Proposal

Proposed westerly lateral extension (FCC West) to the existing Darrington Magnesian Limestone Quarry (FCC Central and FCC East).

As published by the council, reference 26/00603/FUL

Application record

Reference
26/00603/FUL
Type
Full Application
Status
Awaiting decision
Received
10 Apr 2026
Validated
11 May 2026
Ward
Knottingley
Postcode
WF11 0AH

Site history

Applications at this address on the Wakefield register

This site has had 3 applications since 2022.

  • 13/02320/S7301 Awaiting decision

    Darrington Quarry Stubbs Lane Knottingley WF11 0AH

    Variation of condition 3 (restoration timescales), 4 (approved plans) and 41 (scheme of restoration) pursuant to approved planning application 13/02320/FUL which granted permission to revise the working depth of permitted quarry workings (20.01.2014) to permit additional time for the mineral extraction and restoration of the site and to change the restoration scheme.

    Submitted 10 Apr 2026 Amendments
  • 22/01327/EIASC Awaiting decision

    Darrington Quarry Stubbs Lane Knottingley Wf11 0AH

    Request for a Scoping Opinion under Regulation 15 of The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) in respect of proposed lateral extension to Darrington Hall Quarry: Northern Extension [Wakefield Phase] (C. 14 hectares) - North-Western Extension [Methley Phase] (C. 9 hectares)

    Submitted 16 Jun 2022

Timeline

Dates from the published record

  1. 10 Apr 2026

    Received by Wakefield

  2. 11 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 22 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 6 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Wakefield took a median of 63 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

