Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Off Chevet Lane Wakefield WF2 6PT

Awaiting decision Wakefield 26/01380/FUL Full applications

Works: Demolition Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of existing equestrian building and erection of 1 dwelling with associated works, including reinstatement of the former building site to grassland and formation of an access drive from the existing field access.

As published by the council, reference 26/01380/FUL

Application record

Reference
26/01380/FUL
Category
Full applications
Status
Awaiting decision
Received
4 Aug 2026
Validated
8 Sep 2026
Postcode
WF2 6PT

Site history

Applications at this address on the Wakefield register

This site has had 2 applications since 2024: 1 approved, 0 refused.

  • 23/01939/S7301 Granted

    Land Off Chevet Lane Wakefield WF2 6PT

    Variation of Condition 2 (approved plans) of planning application 23/01939/FUL dated 23/01/2024 [which granted full planning permission for the construction of 1no. dwelling following the demolition of an existing equestrian building ] to change the approved plans allowing an eaves height increase, additional windows and changes to windows and addition of solar panels.

    Decided 11 Nov 2024 Amendments

Timeline

Dates from the published record

  1. 4 Aug 2026

    Received by Wakefield

  2. 8 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 9 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 3 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Wakefield took a median of 63 days over the applications it decided in the last year.

What happens while it is decided

This application is with Wakefield for determination, against a statutory target of eight weeks. Over the last year Wakefield decided full applications in a median of 80 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Briery House Chevet Lane Wakefield WF2 6PT

    11/00975/FUL Submitted 10 May 2011 0m away

    Farm access from Chevet Lane into field including gates and surfaced area

    Granted Full applications 5 docs
  • Chevet Grange Briery Court Chevet Wakefield WF2 6PT

    25/01652/SUB02 Submitted 16 Jul 2026 0m away

    88% historically approved · decision due ~10 Sep

    Discharge of Condirion 3 (Surfacing Materials & Step Detaill), Condition 10 (Surface Water Drainage), Condition 14 (EV Charging), Condition 15 (External Materials), Condition 16 (On-site sample stone panel) and Condition 17 (Boundary) from approved application 25/01652/FUL

    Awaiting decision 17 docs
  • Chevet Levels Farm Chevet Lane Wakefield WF2 6PT

    24/02256/SUB01 Submitted 15 Jul 2026 0m away

    88% historically approved · decision due ~9 Sep

    Discharge of Condition 2 (BGP) and Condition 3 (Biodiversity Retention) from approved application 24/02256/FUL

    Awaiting decision 4 docs
  • Chevet Grange Briery Court Chevet Wakefield WF2 6PT

    25/01652/SUB01 Submitted 28 May 2026 0m away

    Discharge of Condition 4 (Archaeology), Condition 5 (Biodiversity Gains plan), Condition 6 (HMMP), Condition 8 (Biodiversity CEMP), Condition 9 (Radon) and Condition 12 (Radon) from approved application 25/01652/FUL

    Decided 10 docs
  • Chevet Grange Briery Court Chevet Wakefield WF2 6PT

    25/01653/SUB01 Submitted 5 Aug 2026 0m away

    88% historically approved · decision due ~30 Sep

    Discharge of Condition 2 (Repair Schedule), Condition 3 (Materials), Condition 4 (Window Details), Condition 5 (Door Details), Condition 6 (Flues; Vents; RW Goods & Waste Pipes) and Condition 7 (Barn Pulley Mechanism Protection) from approved application 25/01653/LBC

    Awaiting decision Windows or glazing 12 docs
  • Land Off Chevet Lane Wakefield WF2 6PT

    23/01939/S7301 Submitted 21 May 2024 428m away

    Variation of Condition 2 (approved plans) of planning application 23/01939/FUL dated 23/01/2024 [which granted full planning permission for the construction of 1no. dwelling following the demolition of an existing equestrian building ] to change the approved plans allowing an eaves height increase, additional windows and changes to windows and addition of solar panels.

    Granted Amendments Demolition Windows or glazing 13 docs
    Domestic

In Wakefield

  • 25/02201/FUL Awaiting decision

    Mildred Sylvester Way Normanton

    Erection of one new workshop and associated office, HGV sales, service areas and car parking (sui generis) and erection of one Unit comprising Use Class E (g) (ii) and E (g) (iii), B2/B8 workspace and ancillary service areas and car parking.

    25 Nov 2025 Full applications
  • 26/01674/FUL Awaiting decision

    Driven Ambition Workspace Back Lane Wakefield WF2 9GB

    Proposed external cladding (retrospective)

    14 Sep 2026 Full applications
  • 26/01670/FUL Awaiting decision

    Lr4 18 - 22 Laburnum Road Wakefield WF1 3QS

    Installation of room cooling air conditioning unit internally with external wall-mounted condenser. No change of use.

    14 Sep 2026 Full applications
  • 26/01655/FUL Awaiting decision

    Lupset Hall Horbury Road Wakefield WF2 9RW

    Change of use to education use (Class F1), external alterations including removal of extension, erection of a replacement two-storey extension, revised access arrangements, new parking, a multi-use games area, new fencing, and landscaping.

    11 Sep 2026 Full applications
  • 26/01651/FUL Awaiting decision

    1 Chiltern Drive Ackworth Pontefract West Yorkshire WF7 7DW

    Demolition of existing conservatory to construct single storey extension.

    11 Sep 2026 Full applications