Skip to content
PlanIndex Get alerts
Menu

Planning application

Fcc Environment Weeland Road Knottingley WF11 8DZ

Awaiting decision Wakefield 25/02377/FUL Full Application

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed Development of a Waste to Resource Park, including associated infrastructure, drainage, landscaping, access and demolition.

As published by the council, reference 25/02377/FUL

Application record

Reference
25/02377/FUL
Type
Full Application
Status
Awaiting decision
Received
19 Dec 2025
Validated
4 Feb 2026
Ward
Knottingley
Postcode
WF11 8DZ

Timeline

Dates from the published record

  1. 19 Dec 2025

    Received by Wakefield

  2. 4 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 22 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 1 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Wakefield took a median of 63 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Axis PED Limited Agent

32 applications on PlanIndex · across 16 councils · 96% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

223 documents on file for this application

  • HIGHWAYS Consultee Comment · 09 Sep 2026
  • WAKEFIELD COUNCIL HIGHWAYS DEVELOPMENT MANAGEMENT Consultee Comment · 09 Sep 2026
  • WAKEFIELD COUNCIL HIGHWAYS DEVELOPMENT MANAGEMENT Consultee Comment · 09 Sep 2026
  • WAKEFIELD COUNCIL HIGHWAYS DEVELOPMENT MANAGEMENT Consultee Comment · 09 Sep 2026
  • WAKEFIELD COUNCIL HIGHWAYS DEVELOPMENT MANAGEMENT Consultee Comment · 09 Sep 2026
  • WASTE MANAGEMENT SITE (REBUTTAL 2) Supporting Documentation · 10 Aug 2026
  • DESIGNER'S RESPONSE Supporting Documentation · 10 Aug 2026
  • HIGHWAYS Consultee Comment · 31 Jul 2026
  • HIGHWAYS Consultee Comment · 31 Jul 2026
  • RESPONSE TO HIGHWAY COMMENTS Supporting Documentation · 30 Jun 2026
  • WAKEFIELD COUNCIL DRAINAGE Consultee Comment · 23 Jun 2026
  • WAKEFIELD COUNCIL ECOLOGIST Consultee Comment · 28 May 2026
  • DRAINAGE - RESPONSE TO LLFA Drainage Documentation · 27 May 2026
  • ENVIRONMENTAL HEALTH Consultee Comment · 12 May 2026
  • LAND QUALITY WAKEFIELD COUNCIL Consultee Comment · 23 Apr 2026
  • CROSSING SELECTOR TOOL Supporting Documentation · 17 Apr 2026
  • HIGHWAY RESPONSE Highways/Transport Documentation · 17 Apr 2026
  • WY POLICE ARCHITECTURAL LIAISON OFFICER Consultee Comment · 17 Apr 2026
  • THE CANALS AND RIVERS TRUST Consultee Comment · 17 Apr 2026
  • THE ENVIRONMENT AGENCY Consultee Comment · 12 Mar 2026
  • WAKEFIELD COUNCIL DRAINAGE Consultee Comment · 12 Mar 2026
  • WAKEFIELD COUNCIL URBAN DESIGNER Urban Designer Consultation Response · 03 Mar 2026
  • YORKSHIRE WATER Consultee Comment · 24 Feb 2026
  • WAKEFIELD COUNCIL PUBLIC HEALTH Consultee Comment · 19 Feb 2026
  • NATURAL ENGLAND Consultee Comment · 12 Feb 2026
  • NATURAL ENGLAND Consultee Comment · 12 Feb 2026
  • NATURAL ENGLAND Consultee Comment · 12 Feb 2026
  • ACTIVE TRAVEL ENGLAND Consultee Comment · 10 Feb 2026
  • NATIONAL HIGHWAYS Consultee Comment · 10 Feb 2026
  • NORTHERN GAS NETWORKS Consultee Comment · 06 Feb 2026
  • NORTHERN GAS NETWORKS Consultee Comment · 06 Feb 2026
  • NORTHERN GAS NETWORKS Consultee Comment · 06 Feb 2026