133 documents on file for this application

  • WAKEFIELD COUNCIL ECOLOGIST Consultee Comment · 11 Sep 2026
  • LAND QUALITY WAKEFIELD COUNCIL Consultee Comment · 30 Jul 2026
  • NORTH YORKSHIRE RESPONSE Consultee Comment · 08 Jul 2026
  • WAKEFIELD COUNCIL PUBLIC RIGHTS OF WAY Consultee Comment · 16 Jun 2026
  • YORKSHIRE WATER Consultee Comment · 11 Jun 2026
  • NETWORK RAIL Consultee Comment · 08 Jun 2026
  • WAKEFIELD COUNCIL URBAN DESIGNER Urban Designer Consultation Response · 05 Jun 2026
  • WEST YORKSHIRE POLICE DOCO Consultee Comment · 03 Jun 2026
  • WEST YORKSHIRE POLICE DOCO Consultee Comment · 02 Jun 2026
  • WMDC HIGHWAY DEVELOPMENT MANAGEMENT Consultee Comment · 02 Jun 2026
  • THE ENVIRONMENT AGENCY Consultee Comment · 02 Jun 2026
  • WAKEFIELD COUNCIL PUBLIC HEALTH Consultee Comment · 01 Jun 2026
  • NATURAL ENGLAND Consultee Comment · 27 May 2026
  • WYAAS Consultee Comment · 26 May 2026
  • NATIONAL HIGHWAYS Consultee Comment · 22 May 2026
  • NATIONAL HIGHWAYS Consultee Comment · 22 May 2026
  • WAKEFIELD COUNCIL DRAINAGE Consultee Comment · 20 May 2026
  • HSE Consultee Comment · 13 May 2026
  • THE COAL AUTHORITY Consultee Comment · 13 May 2026
  • CALCULATIONS BNG Metric · 12 May 2026
  • COVER LETTER REDACTED Correspondence · 13 Apr 2026
  • APPLICATION FORM REDACTED Application Form · 10 Apr 2026
  • SITE LOCATION PLAN Drawing · 10 Apr 2026
  • EXISTING SITE PLAN Drawing · 10 Apr 2026
  • PROPOSED SCHEME DESIGN Drawing · 10 Apr 2026
  • PROPOSED RESTORATION SCHEME Drawing · 10 Apr 2026
  • PLANNING STATEMENT Planning Statement · 10 Apr 2026
  • TRANSPORT STATEMENT Supporting Documentation · 10 Apr 2026
  • ES NTS_FINAL Environmental Statement · 10 Apr 2026
  • FIGURE 1.1 - SITE LOCATION PLAN Environmental Statement · 10 Apr 2026
  • FIGURE 1.2 - PLANNING HISTORY Environmental Statement · 10 Apr 2026
  • FIGURE 1.3 - SITE CONTEXT Environmental Statement · 10 Apr 2026
  • FIGURE 4.1 - PROPOSED FCC WEST SCHEME DESIGN Environmental Statement · 10 Apr 2026
  • FIGURE 4.2 - PROPOSED SCHEME OF PHASING (FCC EAST FCC CENTRAL AND FCC WEST) Environmental Statement · 10 Apr 2026
  • FIGURE 4.3 - PROPOSED RESTORATION SCHEME (FCC WEST) Environmental Statement · 10 Apr 2026
  • FIGURE 4.3A - PROPOSED RESTORATION SCHEME (FCC EAST FCC CENTRAL AND FCC WEST) Environmental Statement · 10 Apr 2026
  • ES MAIN REPORT_FINAL Environmental Statement · 10 Apr 2026
  • SITE LOCATION PLAN Drawing · 10 Apr 2026
  • PLANNING HISTORY Drawing · 10 Apr 2026
  • SITE CONTEXT Drawing · 10 Apr 2026
  • FIGURE 3.1 - CUMULATIVE SITES WITHIN 1KM Environmental Statement · 10 Apr 2026
  • PROPOSED FCC WEST SCHEME DESIGN Drawing · 10 Apr 2026
  • PROPOSED SCHEME OF PHASING Drawing · 10 Apr 2026
  • FIGURE 4.2A - PROPOSED PHASE 1 EXTRACTION Environmental Statement · 10 Apr 2026
  • FIGURE 4.2B - PROPOSED PHASE 2 EXTRACTION Environmental Statement · 10 Apr 2026
  • FIGURE 4.2C - PROPOSED PHASE 3 EXTRACTION Environmental Statement · 10 Apr 2026
  • FIGURE 4.2D - PROPOSED PHASE 4 EXTRACTION Environmental Statement · 10 Apr 2026
  • FIGURE 4.2E - PROPOSED PHASE 5 INFILLING Environmental Statement · 10 Apr 2026
  • PROPOSED RESTORATION SCHEME Drawing · 10 Apr 2026
  • PROPOSED RESTORATION SCHEME Drawing · 10 Apr 2026
  • FIGURE 4.3B - RESTORATION CROSS SECTIONS Environmental Statement · 10 Apr 2026
  • FIGURE 4.4 - GEOLOGICAL CROSS SECTIONS (ILLUSTRATING WATER TABLE) Environmental Statement · 10 Apr 2026
  • FIGURE 4.5 - EXISTING STUBBS LANE PROCESSING SITE (WHICH BENEFITS FROM AN ESTABL Environmental Statement · 10 Apr 2026
