Planning application
Land at Wansbeck Road, Fish Island, London, E3 2NF
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Redevelopment of the site to deliver Purpose Built Shared Living Accommodation (Sui Generis) and affordable housing units (Class C3) with associated public realm improvements comprising hard and soft landscaping and other associated works
As published by the council, reference PA/26/00765/A1
Application record
- Reference
- PA/26/00765/A1
- Type
- Full Planning Permission
- Status
- Registered
- Received
- 13 May 2026
- Validated
- 13 May 2026
- Ward
- Bow East
- Decision by
- Strategic Development Committee
- Postcode
- E3 2NF
Site history
Applications at this address on the Tower Hamlets register
This site has had 3 applications since 2026.
-
PA/26/00069 Decided
Land at Wansbeck Road, Fish Island, London, E3 2NF
Request for Screening Opinion as to whether an Environmental Impact Assessment (EIA) is required in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) (the 'EIA Regulations') for the redevelopment of the site to provide two buildings ranging between 7-10 storeys in height, which will contain a total of approximately 324 new homes (40% of which will be affordable based on habitable room), made up of 44 social rented homes and 280 Co-living studios, together with associated communal spaces and amenity space.
-
PA/26/00069/NC Decided
Land at Wansbeck Road, Fish Island, London, E3 2NF
Request for Screening Opinion as to whether an Environmental Impact Assessment (EIA) is required in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) (the 'EIA Regulations') for the redevelopment of the site to provide two buildings ranging between 7-10 storeys in height, which will contain a total of approximately 324 new homes (40% of which will be affordable based on habitable room), made up of 44 social rented homes and 280 Co-living studios, together with associated communal spaces and amenity space.
Timeline
Dates from the published record
-
13 May 2026
Received by Tower Hamlets
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 8 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Tower Hamlets took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,613 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
111 documents on file for this application
- BNG METRIC
- BNG PLANS
- HTVIA - APPENDICES
- CO-LIVING NEEDS AND DEMAND STUDY
- DAYLIGHT, SUNLIGHT AND OVERSHADOWING REVIEW
- TFL
- GLA STAGE 1 REPORT
- GLA STAGE 1 LETTER
- BLOCK A - LEVEL 00
- BLOCK A - LEVEL 01
- BLOCK A - LEVEL 02-06
- THAMES WATER
- HISTORIC ENGLAND GLAAS
- CANAL & RIVER TRUST
- ENVIRONMENT AGENCY
- NHS
- AFFORDABLE HOMES LAYOUTS
- CO LIVING UNIT LAYOUTS
- WHOLE LIFE CARBON REPORTING SPREADSHEET
- GLA - BE SEEN
- CIRCULAR ECONOMY REPORTING SPREADSHEET
- CARBON EMISSION REPORTING SPREADSHEET
- BUILDING SAFETY REGULATOR
- HISTORIC ENGLAND - 21.05.2026
- LONDON CITY AIRPORT
- NATS
- ENVIRONMENT AGENCY - EXTERNAL CONSULTATION CHECKLIST FOR LPAS
- EA CHECK LIST
- LBTH BNG CHECKLIST
- GROUND LEVEL - LANDSCAPE PLAN
- ROOF LEVEL - LANDSCAPE PLAN
- OUTLINE SITE WASTE MANAGEMENT PLAN
- OPERATIONAL WASTE MANAGEMENT STRATEGY
- PRE-DEMOLITION AUDIT
- PRE-REDEVELOPMENT AUDIT
- WIND MICROCLIMATE
- FINANCIAL VIABILITY ASSESSMENT - APPENDIX ONE - AREA SCHEDULE
- HTVIA - HERITAGE TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
- SITE PLAN
- GLA CARBON EMISSION REPORTING SPREADSHEET
- BRUKL OUTPUT DOC - BE LEAN
- BRUKL OUTPUT DOC - BE CLEAN
- BRUKL OUTPUT DOC - BE GREEN
- GLA - BE SEEN
- OVERHEATING REPORT
- ENERGY STATEMENT
- FOUL SEWAGE AND UTILITIES ASSESSMENT
- BREEAM NEW CONSTRUCTION - PRE- ASSESSMENT REPORT
- SUSTAINABILITY STATEMENT
- WHOLE LIFE CARBON
- CIRCULAR ECONOMY STATEMENT
- HEALTHY STREETS TRANSPORT ASSESSMENT
- HEALTHY STREETS TRANSPORT ASSESSMENT - PROPOSED DEVELOPMENT LAYOUT
- FRAMEWORK TRAVEL PLAN
- PROPOSED COMBINED DRAINAGE PLAN
- PROPOSED SURFACE WATER DRAINAGE PLAN
- PROPOSED FOUL WATER DRAINAGE PLAN
- APPENDICES A - TOPOGRAPHIC AND UTILITIES SURVEY
- APPENDIX D - THAMES WATER CONFIRMATION
- APPENDICES F - TOWER HAMLETS SURFACE WATER MANAGEMENT PLAN EXTRACTS
- AND DRAINAGE STRATEGY
- FIRE STATEMENT
- GATEWAY ONE FIRE STATEMENT
- ARCHAEOLOGICAL DESK BASED ASSESSMENT
- PART 1
- PART 2
- PART 3
- PART 4
- SCHEDULE OF ACCOMMODATION
- SITE LOCATION PLAN
- EXISTING SITE PLAN
- AFFORDABLE HOUSING STATEMENT
- LEVEL 00 PLAN
- LEVEL 01 PLAN
- LEVEL 02 - 06 PLAN
- LEVEL 07 - 08 PLAN
- LEVEL 09 PLAN
- LEVEL 10 PLAN
