Planning application
Land South of Castle Gate, Stanley, Wakefield
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
A severable, phased Hybrid Planning Application for: (1) Full planning permission for highways infrastructure works including the creation of accesses off Castle Gate, widening of Castle Gate, off-site highways works including to the junction between Castle Gate and Aberford Road and the creation of internal estate roads, development plateaus and associated drainage and strategic landscaping works (2) Outline planning permission on the Northern Part of Site for E(g)(ii) Research and development of products or processes, E(g)(iii) Industrial processes, B2 General industrial and B8 Storage or distribution uses with ancillary E(g)(i) Offices (3) Outline planning permission on the Southern Part of Site for E(g)(ii) Research and development of products or processes, E(g)(iii) Industrial processes, B2 General industrial and B8 Storage or distribution uses with ancillary E(g)(i) Offices
As published by the council, reference 25/01769/HYB
Application record
- Reference
- 25/01769/HYB
- Type
- Hybrid Application
- Status
- Awaiting decision
- Received
- 18 Sep 2025
- Validated
- 3 Oct 2025
- Ward
- Stanley And Outwood East
Timeline
Dates from the published record
-
18 Sep 2025
Received by Wakefield
-
3 Oct 2025
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 28 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Wakefield took a median of 63 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
188 documents on file for this application
- MAXIMUM BUILDING HEIGHTS PARAMETERS PLAN
- WAKEFIELD COUNCIL URBAN DESIGNER
- ACTIVE TRAVEL ENGLAND
- ACTIVE TRAVEL ENGLAND
- DESIGN RESPONSE TEXT
- DESIGN RESPONSE APPENDIX 1
- DESIGN RESPONSE APPENDIX 2
- DESIGN RESPONSE APPENDIX 3
- DESIGN RESPONSE APPENDIX 4
- WRITTEN SCHEME OF INVESTIGATION
- CASTLEGATE 2ND ATE RESPONSE
- ILLUSTRATIVE MASTERPLAN
- ACTIVE TRAVEL PLAN - SITE PLAN
- ACTIVE TRAVEL MOVEMENT PLAN
- WAKEFIELD COUNCIL URBAN DESIGNER
- ACTIVE TRAVEL ENGLAND
- HYBRID PLANNING APPLICATION - SITE PLAN
- WEST YORKSHIRE ARCHAEOLOGY ADVISORY SERVICE
- ACTIVE TRAVEL ENGLAND RESPONSE
- GEOPHYSICAL SURVEY REPORT
- SURFACE_DRAINAGE_STRATEGY
- HIGHWAYS DM
- DESIGN AND ACCESS STATEMENT APPENDIX
- HIGHWAYS LAND BNG METRIC
- WEST YORKSHIRE COMBINED AUTHORITY
- TRANSPORT MATTERS ? ADDENDUM
- NATIONAL HIGHWAYS
- NATIONAL HIGHWAYS
- NATIONAL HIGHWAYS
- ROAD SAFETY AUDIT
- BNG ASSESSMENT - HIGHWAYS LAND
- BNG DRAFT GAIN PLAN - HIGHWAYS LAND
- WRITTEN SCHEME OF INVESTIGATION
- RESPONSE TO URBAN DESIGN OFFICER
- HIGHWAY RETAINING WALLS
- STRATEGIC LANDSCAPE MASTERPLAN
- PROPOSED VEGETATION STRATEGY TO HIGHWAY JUNCTION
- S38 GENERAL ARRANGEMENT SHEET 1 OF 3
- S38 GENERAL ARRANGEMENT SHEET 2 OF 3
