Planning application
Power Station 132 Manchester Road Carrington M31 4AY
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of a 1,040 MW Battery Energy Storage System (BESS) facility comprising: containerised battery units with transformer units and inverter cabinets; internal access tracks; electrical substation compounds including transformers and associated switchgear equipment; infrared CCTV fixed on poles; perimeter fencing; underground surface water drainage infrastructure; vehicular parking area; and site welfare facilities.
As published by the council, reference 110320/FUL/23
Application record
- Reference
- 110320/FUL/23
- Type
- Full Application
- Status
- Decided
- Decision
- Granted As published: Approve with Conditions
- Received
- 17 Feb 2023
- Validated
- 23 Feb 2023
- Decided
- 20 Jul 2023
- Ward
- Bucklow St Martins
- Parish
- Carrington Parish Council
- Decision by
- Delegated Decision
- Postcode
- M31 4AY
Site history
Applications at this address on the Trafford register
This site has had 4 applications since 2018: 2 approved, 0 refused.
-
110808/EIASCR/23 Decided
Power Station 132 Manchester Road Carrington M31 4AY
Request for a screening opinion in respect of a new hydrogen pipeline to connect in to the Trafford Green Hydrogen Project
-
110428/NMA/23 Granted
Power Station 132 Manchester Road Carrington M31 4AY
Application for non-material amendment to planning permission 105316/HYB/21 to increase in capacity of Phase 1 (full permission) from 10MW to 15MW.
-
95496/EIASCR/18 Decided
Power Station 132 Manchester Road Carrington M31 4AY
Request for a Screening Opinion under Regulation 5 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the proposed installation of a gas peaking plant.
Timeline
Dates from the published record
-
17 Feb 2023
Received by Trafford
-
23 Feb 2023
Validated
Checked as complete and ready for consideration.
-
20 Jul 2023
Decision issued: Approve with Conditions
-
21 Nov 2026
Added to PlanIndex
Documents
49 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Trafford granted permission on 20 July 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Power Station 132 Manchester Road Carrington M31 4AY
Application for non-material amendment to planning permission 105316/HYB/21 to increase in capacity of Phase 1 (full permission) from 10MW to 15MW.
Granted Amendments 5 docs -
Power Station 132 Manchester Road Carrington Manchester M31 4AY
Application for non-material amendment (114439/FUL/24) to allow for extended hours of construction work to be undertaken between 30th August 2026 and 7th September 2026.
Granted Amendments 4 docs -
Power Station 132 Manchester Road Carrington Manchester M31 4AY
Application for non-material amendment to planning permission 114439/FUL/24. To alter the wording of Condition 7 to allow for updated surface water drainage layout; and to connect to the mains sewage.
Granted Amendments 7 docs -
Power Station 132 Manchester Road Carrington Manchester M31 4AY
92% historically approved · decision due ~7 Jan
Application for non material amendment to planning permission 114439/FUL/24 to allow for hours of construction work to be undertaken between 6th November 2026 and 6th February 2027.
Awaiting decision Amendments 1 doc -
Power Station 132 Manchester Road Carrington M31 4AY
Request for a screening opinion in respect of a new hydrogen pipeline to connect in to the Trafford Green Hydrogen Project
Decided Outline -
Power Station 132 Manchester Road Carrington Manchester M31 4AY
94% historically approved · decision due ~22 Dec
Application for approval of details reserved by conditions of grant of planning permission 116280/VAR/25. Condition numbers: 19 (colour/materials), 20 (landscaping), 22 (landscape maintenance), 23 (external lighting) and 24 (CCTV).
Awaiting decision Conditions 11 docs
Other full applications
In Trafford
-
120113/FUL/26 Granted
Lookers House 3 Etchells Road Altrincham WA14 5PQ
Elevational improvements including replacement and insertion of new windows/spandrels and partial removal of external stairs, installation of 11 no. mini-dormer windows and partial infilling of existing plantwell to provide additional floor area for two bedspaces and amenity space
-
118668/FUL/26 Granted
Welsh Presbyterian Church Willow Tree Road Altrincham WA14 2EG
Conversion of a vacant chapel into a 3 bedroomed dwelling with associated external alterations and landscaping.
-
119150/FUL/26 Granted
Brackenhurst And Marmion House 17 And 19 Rappax Road Hale Barns Altrincham WA15 0NT
Demolition of Marmion House and of the existing garage to Brackenhurst. Erection of single storey side and rear extensions and 2no single storey garages. External alterations to include new/replacement windows and doors, and extensive landscaping works including erection of a padel court and pergolas.
-
120023/FUL/26 Granted
Altrincham Boys Grammar School Marlborough Road Bowdon Altrincham WA14 2RW
Erection of acoustic fence.
-
120408/FUL/26 Awaiting decision
Britannia Ashley Hotel Ashley Road Hale Altrincham WA15 9SF
External refurbishment works to existing hotel including replacement windows, external doors and curtain walling, new feature cladding and renewal of existing canopies and fascias