Planning application

Battersea Power Station, Phase 4A Development

Granted Wandsworth 2021/3614 Matters relating to a S106 Agreement

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Matters relating to S106 in respect of planning permission 2016/3778 dated 21st November 2016, S106 Schedule 4 para. 2.1 Table 1 (Mix Housing Types)

As published by the council, reference 2021/3614

Application record

Reference
2021/3614
Type
Matters relating to a S106 Agreement
Status
Granted As published: FINAL DECISION
Decision
Granted As published: Approve No Conditions
Received
30 Jul 2021
Validated
2 Aug 2021
Decided
21 Sep 2021
Ward
Queenstown - Historic
Decision by
Delegated Standard

Timeline

Dates from the published record

  1. 30 Jul 2021

    Received by Wandsworth

  2. 2 Aug 2021

    Validated

    Checked as complete and ready for consideration.

  3. 21 Sep 2021

    Decision issued: Approve No Conditions

  4. 21 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Wandsworth granted permission on 21 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Battersea Power Station Phase 3B SW8 5BN

    2021/2878 Submitted 17 Jun 2021 50 yards away

    Details of the interface between Phase 3B and the NLE pursuant to condition 66 of planning permission dated 25/09/2020 ref 2020/0579 (Application under Section 73 of the Town and Country Planning Act 1990 for variations to Conditions 7 (Parameter Plans), 8 (Floorspace Areas), 10 (Distribution of Use Classes), 11 (Maximum Floorspace Areas), 13 (No. of Residential Units) and 61 (Approved Drawings) of the outline planning permission dated 8th November 2016 (ref: 2016/1119) for: "the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bars and cafes, offices, hotel, residential, community and cultural space, assembly and leisure space, serviced apartments, an energy centre and basement plant; parking for cars, coaches, motorcycles and bicycles; new access and internal road system and servicing; 'off-site' highway works; works to the jetty and riverwall to facilitate river transport and fuel delivery; provision of open space and landscaping." )

    Granted Full applications New dwelling Extension +1 52 docs
  • Battersea Power Station development site, London, SW8 5BN

    2023/0891 Submitted 7 Mar 2023 50 yards away

    Matters relating to a Section 106 agreement dated 28/02/2022 pursuant to Schedule 20, C2.1 (Public Realm Phasing Plan) associated with Phase 3B of the Battersea Power Station Development.

    Granted Conditions 5 docs
  • Battersea Power Station Phase 3b Kirtling Street SW8 5BN

    2020/4368 Submitted 16 Nov 2020 50 yards away

    Application under Section 96a of the Town and Country Planning Act 1990 (as amended) for non-material amendments to planning permission 2020/0579 dated 25/09/2020 ("Application under Section 73 of the Town and Country Planning Act 1990 for variations to Conditions 7 (Parameter Plans), 8 (Floorspace Areas), 10 (Distribution of Use Classes), 11 (Maximum Floorspace Areas), 13 (No. of Residential Units) and 61 (Approved Drawings) of the outline planning permission dated 8th November 2016 (ref: 2016/1119) for: "the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bars and cafes, offices, hotel, residential, community and cultural space, assembly and leisure space, serviced apartments, an energy centre and basement plant; parking for cars, coaches, motorcycles and bicycles; new access and internal road system and servicing; 'off-site' highway works; works to the jetty and riverwall to facilitate river transport and fuel delivery; provision of open space and landscaping."). The amendments seek to include all approved drawings in relation to phase 1, phase 2 and phase 3A of the Battersea Power Station development on the decision notice dated 25/09/2020.