  • NORTHERN GAS NETWORKS Consultee Comment · 06 Feb 2026
  • NORTHERN GAS NETWORKS Consultee Comment · 06 Feb 2026
  • WEST YORKSHIRE ARCHAEOLOGY ADVISORY SERVICE Consultee Comment · 06 Feb 2026
  • ECOLOGICAL IMPACT ASSESSMENT Ecological Documentation · 05 Feb 2026
  • BAT DUSK EMERGENCE SURVEYS Ecological Documentation · 05 Feb 2026
  • HERITAGE STATEMENT Heritage Statement · 05 Feb 2026
  • ES ADDENDUM CHAPTER 11.0 - CULTURAL HERITAGE Report · 05 Feb 2026
  • ES ADDENDUM 11A-1 - TECHNICAL APPENDIX - PLATES Report · 05 Feb 2026
  • ES FIGURE 11A.1 - SITE LOCATION AND LOCATION OF HERITAGE ASSETS Drawing · 05 Feb 2026
  • ES FIGURE 11A.2 - OS MAP EXTRACT Drawing · 05 Feb 2026
  • APPLICATIONFORMREDACTED Application Form · 19 Dec 2025
  • CHAPTER 7.0 NOISE Environmental Statement · 19 Dec 2025
  • CHAPTER 8.0 LVIA Environmental Statement · 19 Dec 2025
  • CHAPTER 9.0 SURFACE WATERS AND FLOOD RISK Environmental Statement · 19 Dec 2025
  • CHAPTER 10.0 GROUND CONDITIONS Environmental Statement · 19 Dec 2025
  • CHAPTER 11.0 CULTURAL HERITAGE Environmental Statement · 19 Dec 2025
  • CHAPTER 12.0 CLIMATE CHANGE RESILIENCE Environmental Statement · 19 Dec 2025
  • CHAPTER 13.0 GREENHOUSE GAS EMISSIONS Environmental Statement · 19 Dec 2025
  • CHAPTER 1.0 INTRODUCTION Environmental Statement · 19 Dec 2025
  • CHAPTER 3.0 ALTERNATIVES Environmental Statement · 19 Dec 2025
  • CHAPTER 4.0 SCHEME DESCRIPTION Environmental Statement · 19 Dec 2025
  • CHAPTER 5.0 TRANSPORT Environmental Statement · 19 Dec 2025
  • CHAPTER 6.0 AIR QUALITY AND ODOUR Environmental Statement · 19 Dec 2025
  • ASSESSMENT & OUTLINE DRAINAGE STRATEGY Flood Risk/Run Off Impact Assessment · 19 Dec 2025
  • HERITAGE GAZETTEER Environmental Statement · 19 Dec 2025
  • PLATES Environmental Statement · 19 Dec 2025
  • REFERENCES Environmental Statement · 19 Dec 2025
  • CLIMATE BASELINE REPORT Environmental Statement · 19 Dec 2025
  • CLIMATE CHANGE RESILIENCE ASSESSMENT Environmental Statement · 19 Dec 2025
  • GREENHOUSE GAS ASSESSMENT Environmental Statement · 19 Dec 2025
  • APPENDICES - CONTENTS AND FOREWORD Environmental Statement · 19 Dec 2025
  • EIA SCOPING REPORT FIGURES Environmental Statement · 19 Dec 2025
  • EIA SCOPING REPORT Environmental Statement · 19 Dec 2025
  • CONSTRUCTION DUST ASSESSMENT METHODOLOGY Environmental Statement · 19 Dec 2025
  • FUGITIVE ODOUR ASSESSMENT METHODOLOGY Environmental Statement · 19 Dec 2025
  • DISPERSION MODELLING Environmental Statement · 19 Dec 2025
  • ACOUSTIC TERMINOLOGY Noise Documentation · 19 Dec 2025
  • LVIA METHODOLOGY Environmental Statement · 19 Dec 2025
  • ZTV METHODOLOGY Environmental Statement · 19 Dec 2025
  • HEALTH IMPACT ASSESSMENT (HIA) Supporting Documentation · 19 Dec 2025
  • APPENDIX 3-4 ENERGY STATEMENT Supporting Documentation · 19 Dec 2025
  • TRANSPORT ASSESSMENT Highways/Transport Documentation · 19 Dec 2025
  • FIGURE 1.1 SITE LOCATION PLAN Environmental Statement · 19 Dec 2025
  • FIGURE 2.1 CUMULATIVE SITE LOCATIONS Environmental Statement · 19 Dec 2025
  • FIGURES - CONTENTS AND FOREWORD Environmental Statement · 19 Dec 2025
  • FIGURE 5.6 COMMITTED DEVELOPMENT DAILY FLOWS Environmental Statement · 19 Dec 2025
