Planning application
Southern Grove Lodge, 60 Southern Grove, London, E3 4PN
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of the existing office building and erection of a six-storey building to provide residential dwellings, together with the conversion of Southern Grove Lodge to residential use (Use Class C3), including associated works comprising the provision of amenity and play space, parking, cycle storage, servicing and landscaping
As published by the council, reference PA/26/01446/A1
Application record
- Reference
- PA/26/01446/A1
- Type
- Full Planning Permission
- Status
- Registered
- Received
- 17 Aug 2026
- Validated
- 17 Aug 2026
- Ward
- Mile End
- Decision by
- Delegated
- Postcode
- E3 4PN
Timeline
Dates from the published record
-
17 Aug 2026
Received by Tower Hamlets
-
28 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 12 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Tower Hamlets took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Sphere25 LLP Agent, registered in Waterbeach
Active · incorporated 2018 · Waterbeach
163 applications on PlanIndex · across 21 councils · 99% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
162 documents on file for this application
- INCLUDING TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
- VUCITY MODEL INFORMATION
- EQUALITY IMPACT ASSESSMENT INITIAL SCREENING TOOL
- INCLUDING AFFORDABLE HOUSING STATEMENT AND DRAFT PLANNING OBLIGATIONS STATEMENT
- PART 2
- PART 1
- FIRE SAFETY STRATEGY
- TREE SURVEY
- CONSTRUCTION MANAGEMENT PLAN
- STATEMENT OF COMMUNITY INVOLVEMENT
- CEMP APPENDICES
- CIRCULAR ECONOMY STATEMENT
- ARCHAEOLOGICAL DESK-BASED ASSESSMENT
- SOUTHERN GROVE SCHEDULE OF ACCOMMODATION
- SCHEDULE OF ACCOMMODATION
- OPERATIONAL WASTE MANAGEMENT STRATEGY
- LANDSCAPE MANAGEMENT SCHEDULE
- LANDSCAPE SECTIONS
- ROOF LANDSCAPE GA
- GROUND FLOOR LANDSCAPE GA
- PART 8
- PART 7
- PART 6
- PART 5
- PART 3
- PART 4
- PART 1
- PART 2
- SOUTHERN GROVE BNG METRIC
- EXISTING SITE LOCATION PLAN
- EXISTING SITE PLAN
- DEMOLITION PLAN
- PROPOSED SITE PLAN - ROOFPL01149206600000.PDF
- PROPOSED SITE PLAN - GROUND FLOOR
- BLOCK A GA ELEVATIONS SOUTH AND WEST
- BLOCK A GA ELEVATIONS NORTH AND EAST
- BLOCK A UNIT PLAN - 2B4P-A
- BLOCK A UNIT PLAN - 2B3P- WCH-A
- BLOCK A UNIT PLAN - 3B5P-M-A
- BLOCK A UNIT PLAN - 3B5P-B
- BLOCK A GA PLAN - ROOF
- BLOCK A GA SECTIONS
- BLOCK A UNIT PLAN - 4B8P-A
- BLOCK A UNIT PLAN - 4B7P-M-A
- BLOCK A GA PLAN - FOURTH FLOOR
- BLOCK A UNIT PLAN - 4B7P-A
- BLOCK A GA PLAN - FIFTH FLOOR
- BLOCK A GA PLAN - THIRD FLOOR
- BLOCK A UNIT PLAN - 3B5P- WCH-A
- BLOCK A GA PLAN - SECOND FLOOR
- BLOCK A GA PLAN - FIRST FLOOR
- BLOCK A GA PLAN - GROUND FLOOR
- BAY STUDY SECTION AA
- BAY STUDY SECTION BB
- BAY STUDY SECTION CC
- COMBINED REPORT 1B2PF (LEVEL 0) BE GREEN
- COMBINED REPORT 1B2PF (LEVEL 0) BE LEAN
