Planning application

Land At Buckthorne Road Normanton

Awaiting decision Wakefield 24/02022/SUB03

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of conditions 14 (Foul and surface water drainage), 20, (Gas protection), 26 (Temporary drainage), 32 (Estate roads) and 33 (Flood route) from approved application 24/02022/FUL.

As published by the council, reference 24/02022/SUB03

Application record

Reference
24/02022/SUB03
Status
Awaiting decision
Received
9 Jul 2026
Validated
9 Jul 2026
Ward
Normanton
Parish
Normanton

Site history

Applications at this address on the Wakefield register

This site has had 2 applications since 2026.

  • 24/02022/SUB01 Awaiting decision

    Land At Buckthorne Road Normanton

    Discharge of condition 5 (Construction traffic management plan), 7 (Construction method statement), 24 (Construction noise), 25 (Soil management plan), 37 (Materials and waste management plan), 43 Contractor contact details) and 44 (dust CEMP) from approved application 24/02022.FUL.

    Submitted 9 Jul 2026

Timeline

Dates from the published record

  1. 9 Jul 2026

    Received by Wakefield

  2. 22 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 3 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Wakefield took a median of 63 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: 24/02022/SUB01 (Awaiting decision)

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

  • LAND QUALITY WAKEFIELD COUNCIL Consultee Comment · 18 Aug 2026
  • DRAINAGE SIMULATION RESULTS - NETWORK DETAILS Drainage Documentation · 06 Aug 2026
  • WAKEFIELD COUNCIL DRAINAGE Consultee Comment · 05 Aug 2026
  • HIGHWAYS DEVELOPMENT MANAGEMENT WAKEFIELD COUNCIL Consultee Comment · 31 Jul 2026
  • GAS RISK ASSESSMENT Supporting Documentation · 10 Jul 2026
  • APPLICATIONFORMREDACTED Application Form · 09 Jul 2026
  • OVERALL ENGINEERING LAYOUT Drawing · 09 Jul 2026
  • RISING MAIN LONGSECTIONS Drawing · 09 Jul 2026
  • DRAINAGE CONSTRUCTION DETAILS Drawing · 09 Jul 2026
  • SUDS DETAILS Drawing · 09 Jul 2026
  • MANHOLE SCHEDULE FIRST OFFS Drawing · 09 Jul 2026
  • SECTION 104 AGREEMENT Drawing · 09 Jul 2026
  • DRAINAGE CATCHMENT AREAS Drawing · 09 Jul 2026
  • FIXING DETAILS Drawing · 09 Jul 2026
  • SURFACE WATER MANAGEMENT PLAN Supporting Documentation · 09 Jul 2026
  • HIGHWAY CONSTRUCTION DETAILS Drawing · 09 Jul 2026
  • SECTION 38 AGREEMENT Drawing · 09 Jul 2026
  • SITE ACCESS PLAN Drawing · 09 Jul 2026
  • FLOOD EXCEEDANCE PLAN Drawing · 09 Jul 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Wakefield for determination, against a statutory target of eight weeks. Over the last year Wakefield's median decision took 63 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Wakefield's portal will say. Our guide explains the common types.