    Granted Amendments New dwelling Extension +1 5 docs
  • Battersea Power Station (Phase 2) Kirtling Street SW8 5BN

    2019/4757 Submitted 1 Nov 2019 50 yards away

    Submission of details pursuant to the partial discharge of Condition 62 (Cultural Strategy) for Phase 2 of Planning Permission Ref: 2013/6639 dated 29/04/2014 for "Amendments to the outline planning permission dated 6th December 2013 (ref: 2013/2742) for the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bars and cafes, offices, hotel, residential, community and cultural space, assembly and leisure space, student housing, serviced apartments, an energy centre and basement plant; parking for cars, coaches, motorcycles and bicycles; new access and internal road system and servicing; 'off-site' highway works; works to the jetty to facilitate river transport and fuel delivery, including alterations to the river wall; provision of open space and landscaping works. (The application relates primarily to the Power Station building, and the amendments include changes to the land uses including an increase in the retail floorspace; an increase in the number of residential units; external alterations to the Power Station building; internal alterations to the layout; and a revised Energy Strategy)".

    Granted Full applications New dwelling Extension +1 6 docs
  • Battersea Power Station Kirtling Street SW8 5BN

    2019/4758 Submitted 1 Nov 2019 50 yards away

    Submission of details for partial discharge of Condition 62 (Cultural Strategy) for Phase 3a only pursuant of planning permission 2014/2837 dated 05/12/2014 for the "Amendments to the planning permission dated the 29/04/14 (ref: 2013/6639) for the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bars and cafes, offices, hotel, residential, community and cultural space, assembly and leisure space, student housing, serviced apartments, an energy centre and basement plant; parking for cars, coaches, motorcycles and bicycles; new access and internal road system and servicing; 'off-site' highway works; works to the jetty and riverwall to facilitate river transport and fuel delivery; provision of open space and landscaping."

    Granted Full applications New dwelling Extension +1 6 docs
  • Battersea Power Station and nearby land including the former South Lambeth Goods Yard, Kirtling Street, SW8; 28, 88 and 188 Kirtling Street, SW8 5BP; 2 Battersea Park Road, SW8; and parts of Battersea Park Road, Cringle Street, Kirtling Street, Queenstown Road and Queens Circus, SW8

    2023/0914 Submitted 8 Mar 2023 50 yards away

    For Wandsworth Borough Council (Council) to enter into two agreements (the Phase 6 Section 106 Agreement and the Phase 7 Section 106 Agreement) with Battersea Project Land Company Ltd and Battersea Project Phase 6 Company Limited in respect of the Phase 6 Section 106 Agreement and Battersea Project Land Company Limited and Thames Water Utilities Limited in respect of the phase 7 Section 106 agreement under Section 106 under the Town and Country Planning Act 1990, Section 16 of the Greater London Council (General Powers) Act 1974, Section 111 of the Local Government Act 1972 and Section 1 of the Localism Act 2011. The agreements would secure sums equal to the costs to carry out and complete works to construct the remainder of the Riverside Path and the Pedestrian and Cycle Routes as set out in the Eleventh Deed of Variation of the BPS S106 Agreement (the Section 106 Agreement). On completion of the agreements, the Existing Bond dated 22 April 2016 and secured in the S106 Agreement would be extinguished and could no longer be enforced by the Council.

    Granted Conditions 12 docs

In Wandsworth

  • 2026/0930 Granted

    New Covent Garden Market, Nine Elms Lane SW8

    Matters relating to Schedule 3, Part 1, Paragraph 5 of the S106 Agreement dated 11/02/15 associated with planning permission 2014/2810 (Planning application for part outline and part detail planning permission for:(a) demolition of existing wholesale Fruit and Vegetable and Flower Market and ancillary buildings and structures, and residential building on Nine Elms Lane (apart from the existing multi storey car park);(b) Construction of mixed-use redevelopment comprising: a new Fruit and Vegetable Market and Flower Market and ancillary uses, including temporary and permanent façade; refurbishment and extension of existing waste collection area (including rooftop sports pitches); residential dwellings; flexible commercial uses, including retail, financial and professional services, café/restaurant, bar uses and hot food takeaways and offices; non-residential institutions; assembly and leisure uses; temporary storage and distribution buildings and associated works; associated car, cycle and motorcycle parking and servicing and new vehicle accesses, energy centres; and landscaping public realm and open space including part of the Linear Park. All matters reserved apart from access, details of all new markets and supporting buildings, and details of Building N8 and associated landscaping);(c) Site clearance and enabling works. An Environmental Statement has been submitted with the application under The Town and Country Planning (Environmental Impact Assessment) Regulations 2011.