- COMBINED REPORT 1B2PF (LEVEL 3) BE LEAN
- COMBINED REPORT 1B2PF (LEVEL 5) BE GREEN
- COMBINED REPORT 1B2PF (LEVEL 3 )BE GREEN
- COMBINED REPORT 2B3PF WCH (LEVEL 3) BE GREEN
- COMBINED REPORT 2B4PF (LEVEL 3) BE GREEN
- COMBINED REPORT 1B2PF (LEVEL 5) BE LEAN
- COMBINED REPORT 2B3PF WCH (LEVEL 3) BE LEAN
- COMBINED REPORT 2B4PF (LEVEL 3) BE LEAN
- COMBINED REPORT 3B5PF (LEVEL 3) BE GREEN
- COMBINED REPORT 3B5PF (LEVEL 0) BE GREEN
- COMBINED REPORT 3B5PF (LEVEL 0) BE LEAN
- COMBINED REPORT 3B5PF (LEVEL 5) BE LEAN
- COMBINED REPORT 3B5PF (LEVEL 5) BE GREEN
- COMBINED REPORT 3B5PF (LEVEL 3) BE LEAN
- COMBINED REPORT 3B5PF WCH (LEVEL 3) BE LEAN
- COMBINED REPORT 3B5PF WCH (LEVEL 3) BE GREEN
- COMBINED REPORT 3B5PM (LEVELS 0-1) BE GREEN
- COMBINED REPORT 3B5PM (LEVELS 2-3) BE GREEN
- COMBINED REPORT 3B5PM (LEVELS 0-1) BE LEAN
- COMBINED REPORT 3B5PM (LEVELS 2-3) BE LEAN
- COMBINED REPORT 3B5PM (LEVELS 4-5) BE LEAN
- COMBINED REPORT 3B5PM (LEVELS 4-5) BE GREEN
- COMBINED REPORT 4B7PF (LEVEL 3) BE GREEN
- COMBINED REPORT 4B7PF (LEVEL 3) BE LEAN
- COMBINED REPORT 4B7PM (LEVELS 4-5) BE LEAN
- COMBINED REPORT 4B7PM (LEVELS 4-5) BE GREEN F
- BLOCK B GA PLAN - FIRST FLOOR
- BLOCK B GA PLAN - SECOND FLOOR
- BLOCK B UNIT PLAN 2B4P-M-A
- BLOCK B UNIT PLAN 1B2P-A
- BLOCK B UNIT PLAN 2B4P-B
- BLOCK B UNIT PLAN 1B1P-B
- BLOCK B EXISTING BUILDING PLAN - FIRST FLOOR
- BLOCK B UNIT PLAN 2B4P-C
- BLOCK B UNIT PLAN 2B3P-M-B
- BLOCK B UNIT PLAN 1B1P-A
- BLOCK B UNIT PLAN 2B4P-A
- BLOCK B EXISTING BUILDING PLAN - GROUND FLOOR
- BLOCK B GA ELEVATIONS - SOUTH & WEST
- BLOCK B UNIT PLAN 2B3P-M-A
- BLOCK B GA PLAN - GROUND FLOOR
- BLOCK B UNIT PLAN 2B3P-B
- BLOCK B UNIT PLAN 2B3P-A
- BLOCK B GA SECTIONS
- BLOCK B GA ELEVATIONS - NORTH & EAST
- BLOCK B UNIT PLAN 1B2P-M-B
- BLOCK B GA PLAN - BASEMENT PLAN
- BLOCK B UNIT PLAN 1B2P-M-A
- EXISTING BUILDING ELEVATIONS - NORTH & EAST
- BLOCK B EXISTING BUILDING PLAN - SECOND FLOOR
- BLOCK B UNIT PLAN 1B2P- BPL01
- BLOCK B UNIT PLAN 1B2P-C
- BLOCK B EXISTING BUILDING PLAN - ROOF
- BLOCK B EXISTING BUILDING PLAN - BASEMENT
- BLOCK B UNIT PLAN 3B5P-A
- BLOCK B UNIT PLAN 1B2P-D
- BLOCK B UNIT PLAN 1B2P-E
- BLOCK B UNIT PLAN 3B5P-M-A
- EXISTING BUILDING ELEVATIONS - SOUTH & WEST
- BLOCK B GA PLAN - ROOF
- BLOCK B UNIT PLAN 3B4P-A
- PRELIMINARY RISK ASSESSMENT - PART 4
- PRELIMINARY RISK ASSESSMENT - PART 3
- PRELIMINARY RISK ASSESSMENT - PART 5
- PRELIMINARY RISK ASSESSMENT - PART 2
- PRELIMINARY RISK ASSESSMENT - PART 1
- PRELIMINARY RISK ASSESSMENT - PART 7
- PRELIMINARY RISK ASSESSMENT - PART 9
- PRELIMINARY RISK ASSESSMENT - PART 6
- PRELIMINARY RISK ASSESSMENT - PART 8
- SOUTHERN GROVE FOURTH FLOOR
- RAPID HEALTH IMPACT ASSESSMENT MATRIX (SELF-COMPLETION FORM)
- SOUTHERN GROVE SECOND FLOOR
- SOUTHERN GROVE FIRST FLOOR
- SOUTHERN GROVE THIRD FLOOR
- SOUTHERN GROVE GROUND FLOOR