  • FIGURE 5.7 2030 WITHOUT DEVELOPMENT AADT TRAFFIC FLOWS Environmental Statement · 19 Dec 2025
  • FIGURE 5.8 2030 WITHOUT DEVELOPMENT AAWT TRAFFIC FLOWS Environmental Statement · 19 Dec 2025
  • FIGURE 5.9 DEVELOPMENT STAFF TRAFFIC DISTRIBUTION Environmental Statement · 19 Dec 2025
  • FIGURE 5.10 DEVELOPMENT HGV TRAFFIC DISTRIBUTION Environmental Statement · 19 Dec 2025
  • FIGURE 5.11 DEVELOPMENT DAILY TRAFFIC FLOWS Environmental Statement · 19 Dec 2025
  • FIGURE 5.12 2030 WITH DEVELOPMENT AADT TRAFFIC FLOWS Environmental Statement · 19 Dec 2025
  • FIGURE 5.13 2030 WITH DEVELOPMENT AAWT TRAFFIC FLOWS Environmental Statement · 19 Dec 2025
  • FIGURE 6.1 CONSTRUCTION DUST SCREENING ZONES Environmental Statement · 19 Dec 2025
  • FIGURE 6.2 HUMAN SENSITIVE RECEPTOR LOCATIONS Environmental Statement · 19 Dec 2025
  • FIGURE 6.3 ECOLOGICAL SENSITIVE RECEPTOR LOCATIONS Environmental Statement · 19 Dec 2025
  • FIGURE 6.4 MODELLING DOMAIN Environmental Statement · 19 Dec 2025
  • FIGURE 6.5 WIND ROSES_BRAMHAM 2018 TO 2022 Environmental Statement · 19 Dec 2025
  • FIGURE 6.6 MODELLED BUILDINGS AND SOURCES Environmental Statement · 19 Dec 2025
  • FIGURE 6.7 ANNUAL MEAN NITROGEN DIOXIDE Environmental Statement · 19 Dec 2025
  • FIGURE 6.8 ANNUAL MEAN NOX Environmental Statement · 19 Dec 2025
  • FIGURE 6.9 98TH PERCENTILE OF HOURLY MEAN ODOUR CONCENTRATIONS Environmental Statement · 19 Dec 2025
  • FIGURE 7.1 NOISE SENSITIVE RECEPTOR LOCATIONS AND MONITORING POSITIONS Environmental Statement · 19 Dec 2025
  • FIGURE 8.1 LANDSCAPE CONTEXT PLAN Environmental Statement · 19 Dec 2025
  • FIGURE 8.2 ZTV AND VIEWPOINT PLAN Environmental Statement · 19 Dec 2025
  • FIGURE 8.3.1 VIEWPOINT 1 EXISTING VIEW SHEET 1 OF 3 Environmental Statement · 19 Dec 2025
  • FIGURE 8.3.1 VIEWPOINT 1 EXISTING VIEW SHEET 2 OF 3 Environmental Statement · 19 Dec 2025
  • FIGURE 8.3.1 VIEWPOINT 1 EXISTING VIEW SHEET 3 OF 3 Environmental Statement · 19 Dec 2025
  • FIGURE 8.3.2 VIEWPOINT 2 EXISTING VIEW Environmental Statement · 19 Dec 2025
  • FIGURE 8.3.3 VIEWPOINT 3 EXISTING VIEW Environmental Statement · 19 Dec 2025
  • FIGURE 8.3.4 VIEWPOINT 4 EXISTING VIEW Environmental Statement · 19 Dec 2025
  • FIGURE 8.3.5 VIEWPOINT 5 EXISTING VIEW Environmental Statement · 19 Dec 2025
  • FIGURE 8.3.6 VIEWPOINT 6 EXISTING VIEW SHEET 1 OF 2 Environmental Statement · 19 Dec 2025
  • FIGURE 8.3.6 VIEWPOINT 6 EXISTING VIEW SHEET 2 OF 2 Environmental Statement · 19 Dec 2025
  • FIGURE 8.3.7 VIEWPOINT 7 EXISTING VIEW Environmental Statement · 19 Dec 2025
  • FIGURE 8.3.8 VIEWPOINT 8 EXISTING VIEW Environmental Statement · 19 Dec 2025
  • FIGURE 9.1 WATERCOURSES Environmental Statement · 19 Dec 2025
  • FIGURE 9.2 SITE TOPOGRAPHY Environmental Statement · 19 Dec 2025
  • FIGURE 9.3 FLUVIAL FLOOD RISK_ EA FLOOD MAP FOR PLANNING Environmental Statement · 19 Dec 2025
  • FIGURE 9.4 FLUVIAL FLOOD RISK_HYDRAULIC MODELLING RESULTS 1.0 AEP Environmental Statement · 19 Dec 2025
  • FIGURE 9.5 FLUVIAL FLOOD RISK_HYDRAULIC MODELLING RESULTS 0.1 AEP Environmental Statement · 19 Dec 2025
  • FIGURE 9.6 SURFACE WATER FLOOD RISK_EA RISK OF FLOODING FROM SURFACE WATER Environmental Statement · 19 Dec 2025
