Planning application
Our Lady Of The Assumption R C Church and Assumption Priory, Victoria Park Square, London, E2 9PB
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Observation requested by Diocese of Westminster Churches Committee for works are required to address urgent maintenance and material failure issues affecting six asphalt flat roof and parapet areas. Roof Inspections have found areas where significant leaks are occurring. Works are necessary to fully repair and recondition the roofs to a fully watertight state of repair. The proposed works are to undertake like-for-like repairs and replacements, while ensuring the roof's ongoing weatherproof performance. The proposed works are intended to have no impact upon the architectural visuals of the building and are not visible from the street level. On completion the internal decoration of the church will be made good.
As published by the council, reference PA/26/01206
Application record
- Reference
- PA/26/01206
- Type
- Observations to Other Authorities
- Status
- Decided
- Decision
- No Objection (Observations Applications)
- Received
- 9 Jul 2026
- Validated
- 9 Jul 2026
- Decided
- 29 Jul 2026
- Ward
- Bethnal Green East
- Decision by
- Delegated
- Postcode
- E2 9PB
Site history
Applications at this address on the Tower Hamlets register
This site has had 4 applications since 2026: 4 approved, 0 refused.
-
PA/26/01206/NC Granted
Our Lady Of The Assumption R C Church and Assumption Priory, Victoria Park Square, London, E2 9PB
Observation requested by Diocese of Westminster Churches Committee for works are required to addr...
-
PA/26/01204/NC Granted
Our Lady Of The Assumption R C Church and Assumption Priory, Victoria Park Square, London, E2 9PB
Observation requested by Diocese of Westminster Churches Committee for the existing boiler equipm...
-
PA/26/01204 Granted
Our Lady Of The Assumption R C Church and Assumption Priory, Victoria Park Square, London, E2 9PB
Observation requested by Diocese of Westminster Churches Committee for the existing boiler equipment is approximately 15 years old. Only 25% of the boilers are currently working, parts are obsolete and no longer available. The boilers provide heating for the Church and it is imperative that the building is heated sufficiently to protect the historic fabric. New smaller boilers, valves, pressurisation unit and finned tube heaters are required to redesign the system. It is expected that efficiency of the system will be 30-40% more efficient and will improve the comfort of the parishioners. It will lower heating costs and environmental impact in line with the Churches Net Zero targets. Limited works are required externally i.e. removing the existing flues in an interior courtyard and replacing with new black powder coated flues. There is limited loss of historic fabric of the Church as a result of the proposals.
Timeline
Dates from the published record
-
9 Jul 2026
Received by Tower Hamlets
-
25 Jul 2026
Added to PlanIndex
-
29 Jul 2026
Decision issued: No Objection (Observations Applications)
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
- DECISION_NOTICE
- CONSULTATION REQUEST FROM ARCHDIOCESE OF WESTMINSTER HISTORIC CHURCHES COMMITTEE
Trade members open them from here.
Open the documentsWhat this grant of permission means
Tower Hamlets granted permission on 29 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Tower Hamlets's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Our Lady Of The Assumption R C Church and Assumption Priory, Victoria Park Square, London, E2 9PB
Observation requested by Diocese of Westminster Churches Committee for the existing boiler equipment is approximately 15 years old. Only 25% of the boilers are currently working, parts are obsolete and no longer available. The boilers provide heating for the Church and it is imperative that the building is heated sufficiently to protect the historic fabric. New smaller boilers, valves, pressurisation unit and finned tube heaters are required to redesign the system. It is expected that efficiency of the system will be 30-40% more efficient and will improve the comfort of the parishioners. It will lower heating costs and environmental impact in line with the Churches Net Zero targets. Limited works are required externally i.e. removing the existing flues in an interior courtyard and replacing with new black powder coated flues. There is limited loss of historic fabric of the Church as a result of the proposals.
Granted 2 docs -
Mulberry House, Victoria Park Square, London, E2 9PQ
91% historically approved · decision due ~10 Nov
Proposed Works: The works are divided into two categories: 1. Window Refurbishment (Majority of ...
Awaiting decision Windows or glazing -
5 The Terrace, Old Ford Road, London, E2 9PH
T1 Plane tree at frontage of Netteswell House: Reduce lateral spread on Eastern face of tree by 3-4m metres from branch tips back to suitable growth points. Remove deadwood and massaria Tree is encroaching adjacent church and needs to be managed.
Granted Trees 3 docs -
4 The Terrace, Old Ford Road, London, E2 9PH
Rear extension alterations, courtyard infill, and internal alterations to the ground floor and basement
Granted Heritage and listed buildings Extension 3 docs -
4 The Terrace, Old Ford Road, London, E2 9PH
Rear extension alterations, courtyard infill, and internal alterations to the ground floor and basement
Granted Full applications Extension 15 docs -
Young V&A (Formerly Museum of Childhood), Cambridge Heath Road, Bethnal Green, London, E2 9PA
Submission of details pursuant to condition no.3b) Samples and details of doors and gates, 3c) Samples and details of roofing and 3d) Samples and details of the electrical enclosure, of Planning Permission ref: PA/25/00146, dated 19/01/2026
Granted Conditions 6 docs