Planning application
Land Located Between Thaxted Substation And The Cutlers Solar Farm Site Cutlers Green Lane Thaxted Essex
Relates to UTT/21/1833/FUL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Application for the discharge of condition 6 (Skylarks) of UTT/21/1833/FUL. Condition came from appeal ref: APP/C1570/W/23/3319421
As published by the council, reference UTT/26/2794/DOC
Application record
- Reference
- UTT/26/2794/DOC
- Category
- Conditions
- Status
- Awaiting decision
- Received
- 4 Nov 2026
- Validated
- 4 Nov 2026
Site history
Applications at this address on the Uttlesford register
This site has had 2 applications since 2025: 1 approved, 0 refused.
-
UTT/25/2426/FUL Granted
Land Located Between Thaxted Substation And The Cutlers Solar Farm Site Cutlers Green Lane Thaxted Essex
The installation and operation of an underground high voltage electrical cable and associated works required to connect Cutlers Solar Farm to the electricity grid.
Timeline
Dates from the published record
-
4 Nov 2026
Received by Uttlesford
-
4 Nov 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 30 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Uttlesford took a median of 53 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
UTT/21/1833/FUL Refused
Land West Of Thaxted Cutlers Green Lane Thaxted Essex
Construction and operation of a solar farm comprising ground mounted solar photovoltaic (PV) arrays and battery storage together with associated development, including inverter cabins, DNO substation, customer switchgear, access, fencing, CCTV cameras and landscaping.
What happens while it is decided
This application is with Uttlesford for determination, against a statutory target of eight weeks. Over the last year Uttlesford decided condition discharge and variation applications in a median of 49 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In Uttlesford
-
UTT/26/2781/DOC Awaiting decision
School House Chelmsford Road Barnston Essex CM6 3NX
Application for the discharge of Condition 4 (Biodiversity Measures Strategy) attached to planning permission UTT/26/1986/FUL.
-
UTT/26/2780/DOC Awaiting decision
Industrial Complex Hollow Road Felsted Dunmow Essex CM6 3JF
Application to dicharge conditions 3 (Construction Environmental Management Plan) 5 (Biodiversity Enhancement Strategy) 6 (Lighting) 9 (External Materials) 13 (Desk Study) attached to UTT/25/2602/FUL
-
UTT/26/2758/DOC Awaiting decision
Toad Hall Chapel End Broxted Essex CM6 2BW
Application to discharge condition 4 (Hard and Soft Landscaping) attached to UTT/25/1970/FUL
-
UTT/26/2743/DOC Awaiting decision
Serena Chelmsford Road Hatfield Heath Essex CM22 7BD
Application to discharge conditions 3 (external finishes) 4 (construction environmental management plan), 6 (construction environmental management plan Biodiversity) 14 (measure of renewable energy) attached to UTT/25/0959/FUL
-
UTT/26/2734/DOC Awaiting decision
Watchouse Green, Oak House Braintree Road Felsted Essex CM6 3JX
Application to discharge of condition 3 (Biodiversity Enhancement Plan), condition 5 (Landscaping Plan), condition 10 (Lighting Design), and condition 13 (Lighting Design) of UTT/26/0884/FUL.