Planning application
Battersea Power Station Phase 3A, Kirtling Street SW8
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details of ecological mitigation measures pursuant to condition 44 of planning permission 2014/2837 dated 5 December 2014 for Phase 3A of the Battersea Power Station development.
As published by the council, reference 2021/4028
Application record
- Reference
- 2021/4028
- Type
- Details (following full perm.)
- Status
- FINAL DECISION
- Decision
- Approve No Conditions
- Received
- 31 Aug 2021
- Validated
- 5 Jul 2022
- Decided
- 4 May 2023
- Ward
- Nine Elms
- Decision by
- Delegated Standard
- Postcode
- SW11 8EZ
Timeline
Dates from the published record
-
31 Aug 2021
Received by Wandsworth
-
5 Jul 2022
Validated
Checked as complete and ready for consideration.
-
4 May 2023
Decision issued: Approve No Conditions
-
20 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Wandsworth granted permission on 4 May 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Battersea Power Station Site Kirtling Street
Display of wall mounted menu boxes.
Withdrawn Advertising -
Battersea Power Station Phase 3B and 3PP Kirtling Street SW8 5BN
Details of ecological mitigation measures pursuant to condition 44 of planning permission 2020/0579 dated 25 September 2020 for Phase 3B and Phase 3PP of the Battersea Power Station development.
Granted Full applications 9 docs -
Battersea Power Station Phase 3B SW8 5BN
Details of the interface between Phase 3B and the NLE pursuant to condition 66 of planning permission dated 25/09/2020 ref 2020/0579 (Application under Section 73 of the Town and Country Planning Act 1990 for variations to Conditions 7 (Parameter Plans), 8 (Floorspace Areas), 10 (Distribution of Use Classes), 11 (Maximum Floorspace Areas), 13 (No. of Residential Units) and 61 (Approved Drawings) of the outline planning permission dated 8th November 2016 (ref: 2016/1119) for: "the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bars and cafes, offices, hotel, residential, community and cultural space, assembly and leisure space, serviced apartments, an energy centre and basement plant; parking for cars, coaches, motorcycles and bicycles; new access and internal road system and servicing; 'off-site' highway works; works to the jetty and riverwall to facilitate river transport and fuel delivery; provision of open space and landscaping." )
Granted Full applications New dwelling Extension +1 52 docs -
Battersea Power Station development site, London, SW8 5BN
Matters relating to a Section 106 agreement dated 28/02/2022 pursuant to Schedule 20, C2.1 (Public Realm Phasing Plan) associated with Phase 3B of the Battersea Power Station Development.
Granted Conditions 5 docs -
Battersea Power Station (Phase 2) Kirtling Street SW8 5BN
Submission of details pursuant to the partial discharge of Condition 62 (Cultural Strategy) for Phase 2 of Planning Permission Ref: 2013/6639 dated 29/04/2014 for "Amendments to the outline planning permission dated 6th December 2013 (ref: 2013/2742) for the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bars and cafes, offices, hotel, residential, community and cultural space, assembly and leisure space, student housing, serviced apartments, an energy centre and basement plant; parking for cars, coaches, motorcycles and bicycles; new access and internal road system and servicing; 'off-site' highway works; works to the jetty to facilitate river transport and fuel delivery, including alterations to the river wall; provision of open space and landscaping works. (The application relates primarily to the Power Station building, and the amendments include changes to the land uses including an increase in the retail floorspace; an increase in the number of residential units; external alterations to the Power Station building; internal alterations to the layout; and a revised Energy Strategy)".
Granted Full applications New dwelling Extension +1 6 docs -
Battersea Power Station Kirtling Street SW8 5BN
Submission of details for partial discharge of Condition 62 (Cultural Strategy) for Phase 3a only pursuant of planning permission 2014/2837 dated 05/12/2014 for the "Amendments to the planning permission dated the 29/04/14 (ref: 2013/6639) for the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bars and cafes, offices, hotel, residential, community and cultural space, assembly and leisure space, student housing, serviced apartments, an energy centre and basement plant; parking for cars, coaches, motorcycles and bicycles; new access and internal road system and servicing; 'off-site' highway works; works to the jetty and riverwall to facilitate river transport and fuel delivery; provision of open space and landscaping."
Granted Full applications New dwelling Extension +1 6 docs
Other full applications
In Wandsworth
-
2026/3090 Awaiting decision
73 Bickersteth Road SW17 9SH
Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations
-
2026/3095 Awaiting decision
Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY
Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.
-
2026/3094 Awaiting decision
64 Hillbury Road London Wandsworth SW17 8JT
Installation of four replacement windows
-
2026/3082 Awaiting decision
The Ship 41 Jews Row London Wandsworth SW18 1TB
Installation of new external AC condensers and relocation of existing external condenser
-
2026/3073 Awaiting decision
1 Gracedale Road SW16 6SW
Single storey rear extension to house a dining room. Alterations to the existing side stores to form part of the new kitchen. Works to include upgrading the fabric of the existing stores and providing a new roof and rooflights to the stores. Replacement windows to the side and rear of the existing house.