodation located at the corner of Battersea Park Road and Pump House Lane.
-
2026/0037 Granted
82 Wandsworth High Street SW18 4LB
Installation of external lighting to illuminate existing hand-painted mural on the flank wall.