- EXISTING ELEVATIONS SHEET 1 OF 6
- EXISTING ELEVATIONS SHEET 2 OF 6
- RESIDENTIAL TRAVEL PLAN
- TRANSPORT ASSESSMENT
- AIR QUALITY AND AIR QUALITY NEUTRAL ASSESSMENT
- DETAILED RISK ASSESSMENT FOR POTENTIAL UXO CONTAMINATION
- PRELIMINARY ECOLOGICAL APPRAISAL LETTER DATED: 26 JUNE 2026
- DRAINAGE STRATEGY
- FOUL SEWAGE AND UTILITIES
- ENERGY ASSESSMENT
- OVERHEATING ASSESSMENT
- COVER LETTER DATED: 14 AUG 2026
- NOISE IMPACT ASSESSMENT REPORT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Tower Hamlets for determination, against a statutory target of eight weeks. Over the last year Tower Hamlets decided full applications in a median of 56 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
60 Southern Grove, London, E3 4PN
Removal of self-seeded sycamore trees, buddleia and elder shrubs growing within areas of tipped w...
Granted Trees 2 docs -
60 Brokesley Street, London, E3 4QJ
Works to 1 x Winter flowering Cherry tree in rear garden include pruning.
Granted Trees -
74 Brokesley Street, London, E3 4QJ
T1 Ash (Fraxinus excelsior) Carry out a crown reduction of approximately 25%, reducing the overal...
Granted Trees -
Tracy House, Mile End Road, London E3 4TY
Works to x3 Whitebeam Trees - Re-pollard 1-1.5m
Granted Trees 3 docs -
BT Street Hub, Pavement Outside 588 Mile End Road, London E3 4PH
Two digital 75-inch LCD display screens, one on each side of the Street Hub unit.
Refused Advertising 14 docs -
BT Street Hub, Pavement Outside 588 Mile End Road, London E3 4PH
The proposed deployment of a Street Hub 3 unit
Refused Full applications 14 docsSeveral homes
Other full applications
In Tower Hamlets
-
PA/26/00916/NC Granted
2 Athelstane Grove, London, E3 5JG
Conversion of existing butterfly roof with front and back mansard to utilise the loft area as habitable space.
-
PA/26/01372/NC Awaiting decision
Anglesey House, Lindfield Street, London E14 6HS
Proposal for the installation of a new flat roof covering, including the removal of the existing curved metal profile roof and supporting framework, demolition of the existing gable walls, installation of a warm deck flat roof over the original concrete roof slab, and provision of an edge protection system to facilitate safe roof access for maintenance.
-
PA/26/01504/NC Awaiting decision
412 Hackney Road, London, E2 7AP
Proposed for a new side extension, alterations to the existing side extension, installation of a new glazed screen and rooflight, and alterations to the street-facing façade.
-
PA/26/01517/NC Awaiting decision
11 Lyal Road, London, E3 5QG
Proposed single-storey rear infill side extension
-
PA/26/00497/NC Decided
72 Cambridge Heath Road, London, E1 5QJ
The change of use of the ground floor premises at 72 Cambridge Heath Road, London E1 5QJ from Use Class E (Commercial, Business and Service) to Sui Generis (Laundrette) including external flue.