    Received 6 Mar, published by the council 29 Jul 2026 Conditions
  • 2025/1644 Granted

    Market Towers, 1 Nine Elms Lane, SW8

    Matters relating to a S106 Agreement in respect of the written evidence of the transfer or lease of the Affordable Housing Units required under Schedule 3, Part 1, Paragraphs 4 (b), 5 (b), and 6 (b) of the S106 Agreement associated with planning permission ref: 2022/1343 dated 19/07/23 (Deed of Variation to the S106 Legal Agreement of the planning permission 2014/0871 (as amended) dated 26th August 2014 for minor-material amendments, under Section 73 of the Town and Country Planning Act, to planning permission 2012/0380 "Demolition of existing buildings and structures. Erection of two new buildings of 58 storeys (up to 200m above ground) and 43 storeys (up to 161m above ground) high to provide up to 494 residential units, retail uses (classes A1-A4); a hotel (class C1) together with a high level viewing space; provision of private and public open spaces; vehicular access and reconfigured vehicular access routes; provision of cycle, motorcycle and car parking, servicing and energy centre within the two level basement; landscaping; excavation works; and other associated works".).

    Received 8 May, published by the council 29 Jul 2026 Conditions
  • 2026/0289 Granted

    South London Mail Centre 53 Nine Elms Lane SW8 5BB

    Matters relating to a S106 Agreement pursuant to the Affordable Workspace Management Plan required under Schedule 3, Part 7, Paragraph 1.2 of the S106 Agreement dated 22nd October 2021 associated with planning permission 2020/5054 (Erection of an eleven-storey building with rooftop terrace and basement comprising predominantly office (Class E) floorspace at ground and upper levels and flexible commercial/community (Class E) floorspace at ground level together with landscaping and other associated works).

    Received 21 Jan, published by the council 29 Jul 2026 Conditions
  • 2025/1529 Granted

    Phase 3 Peabody Estate (Block 3D), St Johns Hill SW11 1UA

    Matters relating to S106 Schedule 10, Part 1.1, Be Seen energy performance indicators to Block 3D pursuant to planning permission dated 03/11/2022 ref 2021/5678 (Variation of Condition 15 (in accordance with approved drawings), Condition 24 (lifetime homes standards), Condition 25 (Code for Sustainable Homes Interim (Design Stage) Certificate), Condition 28 (Energy Performance Certificate), Condition 32 (secure cycle parking spaces), Condition 41 (building heights), Condition 42 (non-residential floorspace) and Condition 43 (residential units) pursuant to planning permission dated 19/01/2019 ref 2017/5837 to allow: Changes to internal residential layouts resulting in an amended residential unit mix (including an increase of up to 59 residential units); minor adjustments to the massing, building footprint and height of Plots 3 and 7 (Phase 3) and associated changes to the external building façade of Plots 3, 7and 8 (Phase 3); reconfiguration of commercial floorspace; alterations to play space and landscape design, servicing arrangements, cycle parking and provision of plant.)

    Received 28 Apr, published by the council 29 Jul 2026 Conditions
  • 2025/2015 Granted

    27-33 Parkgate Road and 2-42 Elcho Street SW11 4NP

    Matters relating to Schedule 11, Part 3 (Employment and Skills Plan) of Section 106 Agreement planning permission dated 30/06/2015 ref 2014/3837 (Demolition of existing buildings and redevelopment of the site to provide new buildings ranging from 3 to 10 storeys in height comprising 118 residential units including affordable housing (Use Class C3), and 2,282m2 of flexible commercial floorspace (Use Classes A1-A4/B1/D1/D2), together with associated car parking, open space, landscaping and infrastructure works.).

    Received 30 May, published by the council 29 Jul 2026 Conditions