- BLOCK B - NORTH ELEVATION
- BLOCK B - EAST ELEVATION
- BLOCK B - SOUTH ELEVATION
- BLOCK B - WEST ELEVATION
- BLOCK A - NORTH ELEVATION
- BLOCK A - EAST ELEVATION
- BLOCK A - SOUTH ELEVATION
- BLOCK A - WEST ELEVATION
- SITEWIDE ELEVATIONS
- CO-LIVING SECTION
- C3 RESIDENTIAL SECTION
- ACCESSIBLE UNITS DRAWING
- TENURE PLANS
- PRELIMINARY ECOLOGICAL APPRAISAL REPORT AND BIODIVERSITY IMPACT ASSESSMENT
- STATEMENT OF COMMUNITY INVOLVEMENT
- OPERATOR MANAGEMENT PLAN
- DETAILED HEALTH IMPACT ASSESSMENT
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- EQUALITIES IMPACT ASSESSMENT
- ARBORICULTURAL IMPACT ASSESSMENT
- TREE SURVEY REPORT
- COVERING LETTER DATED: 28 APRIL 2026
- DESK STUDY REVIEW AND GROUND INVESTIGATION
- AIR QUALITY ASSESSMENT
- AIR QUALITY NEUTRAL ASSESSMENT
- GEOARCHAEOLOGICAL DEPOSIT MODEL
- STAGE 2 ACOUSTIC IMPACT ASSESSMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Tower Hamlets for determination, against a statutory target of eight weeks. Over the last year Tower Hamlets decided full applications in a median of 56 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land at Wansbeck Road, Fish Island, London, E3 2NF
Request for Screening Opinion as to whether an Environmental Impact Assessment (EIA) is required in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) (the 'EIA Regulations') for the redevelopment of the site to provide two buildings ranging between 7-10 storeys in height, which will contain a total of approximately 324 new homes (40% of which will be affordable based on habitable room), made up of 44 social rented homes and 280 Co-living studios, together with associated communal spaces and amenity space.
Decided Outline 2 docs -
Land at Wansbeck Road, Fish Island, London, E3 2NF
Request for Screening Opinion as to whether an Environmental Impact Assessment (EIA) is required in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) (the 'EIA Regulations') for the redevelopment of the site to provide two buildings ranging between 7-10 storeys in height, which will contain a total of approximately 324 new homes (40% of which will be affordable based on habitable room), made up of 44 social rented homes and 280 Co-living studios, together with associated communal spaces and amenity space.
Decided Outline 1 doc -
Ducketts Apartments, 1 Wick Lane, London, E3 2NA
92% historically approved · decision due ~17 Aug
Application for non-material amendment of planning permission ref: PA/25/02084, dated 19/05/2026. Non-Material Amendment(s) Sought: Relocation of new replacement cladding and new roof covering to replace existing
Status unknown Amendments Roofing 3 docs -
Ducketts Apartments, 1 Wick Lane, London, E3 2NA
Submission of Details pursuant to Condition 3 (Samples and Full Particulars of All External Facing Materials) Planning Permission PA/25/00715 dated 11/06/2025
Granted Conditions 4 docs -
Block A, 1-7 Dace Road, Fish Island, London, E3 2NP
Application for Certificate of Lawfulness in respect of proposed use Class B8 (Storage)
Granted Outline 14 docs -
Unit 1, Ryan House, 12 Smeed Road, London, E3 2PE
Change of use from Class E(g) to Class E(a) and provision of louvred grille to plant room.
Refused Full applications 13 docs
Other full applications
In Tower Hamlets
-
PA/26/00916/NC Granted
2 Athelstane Grove, London, E3 5JG
Conversion of existing butterfly roof with front and back mansard to utilise the loft area as habitable space.
-
PA/26/01372/NC Awaiting decision
Anglesey House, Lindfield Street, London E14 6HS
Proposal for the installation of a new flat roof covering, including the removal of the existing curved metal profile roof and supporting framework, demolition of the existing gable walls, installation of a warm deck flat roof over the original concrete roof slab, and provision of an edge protection system to facilitate safe roof access for maintenance.
-
PA/26/01504/NC Awaiting decision
412 Hackney Road, London, E2 7AP
Proposed for a new side extension, alterations to the existing side extension, installation of a new glazed screen and rooflight, and alterations to the street-facing façade.
-
PA/26/01517/NC Awaiting decision
11 Lyal Road, London, E3 5QG
Proposed single-storey rear infill side extension
-
PA/26/00497/NC Decided
72 Cambridge Heath Road, London, E1 5QJ
The change of use of the ground floor premises at 72 Cambridge Heath Road, London E1 5QJ from Use Class E (Commercial, Business and Service) to Sui Generis (Laundrette) including external flue.