  • FIGURE 11.1 SITE LOCATION Environmental Statement · 19 Dec 2025
  • FIGURE 11.2 DESIGNATED HERITAGE ASSETS WITHIN 3KM STUDY AREA Environmental Statement · 19 Dec 2025
  • FIGURE 11.3 NON-DESIGNATED HERITAGE ASSETS WITHIN 1KM STUDY AREA Environmental Statement · 19 Dec 2025
  • FIGURE 11.4 PREVIOUS ARCHAEOLOGICAL EVENTS WITHIN 1KM STUDY AREA Environmental Statement · 19 Dec 2025
  • FIGURE 11.5 EXTRACTS FROM MAPS Environmental Statement · 19 Dec 2025
  • FIGURE 11.6 EXTRACTS FROM 1842 TITHE MAP AND ORDNANCE SURVEY MAPS Environmental Statement · 19 Dec 2025
  • FIGURE 11.7 EXTRACT FROM SATELLITE IMAGERY JULY 2022 Environmental Statement · 19 Dec 2025
  • FIGURE 5.1 2025 OBSERVED BASE 0700 TO1900 TRAFFIC FLOWS Environmental Statement · 19 Dec 2025
  • FIGURE 5.2 2025 OBSERVED BASE FACTORED AAWT TRAFFIC FLOWS Environmental Statement · 19 Dec 2025
  • FIGURE 5.3 2025 OBSERVED BASE FACTORED AADT TRAFFIC FLOWS Environmental Statement · 19 Dec 2025
  • FIGURE 5.4 2030 FORECAST BASE AAWT TRAFFIC FLOWS Environmental Statement · 19 Dec 2025
  • FIGURE 5.5 2030 FORECAST BASE AADT TRAFFIC FLOWS Environmental Statement · 19 Dec 2025
  • STATEMENT OF COMMUNITY CONSULTATION Supporting Documentation · 19 Dec 2025
  • PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT_PART 6 Environmental Statement · 19 Dec 2025
  • PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT_PART 7 Environmental Statement · 19 Dec 2025
  • PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT_PART 8 Environmental Statement · 19 Dec 2025
  • PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT_PART 9 Environmental Statement · 19 Dec 2025
  • PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT_PART 11 Environmental Statement · 19 Dec 2025
  • PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT_PART 12 Environmental Statement · 19 Dec 2025
  • PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT_PART 13 Environmental Statement · 19 Dec 2025
  • PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT_PART 14 Environmental Statement · 19 Dec 2025
  • PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT PART 1 Environmental Statement · 19 Dec 2025
  • PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT_PART 2 Environmental Statement · 19 Dec 2025
  • PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT_PART 3 Environmental Statement · 19 Dec 2025
  • PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT_PART 4 Environmental Statement · 19 Dec 2025
  • PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT_PART 5 Environmental Statement · 19 Dec 2025
  • FIGURE 8.4 INDICATIVE LANDSCAPE MASTERPLAN Environmental Statement · 19 Dec 2025
  • CHAPTER 2.0 APPROACH TO THE EIA Environmental Statement · 19 Dec 2025
  • CHAPTER 14.0 SUMMARY OF EFFECTS Environmental Statement · 19 Dec 2025
  • FIGURE 4.11 11_ACID _ALKALINE WASTE TREATMENT FACILITY_MULTIPLE UNIT_ELEVATIONS Environmental Statement · 19 Dec 2025
  • FIGURE 4.12 12_LIQUID WASTE AND LEACHATE TREATMENT HUB_ PLANS AND ELEVATIONS Environmental Statement · 19 Dec 2025
  • FIGURE 4.13 13_WASTE DRYER BUILDING_PLANS AND ELEVATIONS Environmental Statement · 19 Dec 2025
