Planning application
Larnog Solar Farm, Sully
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Environmental Impact Assessment Scoping request for the construction, operation and decommissioning of a solar farm and associated infrastructure including substation and a Battery Energy Storage System (BESS)
As published by the council, reference 2026/00533/SC2
Application record
- Reference
- 2026/00533/SC2
- Type
- EIA Scoping Opinion
- Status
- Awaiting Consultation Responses
- Received
- 23 Jun 2026
- Validated
- 1 Jul 2026
- Ward
- Sully
- Parish
- Sully Community Council
- Decision by
- Delegated
Site history
Applications at this address on the Vale of Glamorgan register
This site has had 2 applications since 2025.
-
2025/01286/SC1 Decided
Larnog Solar Farm, Sully
Construction, operation and decommissioning of a solar farm, with an installed capacity of up to 35 Mega-Watts (MW), and associated infrastructure, including a substation and Battery Energy Storage System (BESS)
Timeline
Dates from the published record
-
23 Jun 2026
Received by Vale of Glamorgan
-
1 Jul 2026
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 26 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Vale of Glamorgan took a median of 63 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
24 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Vale of Glamorgan for determination, against a statutory target of eight weeks. Over the last year Vale of Glamorgan decided outline applications in a median of 28 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Other outline applications
In Vale of Glamorgan
-
2026/00030/OBS Decided
TBD UK Ltd, Brocastle Avenue, Waterton, Bridgend. CF31 3US
Proposed extension to existing building and ancillary amended site access arrangements
-
2024/01145/SC1 Decided
Old Wallace Farm, Dyffryn, Cardiff
Proposed battery energy storage system and associated infrastructure
-
2024/01149/OUT Awaiting decision
Bryn Tynel, Leckwith Road, LLandough
Erection of a detached three bedroom residential dwelling, detached garage and container office, with means of access only to be considered at this stage
-
2019/01266/OBS Granted
St. Marys Church, Cowbridge
Proposed overhead line works
-
2019/01198/SC2 Decided
Land at Leckwith Quays, Leckwith Road
Request for a formal opinion on the scope of an Environmental Statement (ES) to be submitted in conjunction with a hybrid planning application for residential development (to be submitted in Outline), associated highway and bridge improvement works (to be submitted in Full)