Planning application
26/01129/CPL
27 Buckthorne Road Normanton Wakefield WF6 2FH
Proposal
The proposed works comprise the installation of a rear dormer and the introduction of light gauge galvanised steel reinforcement to the existing timber loft structure.
As published by the council, reference 26/01129/CPL
Timeline
Dates from the published record
-
29 Jun 2026
Received by Wakefield
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Wakefield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About lawful development applications
How this application type works
A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.
Nearby applications
Within 500 metres
-
24/02022/SUB05 Awaiting decision
Buckthorne Road (Land At) Normanton
Discharge of condition 45 (Archaeological WSI) from approved application 24/02022/FUL.
-
24/02022/SUB04 Awaiting decision
Buckthorne Road (Land At) Normanton
Discharge of condition 3 (BNG Gain Plan), 4 (Habitat management and monitoring plan), 6 (Tree protection plan & Arboricultural method statement), 8 (Biodiversity CEMP), 15 (Wildlife enhancement), 18 (Landscaping) and 27 (Tree planting) from approved application 2402022/FUL.
-
24/02022/SUB01 Awaiting decision
Land At Buckthorne Road Normanton
Discharge of condition 5 (Construction traffic management plan), 7 (Construction method statement), 24 (Construction noise), 25 (Soil management plan), 37 (Materials and waste management plan), 43 Contractor contact details) and 44 (dust CEMP) from approved application 24/02022.FUL.
-
24/02022/SUB03 Awaiting decision
Land At Buckthorne Road Normanton
Discharge of conditions 14 (Foul and surface water drainage), 20, (Gas protection), 26 (Temporary drainage), 32 (Estate roads) and 33 (Flood route) from approved application 24/02022/FUL.
-
24/02022/SUB02 Awaiting decision
Land At Buckthorne Road Normanton Wakefield
Discharge of conditions 10 (Materials) and 34 (Boundary treatment) from approved application 24/02022/FUL.
Other lawful development applications
In Wakefield
-
26/00968/CPL Granted
9 De Lacy Avenue Featherstone Pontefract WF7 6AY
Loft conversion to create additional bedroom, including the formation of a rear dormer, new structural steelwork, and associated internal alterations including new staircase to second floor level
-
26/00946/CPL Granted
26 Ackton Lane Featherstone Pontefract WF7 6AT
Loft conversion with dormer to rear and roof windows to front
-
26/01251/CPL Awaiting decision
Low Field House Vale View Ackworth Pontefract WF7 7HQ
Fire damage to existing side extension, extension is to be demolished and rebuilt on same footprint
-
26/00069/CPL Withdrawn
Brookside Farm Thorpe Lane Badsworth Pontefract WF9 1AA
Erection of Garage/Annexe and Gym/Swimming Pool Buildings
-
26/00624/CPE Granted
50 College Grove Road Wakefield West Yorkshire WF1 3RL
Use of the site at as a 10 bedroom House of Multiple Occupation (HMO)