Skip to content
PlanIndex Get alerts
Menu

Planning application

Battersea Power Station (Phase 2) Kirtling Street SW8 5BN

Granted Wandsworth 2019/4757 Details (following full perm.)

Works: New dwelling Extension Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Submission of details pursuant to the partial discharge of Condition 62 (Cultural Strategy) for Phase 2 of Planning Permission Ref: 2013/6639 dated 29/04/2014 for "Amendments to the outline planning permission dated 6th December 2013 (ref: 2013/2742) for the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bars and cafes, offices, hotel, residential, community and cultural space, assembly and leisure space, student housing, serviced apartments, an energy centre and basement plant; parking for cars, coaches, motorcycles and bicycles; new access and internal road system and servicing; 'off-site' highway works; works to the jetty to facilitate river transport and fuel delivery, including alterations to the river wall; provision of open space and landscaping works. (The application relates primarily to the Power Station building, and the amendments include changes to the land uses including an increase in the retail floorspace; an increase in the number of residential units; external alterations to the Power Station building; internal alterations to the layout; and a revised Energy Strategy)".

As published by the council, reference 2019/4757

Application record

Reference
2019/4757
Type
Details (following full perm.)
Status
FINAL DECISION
Decision
Approve No Conditions
Received
1 Nov 2019
Validated
8 Nov 2019
Decided
29 Nov 2019
Ward
Queenstown - Historic
Decision by
Delegated Standard
Postcode
SW8 5BN

Timeline

Dates from the published record

  1. 1 Nov 2019

    Received by Wandsworth

  2. 8 Nov 2019

    Validated

    Checked as complete and ready for consideration.

  3. 29 Nov 2019

    Decision issued: Approve No Conditions

  4. 20 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Wandsworth granted permission on 29 November 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Battersea Power Station Phase 3B SW8 5BN

    2021/2878 Submitted 17 Jun 2021 0m away

    Details of the interface between Phase 3B and the NLE pursuant to condition 66 of planning permission dated 25/09/2020 ref 2020/0579 (Application under Section 73 of the Town and Country Planning Act 1990 for variations to Conditions 7 (Parameter Plans), 8 (Floorspace Areas), 10 (Distribution of Use Classes), 11 (Maximum Floorspace Areas), 13 (No. of Residential Units) and 61 (Approved Drawings) of the outline planning permission dated 8th November 2016 (ref: 2016/1119) for: "the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bars and cafes, offices, hotel, residential, community and cultural space, assembly and leisure space, serviced apartments, an energy centre and basement plant; parking for cars, coaches, motorcycles and bicycles; new access and internal road system and servicing; 'off-site' highway works; works to the jetty and riverwall to facilitate river transport and fuel delivery; provision of open space and landscaping." )

    Granted Full applications New dwelling Extension +1 52 docs
  • Battersea Power Station development site, London, SW8 5BN

    2023/0891 Submitted 7 Mar 2023 0m away

    Matters relating to a Section 106 agreement dated 28/02/2022 pursuant to Schedule 20, C2.1 (Public Realm Phasing Plan) associated with Phase 3B of the Battersea Power Station Development.

    Granted Conditions 5 docs
  • Battersea Power Station Kirtling Street SW8 5BN

    2019/4758 Submitted 1 Nov 2019 0m away

    Submission of details for partial discharge of Condition 62 (Cultural Strategy) for Phase 3a only pursuant of planning permission 2014/2837 dated 05/12/2014 for the "Amendments to the planning permission dated the 29/04/14 (ref: 2013/6639) for the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bars and cafes, offices, hotel, residential, community and cultural space, assembly and leisure space, student housing, serviced apartments, an energy centre and basement plant; parking for cars, coaches, motorcycles and bicycles; new access and internal road system and servicing; 'off-site' highway works; works to the jetty and riverwall to facilitate river transport and fuel delivery; provision of open space and landscaping."

    Granted Full applications New dwelling Extension +1 6 docs
  • Battersea Power Station and nearby land including the former South Lambeth Goods Yard, Kirtling Street, SW8; 28, 88 and 188 Kirtling Street, SW8 5BP; 2 Battersea Park Road, SW8; and parts of Battersea Park Road, Cringle Street, Kirtling Street, Queenstown Road and Queens Circus, SW8

    2023/0914 Submitted 8 Mar 2023 0m away

    For Wandsworth Borough Council (Council) to enter into two agreements (the Phase 6 Section 106 Agreement and the Phase 7 Section 106 Agreement) with Battersea Project Land Company Ltd and Battersea Project Phase 6 Company Limited in respect of the Phase 6 Section 106 Agreement and Battersea Project Land Company Limited and Thames Water Utilities Limited in respect of the phase 7 Section 106 agreement under Section 106 under the Town and Country Planning Act 1990, Section 16 of the Greater London Council (General Powers) Act 1974, Section 111 of the Local Government Act 1972 and Section 1 of the Localism Act 2011. The agreements would secure sums equal to the costs to carry out and complete works to construct the remainder of the Riverside Path and the Pedestrian and Cycle Routes as set out in the Eleventh Deed of Variation of the BPS S106 Agreement (the Section 106 Agreement). On completion of the agreements, the Existing Bond dated 22 April 2016 and secured in the S106 Agreement would be extinguished and could no longer be enforced by the Council.

    Granted Conditions 12 docs
  • Kirtling Street Battersea Power Station SW8 5BN

    2019/4393 Submitted 10 Oct 2019 0m away

    Application under Section 96a of the Town and Country Planning Act 1990 for non-material amendments to planning permission 2016/1119, dated 08/11/2016 for the restoration and redevelopment of Battersea Power Station and surrounding land to provide retail, restaurants, bars, cafes, offices, hotel, residential, community and cultural space, and assembly and leisure space; an energy centre; basement plant, and car and cycle parking; new access and internal road system and servicing; 'off-site' highway works; works to the jetty and riverwall to facilitate river transport; and provision of open space and landscaping. (The amendments seek to reword condition 63 to extend the time period within which reserved matters can be submitted for Phases 4 to 7 of the approved development.)

    Granted Amendments 5 docs
  • Battersea Power Station Site Kirtling Street

    2021/4071 Submitted 2 Sep 2021 13m away

    Display of wall mounted menu boxes.

    Withdrawn Advertising

In Wandsworth

  • 2026/3090 Awaiting decision

    73 Bickersteth Road SW17 9SH

    Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations

    27 Aug 2026 Full applications
  • 2026/3095 Awaiting decision

    Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY

    Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.

    27 Aug 2026 Full applications
  • 2026/3094 Awaiting decision

    64 Hillbury Road London Wandsworth SW17 8JT

    Installation of four replacement windows

    27 Aug 2026 Full applications
  • 2026/3082 Awaiting decision

    The Ship 41 Jews Row London Wandsworth SW18 1TB

    Installation of new external AC condensers and relocation of existing external condenser

    27 Aug 2026 Full applications
  • 2026/3073 Awaiting decision

    1 Gracedale Road SW16 6SW

    Single storey rear extension to house a dining room. Alterations to the existing side stores to form part of the new kitchen. Works to include upgrading the fabric of the existing stores and providing a new roof and rooflights to the stores. Replacement windows to the side and rear of the existing house.

    26 Aug 2026 Full applications