  • FIGURE 6.1A LANDSCAPE AND VISUAL CONTEXT Environmental Statement · 10 Apr 2026
  • FIGURE 6.1B ZONE OF THEORETICAL VISIBILITY Environmental Statement · 10 Apr 2026
  • FIGURE 6.2A VIEWPOINT 1 EXISTING VIEW Environmental Statement · 10 Apr 2026
  • FIGURE 6.2B (I) VIEWPOINT 2 EXISTING VIEW (SHEET 1) Environmental Statement · 10 Apr 2026
  • FIGURE 6.2B (II) VIEWPOINT 2 EXISTING VIEW (SHEET 2) Environmental Statement · 10 Apr 2026
  • FIGURE 6.2C (I) VIEWPOINT 3 EXISTING VIEW (SHEET 1) Environmental Statement · 10 Apr 2026
  • FIGURE 6.2C (II) VIEWPOINT 3 EXISTING VIEW (SHEET 2) Environmental Statement · 10 Apr 2026
  • FIGURE 6.2D (I) VIEWPOINT 4 EXISTING VIEW (SHEET 1) Environmental Statement · 10 Apr 2026
  • FIGURE 6.2D (II) VIEWPOINT 4 EXISTING VIEW (SHEET 2) Environmental Statement · 10 Apr 2026
  • FIGURE 6.2E VIEWPOINT 5 EXISTING VIEW Environmental Statement · 10 Apr 2026
  • FIGURE 6.2F VIEWPOINT 7 EXISTING Environmental Statement · 10 Apr 2026
  • FIGURE 6.2G VIEWPOINT 8 EXISTING Environmental Statement · 10 Apr 2026
  • FIGURE 6.2H VIEWPOINT 9 EXISTING VIEW Environmental Statement · 10 Apr 2026
  • FIGURE 6.3A (I) VIEWPOINT 2 EXISTING VIEW Environmental Statement · 10 Apr 2026
  • FIGURE 6.3A (II) VIEWPOINT 2 PHOTOMONTAGE VIEW OPERATIONAL Environmental Statement · 10 Apr 2026
  • FIGURE 6.3A (III) VIEWPOINT 2 PHOTOMONTAGE VIEW RESTORED Environmental Statement · 10 Apr 2026
  • FIGURE 6.3B (I) VIEWPOINT 3 EXISTING VIEW Environmental Statement · 10 Apr 2026
  • FIGURE 6.3B (II) VIEWPOINT 3 PHOTOMONTAGE VIEW OPERATIONAL Environmental Statement · 10 Apr 2026
  • FIGURE 6.3B (III) VIEWPOINT 3 PHOTOMONTAGE VIEW RESTORED Environmental Statement · 10 Apr 2026
  • FIGURE 7.1 - BASELINE NOISE MONITORING POSITIONS Environmental Statement · 10 Apr 2026
  • FIGURE 8.1 - DESIGNATED SITES MAP Environmental Statement · 10 Apr 2026
  • FIGURE 8.2 - UK HABITAT CLASSIFICATION BASELINE MAP Environmental Statement · 10 Apr 2026
  • FIGURE 8.3 - UK HABITAT CLASSIFICATION POST-DEVELOPMENT MAP Environmental Statement · 10 Apr 2026
  • FIGURE 8.4 - HABITAT RETENTION PLAN Environmental Statement · 10 Apr 2026
  • FIGURE 8.5 -TREE CONSTRAINTS PLAN Environmental Statement · 10 Apr 2026
  • FIGURE 9.1 - REGIONAL GEOLOGICAL MAP Environmental Statement · 10 Apr 2026
  • FIGURE 9.2 - GEOLOGICAL CROSS SECTIONS Environmental Statement · 10 Apr 2026
  • FIGURE 13.1 - HERITAGE ASSETS WITHIN THE 1KM STUDY AREA Environmental Statement · 10 Apr 2026
  • FIGURE 13.2 - HERITAGE EVENTS WITHIN THE 1KM STUDY AREA Environmental Statement · 10 Apr 2026
  • FIGURE 13.3 - DESIGNATED HERITAGE ASSETS WITHIN THE 1.5 KM STUDY AREA Environmental Statement · 10 Apr 2026
  • FIGURE 13.4 - GEOPHYSICAL SURVEY RESULTS - DATA PLOT Environmental Statement · 10 Apr 2026
  • FIGURE 13.5 - GEOPHYSICAL SURVEY RESULTS - INTERPRETATION Environmental Statement · 10 Apr 2026
  • FIGURE 14.1A - DEPOSITION DUST STUDY AREA Environmental Statement · 10 Apr 2026
  • FIGURE 14.1B - VEHICLE EMISSIONS STUDY AREA Environmental Statement · 10 Apr 2026
  • FIGURE 14.2 - LOCAL AIR QUALITY FEATURES Environmental Statement · 10 Apr 2026
  • FIGURE 14.3 - DUST ASSESSMENT Environmental Statement · 10 Apr 2026
  • PHASED EXTRACTION SCHEME Drawing · 10 Apr 2026
  • PHASED WORKING AT COMMENCEMENT OF OPERATION Drawing · 10 Apr 2026
  • PHASED WORKING SCHEME 1 Drawing · 10 Apr 2026
  • PHASED WORKING AFTER 2 YEARS Drawing · 10 Apr 2026
  • PHASED WORKING SCHEME 2 Drawing · 10 Apr 2026
  • PHASED WORKING AFTER 4 YEARS Drawing · 10 Apr 2026
  • PHASED WORKING SCHEME 3 Drawing · 10 Apr 2026