- S38 GENERAL ARRANGEMENT SHEET 3 OF 3
- PROPOSED KERB ARRANGEMENT SHEET 1 OF 3
- PROPOSED KERB ARRANGEMENT SHEET 2 OF 3
- PROPOSED KERB ARRANGEMENT SHEET 3 OF 3
- D AND A ADDITIONAL SECTIONS
- DRAINAGE COMMENTS
- RESPONSE LETTER TO NATIONAL HIGHWAYS
- UPDATED COLLISION DATA
- INFRASTRUCTURE DRAINAGE STRATEGY
- SURFACE WATER DRAINAGE STRATEGY
- DRAINAGE EXCEEDANCE PLAN
- STATEMENT ON DRAINAGE
- STATEMENT ON PROW
- NATIONAL HIGHWAYS PLANNING RESPONSE
- NATIONAL HIGHWAYS PLANNING RESPONSE
- YORKSHIRE WATER
- YORKSHIRE WATER
- WEST YORKSHIRE ARCHAEOLOGY ADVISORY SERVICE
- ROAD SAFETY AUDIT - STAGE 1
- DRAINAGE COMMENTS
- WATER MAINS OVERLAY PLAN
- LAND QUALITY WAKEFIELD COUNCIL
- ENVIRONMENTAL HEALTH
- ROAD SAFETY AUDIT BRIEF
- THE COAL AUTHORITY
- THE COAL AUTHORITY
- HORIZON TESTS
- WAKEFIELD COUNCIL PUBLIC RIGHTS OF WAY
- RESPONSE TO TREE RELATED COMMENTS
- LLFA PLANNING RESPONSE
- -DRAINAGE__FLOOD_RISK-STATEMENT
- YORKSHIRE WATER
- ES APPENDIX 9.3 - COAL MINING RISK ASSESSMENT AND COAL RECOVERY REPORT (ON-SITE)
- ES APPENDIX 9.4 - COAL MINING REPORT HIGHWAYS LAND
- ES APPENDIX 7.2 ADDENDUM TO PRELIMINARY ECOLOGICAL APPRAISAL FINAL
- LEEDS CITY COUNCIL HIGHWAYS AUTHORITY
- OBJECTS
- WAKEFIELD COUNCIL URBAN DESIGNER
- WAKEFIELD COUNCIL DRAINAGE
- BPI PROPERTIES
- WAKEFIELD COUNCIL ECOLOGIST
- LEEDS CITY COUNCIL
- WAKEFIELD COUNCIL PUBLIC HEALTH
- WEST YORKSHIRE POLICE DOCO
- ACTIVE TRAVEL ENGLAND
- THE ENVIRONMENT AGENCY
- NATIONAL HIGHWAYS
- NATIONAL HIGHWAYS
- NATIONAL HIGHWAYS
- THE COAL AUTHORITY
- HISTORIC ENGLAND
- CLLR OBJECTS
- NATURAL ENGLAND
- NATURAL ENGLAND
- WAKEFIELD DISTRICT BADGER GROUP
- NORTHERN GAS NETWORKS
- NORTHERN GAS NETWORKS
- NORTHERN GAS NETWORKS
- NORTHERN GAS NETWORKS
- NORTHERN POWERGRID - LETTER
- NORTHERN POWERGRID - MAP 1
- NORTHERN POWERGRID - MAP 2
- NORTHERN POWERGRID - MAP 3
- BNG DRAFT GAIN PLAN - HIGHWAYS
- BNG DRAFT GAIN PLAN - MAIN SITE
- CRIME AND SAFETY ASSESSMENT
- BNG METRIC MAIN SITE
- BNG METRIC HIGHWAYS
- ES APPENDIX 9.7 - REMEDIAL STRATEGY REPORTS
- APPLICATIONFORMREDACTED
- LOCATION PLAN
- PROPOSED CONVERSION TO SIGNAL CONTROL
- PROPOSED SITE ACCESS ARRANGEMENT
- LAND USE PARAMETERS PLAN
- MAXIMUM BUILDING HEIGHTS PARAMETERS PLAN
- INFRASTRUCTURE AND SITE PREP
- NORTHERN PLOTS
- SOUTHERN PLOTS
- ILLUSTRATIVE MASTERPLAN
- STRATEGIC LANDSCAPE MASTERPLAN
- STAGE 1 AND 2 AIA EMPLOYMENT SITE
- ENVIRONMENTAL STATEMENT VOLUME 3: MAIN TEXT PART 1
- ENVIRONMENTAL STATEMENT VOLUME 3: MAIN TEXT PART 2
- APPENDIX 6.1 - VIEWPOINTS
- APPENDIX 6.2 - NATIONAL CHARACTER AREA PROFILE
- APPENDIX 6.3 - LANDSCAPE MASTERPLAN
- PEA - HIGHWAYS WORKS
- ES APPENDIX 7.4 AMPHIBIAN SURVEY REPORT
- ES APPENDIX 7.5 BAT SURVEY REPORT
- ES APPENDIX 7.7 ORNITHOLOGY SURVEYS REPORT
- ES APPENDIX 9.1 - DESK STUDY REPORT (ON-SITE) PART 1
