Skip to content
PlanIndex Get alerts
Menu

Planning application

40 - 42 Ponton Road SW11 7BA

Withdrawn Wandsworth 2020/0459 Matters relating to a S106 Agreement

Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.

Proposal

Matters relating to a Section 106 Agreement pursuant to the Green Travel Modes Contribution required under Schedule 4, Part 1, Clause 2.1 associated with planning permission 2014/0614 dated 30/10/14.

As published by the council, reference 2020/0459

Application record

Reference
2020/0459
Type
Matters relating to a S106 Agreement
Status
WITHDRAWN
Decision
Withdrawn
Received
5 Feb 2020
Validated
11 Feb 2020
Ward
Queenstown - Historic
Decision by
Withdrawn-Council
Postcode
SW11 7BA

Site history

Applications at this address on the Wandsworth register

This site has had 2 applications since 2020: 1 approved, 0 refused.

  • 2020/0458 Granted

    40 - 42 Ponton Road SW11 7BA

    Matters relating to a Section 106 Agreement pursuant to the Notice of Practical Completion required under Clause 12.2.2 associated with planning permission 2014/0614 dated 30/10/14.

    Decided 2 Sep 2022 Conditions

Timeline

Dates from the published record

  1. 5 Feb 2020

    Received by Wandsworth

  2. 11 Feb 2020

    Validated

    Checked as complete and ready for consideration.

  3. 10 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What withdrawal means

The applicant withdrew this application before Wandsworth decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 40 - 42 Ponton Road SW11 7BA

    2020/0458 Submitted 5 Feb 2020 0m away

    Matters relating to a Section 106 Agreement pursuant to the Notice of Practical Completion required under Clause 12.2.2 associated with planning permission 2014/0614 dated 30/10/14.

    Granted Conditions 3 docs
  • 5 Linear Place (Unit GNR01 Plot G) SW11 7BA

    2026/1431 Submitted 8 Jun 2026 2m away

    Display of 2no. advertisements on 1no. windows (2.09m in height by 2.19m in width) and 1no. doors (1.6m in width by 2.17m in height) to the front elevation of the ground floor unit of Block G for a temporary period until 31 of May 2027.

    Granted Windows or glazing
  • Unit B, Plot D, 55 Nine Elms Lane

    2026/1009 Submitted 12 Mar 2026 85m away

    Submission of details purusant to the discharge of Condition

    Withdrawn Full applications
  • Unit E.NR03, Plot E, South London Mail Centre 53 Nine Elms Lane SW8 5BB

    2026/2570 Submitted 2 Sep 2026 85m away

    89% historically approved · decision due ~28 Oct

    Submission of details pursuant to the discharge of Conditions 4 (noise insulation measures), 5 (external ventilation equipment) and 6 (servicing and delivery plan) of planning permission 2024/0913 dated 10/03/2025 (Use of part of the ground and lower ground floors of Plot E for Class E purposes)

    Awaiting decision
  • South London Mail Centre 53 Nine Elms Lane SW8 5BB

    2026/2887 Submitted 25 Aug 2026 85m away

    89% historically approved · decision due ~20 Oct

    Submission of details pursuant to the partial discharge of Condition 39 (Low Emissions Strategy) of planning permission 2019/2250 dated 18/12/2020 in respect of Blocks B1, B2 and D3.

    Awaiting decision
  • South London Mail Centre 53 Nine Elms Lane SW8 5BB

    2026/1560 Submitted 24 Jun 2026 85m away

    89% historically approved · decision due ~19 Aug

    Matters relating to a S106 Agreement in respect of the assessment of the carbon dioxide emissions of the completed Development for Plots E and F required under Schedule Three, Part Three, Paragraph 8.2 of the S106 Agreement dated 25/10/21 associated with planning permission 2021/0654.