  • FIGURE 4.14 14 _HEAVY METAL TREATMENT AND RECOVERY FACILITY_PLANS Environmental Statement · 19 Dec 2025
  • FIGURE 4.15 14_HEAVY METAL TREATMENT AND RECOVERY FACILITY_ELEVATIONS Environmental Statement · 19 Dec 2025
  • FIGURE 4.16 15_STORAGE BUILDING_PLANS AND ELEVATIONS Environmental Statement · 19 Dec 2025
  • FIGURE 4.17 16_WASTE STORAGE AREA WITH CANOPY_PLANS AND ELEVATIONS Environmental Statement · 19 Dec 2025
  • FIGURE 4.18 17_STORAGE BUILDING_PLANS AND ELEVATIONS Environmental Statement · 19 Dec 2025
  • FIGURE 4.19 PROPOSED SITE ELEVATION W-W - FROM THE SOUTH LOOKING NORTH Environmental Statement · 19 Dec 2025
  • FIGURE 4.20 PROPOSED SITE ELEVATION X-X - FROM THE EAST LOOKING WEST Environmental Statement · 19 Dec 2025
  • FIGURE 4.21 PROPOSED SITE ELEVATION Y-Y - FROM THE NORTH LOOKING SOUTH Environmental Statement · 19 Dec 2025
  • FIGURE 4.22 PROPOSED SITE ELEVATION Z-Z - FROM THE WEST LOOKING EAST Environmental Statement · 19 Dec 2025
  • FIGURE 4.23 PROJECT ELEMENT WASTE FLOW DIAGRAM Environmental Statement · 19 Dec 2025
  • FIGURE 4.1 SITE LAYOUT _EXISTING Environmental Statement · 19 Dec 2025
  • FIGURE 4.2 INDICATIVE MASTERPLAN Environmental Statement · 19 Dec 2025
  • FIGURE 4.3 1_EXISTING MAIN OFFICE BUILDING _PLANS AND ELEVATIONS Environmental Statement · 19 Dec 2025
  • FIGURE 4.4 7_EXISTING PACKAGE WASTE RECOVERY FACILITY PROCESS BUILDING_PLANS AND Environmental Statement · 19 Dec 2025
  • FIGURE 4.5 9 _EXISTING PACKAGE WASTE RECOVERY FACILITY STORAGE BUILDING _PLANS A Environmental Statement · 19 Dec 2025
  • FIGURE 4.6 SITE LAYOUT _DEMOLITION PLAN Environmental Statement · 19 Dec 2025
  • FIGURE 4.7 5_PACKAGE WASTE RECOVERY FACILITY_PLANS AND ELEVATIONS Environmental Statement · 19 Dec 2025
  • FIGURE 4.8 6_PACKAGE WASTE STORAGE AREA WITH CANOPY_PLANS AND ELEVATIONS Environmental Statement · 19 Dec 2025
  • FIGURE 4.9 8_ PACKAGE WASTE RECOVERY FACILITY BUILDING 2_PLANS AND ELEVATIONS Environmental Statement · 19 Dec 2025
  • FIGURE 4.10 11_ACID_ALKALINE WASTE TREATMENT FACILITY_MULTIPLE UNIT_PLANS Environmental Statement · 19 Dec 2025
  • INDICATIVE LANDSCAPE MASTERPLAN Drawing · 19 Dec 2025
  • NTS FIGURE 3.1 EXISTING SITE LAYOUT Environmental Statement · 19 Dec 2025
  • NTS FIGURE 3.2 INDICATIVE PROPOSED MASTERPLAN Environmental Statement · 19 Dec 2025
  • NTS FIGURE 3.3 PROPOSED DEMOLITION PLAN Environmental Statement · 19 Dec 2025
  • NTS FIGURE 3.4 INDICATIVE LANDSCAPE MASTERPLAN Environmental Statement · 19 Dec 2025
  • NTS FIGURE 1.1 SITE LOCATION PLAN Environmental Statement · 19 Dec 2025
  • NON-TECHNICAL SUMMARY Environmental Statement · 19 Dec 2025
  • CHAPTER 0.0 - CONTENTS AND FOREWORD Environmental Statement · 19 Dec 2025
  • ENVIRONMENTAL STATEMENT - CONTENTS AND FOREWORD Environmental Statement · 19 Dec 2025
  • 14 - HEAVY METAL TREATMENT AND RECOVERY FACILITY - ELEVATIONS Drawing · 19 Dec 2025
  • 15 - STORAGE BUILDING - PLANS AND ELEVATIONS Drawing · 19 Dec 2025
  • 16 - WASTE STORAGE AREA WITH CANOPY - PLANS AND ELEVATIONS Drawing · 19 Dec 2025
  • 17 - STORAGE BUILDING - PLANS AND ELEVATIONS Drawing · 19 Dec 2025
  • CYCLE SHELTER - PLAN AND ELEVATIONS Drawing · 19 Dec 2025
