Planning application

Bro Tathan West, St Athan, Barry

Granted Vale of Glamorgan 2025/01119/PND Prior Notification Demolition

Works: Demolition

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

The proposed scope of works involves the systematic soft strip, demolition and removal of structural foundations and ground-bearing slabs associated with nine buildings located within the Bro Tathan West development zone. This includes five landside structures and four airside structures, each varying in scale and operational history. With the aim of the project being to create developable land to prospective occupiers of the site.

As published by the council, reference 2025/01119/PND

Application record

Reference
2025/01119/PND
Type
Prior Notification Demolition
Status
Application DETERMINED
Decision
Further prior approval (PNA/PND/PNT/PNQ)
Received
7 Nov 2025
Validated
7 Nov 2025
Decided
3 Dec 2025
Ward
Llantwit Major
Parish
Llantwit Major Town Council
Decision by
Delegated

Site history

Applications at this address on the Vale of Glamorgan register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • 2025/01119/1/CD Granted

    Bro Tathan West, St Athan, Barry

    Details of the method of demolition pursuant to prior notification ref 2025/01119/PND - The proposed scope of works involves the systematic soft strip, demolition and removal of structural foundations and ground-bearing slabs associated with nine buildings located within the Bro Tathan West development zone. This includes five landside structures and four airside structures, each varying in scale and operational history. With the aim of the project being to create developable land to prospective occupiers of the site.

    Decided 27 Jan 2026 Conditions

Timeline

Dates from the published record

  1. 7 Nov 2025

    Received by Vale of Glamorgan

  2. 3 Dec 2025

    Decision issued: Further prior approval (PNA/PND/PNT/PNQ)

  3. 28 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 2025/01119/1/CD Granted

    Bro Tathan West, St Athan, Barry

    Details of the method of demolition pursuant to prior notification ref 2025/01119/PND - The proposed scope of works involves the systematic soft strip, demolition and removal of structural foundations and ground-bearing slabs associated with nine buildings located within the Bro Tathan West development zone. This includes five landside structures and four airside structures, each varying in scale and operational history. With the aim of the project being to create developable land to prospective occupiers of the site.

    Decided 27 Jan 2026 Conditions

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Vale of Glamorgan granted permission on 3 December 2025, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

In Vale of Glamorgan

  • 2024/01107/PNA Granted

    Penycae Farm,Lane From Penycae Farm To Horseshoe Inn, Marcross

    Demolition of existing agricultural buildings which are unsafe and have been damaged by recent storms and erect a steel portal frame agricultural shed, with Grey cement fiber roof with roof lights, brown wooden York board sides and grey formed concrete walls, and grey steel door. On the exact footprint of the previous sheds.

    25 Nov 2024 Prior approval
  • 2024/01150/PND Granted

    Stonehouse Building, Viaduct Road, Barry

    The building is in a state of disrepair with damaged asbestos panels creating a hazard in the building.

    4 Dec 2024 Prior approval
  • 2024/01007/PND Granted

    Vale Car Sales, Leckwith Road, Llandough

    To enable future housing development.

    25 Oct 2024 Prior approval
  • 2023/00356/PNA Granted

    Land off the Red Lane, Pop Hill, Cros Common, Dinas Powys

    Proposed new agricultural building

    31 Mar 2023 Prior approval
  • 2023/00355/PNA Granted

    Land off The Red Lane, Pop Hill, Cross Common, Dinas Powys

    Proposed new agricultural roadway

    31 Mar 2023 Prior approval