    Awaiting decision

In Wandsworth

  • 2026/0289 Granted

    South London Mail Centre 53 Nine Elms Lane SW8 5BB

    Matters relating to a S106 Agreement pursuant to the Affordable Workspace Management Plan required under Schedule 3, Part 7, Paragraph 1.2 of the S106 Agreement dated 22nd October 2021 associated with planning permission 2020/5054 (Erection of an eleven-storey building with rooftop terrace and basement comprising predominantly office (Class E) floorspace at ground and upper levels and flexible commercial/community (Class E) floorspace at ground level together with landscaping and other associated works).

    21 Jan 2026 Conditions
  • 2025/1529 Granted

    Phase 3 Peabody Estate (Block 3D), St Johns Hill SW11 1UA

    Matters relating to S106 Schedule 10, Part 1.1, Be Seen energy performance indicators to Block 3D pursuant to planning permission dated 03/11/2022 ref 2021/5678 (Variation of Condition 15 (in accordance with approved drawings), Condition 24 (lifetime homes standards), Condition 25 (Code for Sustainable Homes Interim (Design Stage) Certificate), Condition 28 (Energy Performance Certificate), Condition 32 (secure cycle parking spaces), Condition 41 (building heights), Condition 42 (non-residential floorspace) and Condition 43 (residential units) pursuant to planning permission dated 19/01/2019 ref 2017/5837 to allow: Changes to internal residential layouts resulting in an amended residential unit mix (including an increase of up to 59 residential units); minor adjustments to the massing, building footprint and height of Plots 3 and 7 (Phase 3) and associated changes to the external building façade of Plots 3, 7and 8 (Phase 3); reconfiguration of commercial floorspace; alterations to play space and landscape design, servicing arrangements, cycle parking and provision of plant.)

    28 Apr 2025 Conditions
  • 2025/2015 Granted

    27-33 Parkgate Road and 2-42 Elcho Street SW11 4NP

    Matters relating to Schedule 11, Part 3 (Employment and Skills Plan) of Section 106 Agreement planning permission dated 30/06/2015 ref 2014/3837 (Demolition of existing buildings and redevelopment of the site to provide new buildings ranging from 3 to 10 storeys in height comprising 118 residential units including affordable housing (Use Class C3), and 2,282m2 of flexible commercial floorspace (Use Classes A1-A4/B1/D1/D2), together with associated car parking, open space, landscaping and infrastructure works.).

    30 May 2025 Conditions
  • 2025/2927 Granted

    2 Otterburn Street (formerly 232 Mitcham Road) SW17

    Variation of Section 106 Agreement dated 29 November 2013 of planning permission ref. 2013/2419 to delete Paragraph 3.3. of Schedule 3 (Affordable Housing) and add a conditional Mortgage Exclusion Clause.

    13 Aug 2025 Conditions
  • 2025/1661 Granted

    Burridge Gardens St John's Hill SW11 1UA

    Submission of details pursuant to Schedule 3 Part 1, Clause 1.4.3 (Affordable Housing - Marketing Plan) of section 106 agreement dated 03/11/2022 related to planning permission ref 2021/5678 (Variation of Condition 15 (in accordance with approved drawings), Condition 24 (lifetime homes standards), Condition 25 (Code for Sustainable Homes Interim (Design Stage) Certificate), Condition 28 (Energy Performance Certificate), Condition 32 (secure cycle parking spaces), Condition 41 (building heights), Condition 42 (non-residential floorspace) and Condition 43 (residential units) pursuant to planning permission dated 19/01/2019 ref 2017/5837 to allow: Changes to internal residential layouts resulting in an amended residential unit mix (including an increase of up to 59 residential units); minor adjustments to the massing, building footprint and height of Plots 3 and 7 (Phase 3) and associated changes to the external building façade of Plots 3, 7and 8 (Phase 3); reconfiguration of commercial floorspace; alterations to play space and landscape design, servicing arrangements, cycle parking and provision of plant.).

    8 May 2025 Conditions