  • EXISTING SITE ELEVATION W-W - FROM THE SOUTH LOOKING NORTH Drawing · 19 Dec 2025
  • EXISTING SITE ELEVATION X-X - FROM THE EAST LOOKING WEST Drawing · 19 Dec 2025
  • EXISTING SITE ELEVATION Y-Y - FROM THE NORTH LOOKING SOUTH Drawing · 19 Dec 2025
  • EXISTING SITE ELEVATION Z-Z - FROM THE WEST LOOKING EAST Drawing · 19 Dec 2025
  • PROPOSED SITE ELEVATION W-W - FROM THE SOUTH LOOKING NORTH Drawing · 19 Dec 2025
  • PROPOSED SITE ELEVATION X-X - FROM THE EAST LOOKING WEST Drawing · 19 Dec 2025
  • PROPOSED SITE ELEVATION Y-Y - FROM THE NORTH LOOKING SOUTH Drawing · 19 Dec 2025
  • PROPOSED SITE ELEVATION Z-Z - FROM THE WEST LOOKING EAST Drawing · 19 Dec 2025
  • EXISTING SITE SECTION A-A Drawing · 19 Dec 2025
  • EXISTING SITE SECTION B-B Drawing · 19 Dec 2025
  • PROPOSED SITE SECTION A-A Drawing · 19 Dec 2025
  • PROPOSED SITE SECTION B-B Drawing · 19 Dec 2025
  • DEMOLISHED ELECTRIC STORES AND WORKSHOP - PLANS AND ELEVATIONS Drawing · 19 Dec 2025
  • DEMOLISHED TANK ELEVATIONS - SHEET 1 Drawing · 19 Dec 2025
  • PLOT 10 DEMOLISHED STORES - PLANS AND ELEVATIONS Drawing · 19 Dec 2025
  • PLOT 10 DEMOLISHED FITTING AND WELDING WORKSHOP - PLANS AND ELEVATI Drawing · 19 Dec 2025
  • 2 - GATEHOUSE - PLANS AND ELEVATIONS Drawing · 19 Dec 2025
  • 5 - PACKAGE WASTE RECOVERY FACILITY - PLANS AND ELEVATIONS Drawing · 19 Dec 2025
  • 6 - PACKAGE WASTE STORAGE AREA WITH CANOPY - PLANS AND ELEVATIONS Drawing · 19 Dec 2025
  • 8 - PACKAGE WASTE RECOVERY FACILITY BUILDING 2 - PLANS AND ELEVATIO Drawing · 19 Dec 2025
  • 11 - ACID - ALKALINE WASTE TREATMENT FACILITY MULTIPLE UNIT - PLAN Drawing · 19 Dec 2025
  • 11 - ACID - ALKALINE WASTE TREATMENT FACILITY MULTIPLE UNIT - ELEVA Drawing · 19 Dec 2025
  • 12 - LIQUID WASTE AND LEACHATE TREATMENT HUB - PLANS AND ELEVATIONS Drawing · 19 Dec 2025
  • 13 - WASTE DRYER BUILDING - PLANS AND ELEVATIONS Drawing · 19 Dec 2025
  • 14 - HEAVY METAL TREATMENT AND RECOVERY FACILITY - PLANS Drawing · 19 Dec 2025
  • C_D EXISTING AMENITIES BLOCK AND STORE - PLANS AND ELEVATIONS Drawing · 19 Dec 2025
  • E_F EXISTING LABORATORY_ WORKSHOP_TRANSFORMER AND SWITCHROOM - PLANS Drawing · 19 Dec 2025
  • EXISTING GAS ENCLOSURE - PLAN AND ELEVATIONS Drawing · 19 Dec 2025
  • EXISTING TANK ELEVATIONS - SHEET 1 Drawing · 19 Dec 2025
  • EXISTING TANK ELEVATIONS - SHEET 2 Drawing · 19 Dec 2025
  • EXISTING TANK ELEVATIONS - SHEET 3 Drawing · 19 Dec 2025
  • LOCATION PLAN Drawing · 19 Dec 2025
  • SITE LAYOUT - EXISTING Drawing · 19 Dec 2025
  • EXISTING MAIN OFFICE BUILDING - PLANS AND ELEVATIONS Drawing · 19 Dec 2025
  • EXISTING PACKAGE WASTE RECOVERY FACILITY PROCESS BUILDING - PLANS A Drawing · 19 Dec 2025
  • EXISTING PACKAGE WASTE RECOVERY FACILITY STORAGE BUILDING - PLANS A Drawing · 19 Dec 2025
  • A_B EXISTING BOILER HOUSES 3 AND 5 - PLANS AND ELEVATIONS Drawing · 19 Dec 2025
  • SITE LAYOUT - DEMOLITION PLAN Drawing · 19 Dec 2025
  • INDICATIVE MASTERPLAN Drawing · 19 Dec 2025
  • PLANNING STATEMENT Planning Statement · 19 Dec 2025
  • COVERING LETTER Correspondence · 19 Dec 2025
  • APPRAISAL Ecological Documentation · 19 Dec 2025
  • CONDITION ASSESSMENTS BNG Metric · 19 Dec 2025

