Planning application
Stonehouse Building, Viaduct Road, Barry
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
The building is in a state of disrepair with damaged asbestos panels creating a hazard in the building.
As published by the council, reference 2024/01150/PND
Application record
- Reference
- 2024/01150/PND
- Type
- Prior Notification Demolition
- Status
- Application DETERMINED
- Decision
- Approved
- Received
- 4 Dec 2024
- Validated
- 3 Dec 2024
- Decided
- 17 Dec 2024
- Ward
- Castleland
- Parish
- Barry Town Council
- Decision by
- Delegated
Timeline
Dates from the published record
-
3 Dec 2024
Validated
Checked as complete and ready for consideration.
-
4 Dec 2024
Received by Vale of Glamorgan
-
17 Dec 2024
Decision issued: Approved
-
24 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Vale of Glamorgan granted permission on 17 December 2024, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Barry Coal Hoist Site, Land West of Woodham Road, Barry
Level raise on Coal Hoist site to mitigate the flood risk and enable landscaping/ future development. Intend to use structural fill material to raise the levels on this site
Withdrawn Full applications 11 docs -
Land at Docks Office, Subway Road, Barry
Discharge of Condition 3 (Details/Additional Details). Planning permission ref: 2022/00278/RG3 - Transport interchange to integrate bus and rail travel. The transport interchange will utilise the existing council ground level car park area to the east of the Docks offices, creating a circulatory route for buses and taxis, with a central landscaped area with seating, cycle stands and allowing for potential cycle hub / cafe unit and 'Next-bikes' in the future (this would be a separate planning application). The scheme will also have secure cycle lockers and future proof for electric vehicle charging of both buses and taxis. New bus shelters with interactive displays, and new LED lighting to current standards will also be installed
Granted Conditions 4 docs -
East quay, Barry Waterfront, Barry
Non Material Amendment - An amendment to the wording of Condition 3 ( External Material Details) for planning ref 2021/01294/RES - Residential development for 58 units, together with single retail unit and all associated engineering works
Granted Amendments New dwelling 5 docsMajor scheme
Other prior approval applications
In Vale of Glamorgan
-
2024/01107/PNA Granted
Penycae Farm,Lane From Penycae Farm To Horseshoe Inn, Marcross
Demolition of existing agricultural buildings which are unsafe and have been damaged by recent storms and erect a steel portal frame agricultural shed, with Grey cement fiber roof with roof lights, brown wooden York board sides and grey formed concrete walls, and grey steel door. On the exact footprint of the previous sheds.
-
2024/01007/PND Granted
Vale Car Sales, Leckwith Road, Llandough
To enable future housing development.
-
2023/00356/PNA Granted
Land off the Red Lane, Pop Hill, Cros Common, Dinas Powys
Proposed new agricultural building
-
2023/00355/PNA Granted
Land off The Red Lane, Pop Hill, Cross Common, Dinas Powys
Proposed new agricultural roadway
-
2023/00419/PNE Granted
Cowbridge, 33/11KV Substation, North Road, Cowbridge
Proposed new 11kv switchroom building; 33/11kv transformer & associated outdoor electrical equipment. Subsequent removal of existing 33/11kv transformer & associated outdoor electrical equipment & switchroom.