Planning application
Parcel 7 (Phase 2) Land Off Neil Fox Way City Fields Wakefield
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of Conditions 9 (Remediation Strategy), 10 (Gas and Radon Protection), 12 (Temporary Surface Water Drainage) and 18 (Levels) from approved application 22/02324/FUL
As published by the council, reference 22/02324/SUB03
Application record
- Reference
- 22/02324/SUB03
- Status
- Awaiting decision
- Received
- 21 Apr 2026
- Validated
- 2 Jun 2026
- Ward
- Wakefield South
Site history
Applications at this address on the Wakefield register
This site has had 5 applications since 2025: 1 approved, 0 refused.
-
22/02324/NMC01 Decided
Parcel 7 (Phase 2) Land Off Neil Fox Way City Fields Wakefield
Non-material amendment to approved application 22/02324/FUL dated 19.10.2023 (Full planning application for 250 residential units (C3), associated car parking, garages; vehicular, pedestrian and cycle access and infrastructure; foul and surface water drainage infrastructure; public open space and landscape and biodiversity enhancements; substation and pumping station; with vehicular access from Neil Fox Way) to vary condition 24 (renewables) to align with updated regulations and policy.
-
22/02324/SUB02 Awaiting decision
Parcel 7 (Phase 2) Land Off Neil Fox Way City Fields Wakefield
Discharge of Conditions 4 (Control of Construction Noise), 5 (Construction Environmental Management Plan - Dust), 7 (Construction Method Statement), 15 (Landscape and Ecological Management Plan) and 17 (Arboricultural Method and Tree Protection) from approved application 22/02324/FUL
-
22/02324/SUB01 Granted
Parcel 7 (Phase 2) Land Off Neil Fox Way City Fields Wakefield
Discharge of Condition 23 (Archaeology) from approved application 22/02324/FUL
-
25/00715/FUL Awaiting decision
Parcel 7 (Phase 2) Land Off Neil Fox Way City Fields Wakefield
Full planning application for residential development, landscaping, and public open space with associated vehicular, pedestrian and cycle access and infrastructure works
Timeline
Dates from the published record
-
21 Apr 2026
Received by Wakefield
-
2 Jun 2026
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 28 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Wakefield took a median of 63 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 22/02324/FUL (Decided)
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
- LEVELS STRATEGY
- LAND QUALITY WAKEFIELD COUNCIL
- WAKEFIELD COUNCIL DRAINAGE
- ENGINEERING STRATEGY
- EXTERNAL LEVELS STRATEGY SHEET 1
- EXTERNAL LEVELS STRATEGY SHEET 2
- EXTERNAL LEVELS STRATEGY SHEET 3
- SURFACE WATER EXCEEDANCE
- EXISTING SURFACE WATER FLOODING
- GAS RISK ASSESSMENT
- REMEDIATION STRATEGY
- VIBRATION ASSESMENT
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Wakefield for determination, against a statutory target of eight weeks. Over the last year Wakefield's median decision took 63 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Wakefield's portal will say. Our guide explains the common types.