- ES APPENDIX 9.6 - PRELIMINARY GEOENVIRONMENTAL GROUND INVESTIGATION (ON-SITE)
- TRANSPORT ASSESSMENT
- ES APPENDIX 10.1 - TA PART3
- ES APPENDIX 10.1 - TA PART4
- ES APPENDIX 10.1 - TA PART5
- ES APPENDIX 10.1 - TA PART6
- TRAVEL PLAN
- ES APPENDIX 10.3 - ES FLOWS
- APPENDIX 12.1: CLIMATE CHANGE
- NOISE IMPACT ASSESSMENT
- S38 FINISHED LEVELS SHEET 1 OF 3
- S38 FINISHED LEVELS SHEET 2 OF 3
- S38 FINISHED LEVELS SHEET 3 OF 3
- S38 GENERAL ARRANGEMENT SHEET 1 OF 3
- S38 GENERAL ARRANGEMENT SHEET 2 OF 3
- S38 GENERAL ARRANGEMENT SHEET 3 OF 3
- PROPOSED EARTHWORKS LEVELS
- PROPOSED EARTHWORKS CUT AND FILL ANALYSIS
- PLATEAU 1 CUT AND FILL ANALYSIS
- SITE SECTIONS SHEET 1 OF 5
- SITE SECTIONS SHEET 2 OF 5
- SITE SECTIONS SHEET 3 OF 5
- SITE SECTIONS SHEET 4 OF 5
- SITE SECTIONS SHEET 5 OF 5
- SURFACE WATER DRAINAGE STRATEGY
- FOUL WATER DRAINAGE STRATEGY
- HIGHWAYS WATER DRAINAGE STRATEGY
- GENERAL ARRANGEMENT OF ATTENUATION BASIN AND DETAILS
- PROPOSED VEGETATION STRATEGY TO HIGHWAY JUNCTION
- ES14 EMPLOYMENT ALLOCATION MASTERPLANNING PRINCIPLES
- ENVIRONMENTAL STATEMENT VOLUME 2: MAIN TEXT
- ENVIRONMENTAL STATEMENT VOLUME 1: NON-TECHNICAL SUMMARY
- MASTERPLANNING DESIGN ACCESS STATEMENT 1
- MASTERPLANNING DESIGN ACCESS STATEMENT 2
- MASTERPLANNING DESIGN ACCESS STATEMENT 3
- MASTERPLANNING DESIGN ACCESS STATEMENT 4
- MASTERPLANNING DESIGN ACCESS STATEMENT 5
- ES14-ALLOCATION MASTERPLAN
- ES14-ALLOCATION-DESIGN PARAMETERS
- BNG ASSESSMENT - MAIN SITE
- BNG ASSESSMENT - HIGHWAYS
- EXTERNAL LIGHTING STRATEGY
- HEALTH IMPACT ASSESSMENT
- STATEMENT OF COMMUNITY INVOLVEMENT
- COVERING LETTER
- ES APPENDIX 10.1 - TA PART2
- PEA EMPLOYMENT SITE
- ES APPENDIX 7.2 ADDENDUM TO PRELIMINARY ECOLOGICAL APPRAISAL
- ES APPENDIX 9.1 - DESK STUDY REPORT (ON-SITE) PART 2
- ES APPENDIX 9.2 - GEOENVIRONMENTAL DESK STUDY (OFF-SITE HIGHWAYS)
- ES APPENDIX 9.3 - COAL MINING RISK ASSESSMENT AND COAL RECOVERY REPORT (ON-SITE)
- ES APPENDIX 9.5 - FACTUAL REPORT
- DRAINAGE & FLOOD RISK STATEMENT - TRANCHES 2, 3 AND 4
- DRAINAGE & FLOOD RISK STATEMENT
- DESK-BASED ASSESSMENT
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- ENERGY STATEMENT REPORT
- STAGE 1 AND 2 AIA HIGHWAYS WORKS
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Wakefield for determination, against a statutory target of eight weeks. Over the last year Wakefield's median decision took 63 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Wakefield's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
The Bungalow Castlegate Stanley Wakefield West Yorkshire WF3 4BX
Demolition of sun lounge and erection of single storey extension to side
Granted Full applications Extension Demolition 5 docsSmall domestic -
6-18 Moorhouse Grove (land Opp) Stanley Wakefield WF3 4BB
Replacement community building
Granted Full applications 8 docs