Skip to content
PlanIndex Get alerts
Menu

Planning application

Pavement Outside 271-275 Bethnal Green Road, London, E2

Awaiting decision Tower Hamlets PA/26/01627/NC

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

The installation of one JOLT Unit (Electric Vehicle Charge Point, with integral double-sided LCD ...

As published by the council, reference PA/26/01627/NC

Application record

Reference
PA/26/01627/NC
Status
Registered
Validated
22 Sep 2026
Ward
Weavers
Decision by
Delegated

Site history

Applications at this address on the Tower Hamlets register

This site has had 2 applications since 2026.

  • PA/26/01628/NC Awaiting decision

    Pavement Outside 271-275 Bethnal Green Road, London E2

    Proposed double sided digital LCD screen on Electric Vehicle Charging Unit.

    Submitted 22 Sep 2026

Timeline

Dates from the published record

  1. 22 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  2. 6 Oct 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 17 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Tower Hamlets took a median of 56 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

  • INCLUDING DESIGN AND ACCESS STATEMENT Planning Statement · 01 Oct 2026
  • TECHNICAL SPECIFICATIONS - EVA 2.0 Correspondence · 23 Sep 2026
  • RB1000 CABINET GA Current Plan · 23 Sep 2026
  • EVA 2.0 - PRELIM UK DESIGN Current Plan · 23 Sep 2026
  • BIODIVERSITY METRIC CALCULATION Correspondence · 23 Sep 2026
  • JOLT EVA 2.0 EV CHARGING STATION DIMENSION SPECIFICATIONS Current Plan · 23 Sep 2026
  • EXISTING SITE LAYOUT Current Plan · 23 Sep 2026
  • PROPOSED SITE LAYOUT Current Plan · 23 Sep 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Tower Hamlets for determination, against a statutory target of eight weeks. Over the last year Tower Hamlets's median decision took 56 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Tower Hamlets's portal will say. Our guide explains the common types.