  • PHASED WORKING AFTER 8 YEARS Drawing · 10 Apr 2026
  • PHASED WORKING SCHEME 4 Drawing · 10 Apr 2026
  • PHASED WORKING AFTER 8 YEARS Drawing · 10 Apr 2026
  • PHASED WORKING SCHEME 5 Drawing · 10 Apr 2026
  • PHASED WORKING AFTER 10 YEARS Drawing · 10 Apr 2026
  • PHASED WORKING SCHEME 6 Drawing · 10 Apr 2026
  • PHASED WORKING AFTER 12 YEARS Drawing · 10 Apr 2026
  • PHASED WORKING SCHEME 7 Drawing · 10 Apr 2026
  • PHASED WORKING AFTER 14 YEARS Drawing · 10 Apr 2026
  • PHASED WORKING SCHEME 8 Drawing · 10 Apr 2026
  • PHASED WORKING AFTER 16 YEARS Drawing · 10 Apr 2026
  • PHASED WORKING SCHEME 9 Drawing · 10 Apr 2026
  • PHASED WORKING AFTER 17 YEARS Drawing · 10 Apr 2026
  • PHASED WORKING AFTER 18 YEARS Drawing · 10 Apr 2026
  • LANDSCAPE RESTORATION PLAN Drawing · 10 Apr 2026
  • LVIA METHODOLOGY Supporting Documentation · 10 Apr 2026
  • VISUALISATION METHODOLOGY Supporting Documentation · 10 Apr 2026
  • LANDSCAPE EFFECTS Supporting Documentation · 10 Apr 2026
  • EFFECTS ON VIEWPOINTS Supporting Documentation · 10 Apr 2026
  • BASIC ACOUSTIC TERMINOLOGY Supporting Documentation · 10 Apr 2026
  • NOISE SURVEY DETAILS Supporting Documentation · 10 Apr 2026
  • BASELINE & SITE NOISE SURVEY RESULTS Supporting Documentation · 10 Apr 2026
  • PLANT INVENTORY NOISE LEVELS Supporting Documentation · 10 Apr 2026
  • NOISE MAPPING RESULTS Supporting Documentation · 10 Apr 2026
  • HABITAT MAP & TARGET RESULTS Supporting Documentation · 10 Apr 2026
  • PROPOSED RESTORATION SCHEME Drawing · 10 Apr 2026
  • ARBORICULTURAL IMPACT ASSESSMENT Arboricultural Report · 10 Apr 2026
  • PHASE 1 DESK STUDY REPORT Supporting Documentation · 10 Apr 2026
  • SOILS & AGRICULTURAL QUALITY Supporting Documentation · 10 Apr 2026
  • HYDROGEOLOGICAL IMPACT ASSESSMENT Supporting Documentation · 10 Apr 2026
  • APPENDIX 11-2 GROUNDSURE REPORT Environmental Statement · 10 Apr 2026
  • FLOOD RISK & DRAINAGE ASSESSMENT Flood Risk/Run Off Impact Assessment · 10 Apr 2026
  • HERITAGE IMPACT ASSESSMENT Supporting Documentation · 10 Apr 2026
  • GAZETTEER OF ASSETS & EVENTS Supporting Documentation · 10 Apr 2026
  • GEOPHYSICAL SURVEY Supporting Documentation · 10 Apr 2026
  • AIR QUALITY ASSESSMENT METHODOLOGY Air Quality Assessment · 10 Apr 2026
  • DUST ASSESSMENT Supporting Documentation · 10 Apr 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Wakefield for determination, against a statutory target of eight weeks. Over the last year Wakefield decided full applications in a median of 80 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Wakefield

  • 26/00356/FUL Decided

    43 The Croft Castleford WF10 4DQ

    Installation of disabled access platform lift

    26 Feb 2026 Full applications
  • 26/00925/FUL Decided

    6 Orchard Croft Walton Wakefield WF2 6PJ

    Demolition of existing garage and replacement with part single, part two storey side extension including balcony to rear, two storey extension to front and render of the dwelling.

    28 May 2026 Full applications
  • 26/01009/FUL Decided

    81 Southmoor Road Hemsworth Pontefract WF9 4LY

    First floor rear extension

    8 Jun 2026 Full applications
  • 26/01395/FUL Decided

    180 Kingsway Ossett Wakefield WF5 8DW

    Two storey extension to side

    24 Jul 2026 Full applications
  • 26/00224/FUL Decided

    4A Station Road Ryhill Wakefield WF4 2DT

    Retrospective planning permission for the demolition of existing dwellinghouse and changes to ground levels, construction of self-build dwellinghouse with associated works.

    9 Feb 2026 Full applications