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Wakefield for determination, against a statutory target of eight weeks. Over the last year Wakefield decided full applications in a median of 80 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Common Lane (Land South Of) Knottingley WF11 8BN

    22/00345/SUB01 Submitted 22 Nov 2024 427m away

    Discharge of condition 17 (Arboricultural Method Statement and Tree Protection Plan) from approved application 22/00345/FUL.

    Granted Conditions Trees 6 docs
  • 2 Low Green Knottingley WF11 8DF

    23/00261/FUL Submitted 12 Feb 2023 434m away

    Replacement of existing garage roof

    Granted Full applications 8 docs

In Wakefield

  • 26/00356/FUL Decided

    43 The Croft Castleford WF10 4DQ

    Installation of disabled access platform lift

    26 Feb 2026 Full applications
  • 26/00925/FUL Decided

    6 Orchard Croft Walton Wakefield WF2 6PJ

    Demolition of existing garage and replacement with part single, part two storey side extension including balcony to rear, two storey extension to front and render of the dwelling.

    28 May 2026 Full applications
  • 26/01009/FUL Decided

    81 Southmoor Road Hemsworth Pontefract WF9 4LY

    First floor rear extension

    8 Jun 2026 Full applications
  • 26/01395/FUL Decided

    180 Kingsway Ossett Wakefield WF5 8DW

    Two storey extension to side

    24 Jul 2026 Full applications
  • 26/00224/FUL Decided

    4A Station Road Ryhill Wakefield WF4 2DT

    Retrospective planning permission for the demolition of existing dwellinghouse and changes to ground levels, construction of self-build dwellinghouse with associated works.

    9 Feb 2026 Full applications