Skip to content
PlanIndex Get alerts
Menu

Planning application

185 Bow Common Lane, London, E3 4JJ

Awaiting decision Tower Hamlets PA/26/00514/NC Full Planning Permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use of ground floor to provide two residential dwellings (Use Class C3)

As published by the council, reference PA/26/00514/NC

Application record

Reference
PA/26/00514/NC
Type
Full Planning Permission
Status
Registered
Received
15 Apr 2026
Validated
15 Apr 2026
Ward
Mile End
Decision by
Delegated
Postcode
E3 4JJ

Timeline

Dates from the published record

  1. 15 Apr 2026

    Received by Tower Hamlets

  2. 25 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 10 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Tower Hamlets took a median of 56 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Leaside Planning Limited Agent, a planning consultancy registered in London

Active · incorporated 2011 · London

19 applications on PlanIndex · across 3 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

  • PROPOSED NORTH ELEVATION Current Plan · 11 Jun 2026
  • PROPOSED WEST ELEVATION Current Plan · 11 Jun 2026
  • PROPOSED GROUND FLOOR PLAN Current Plan · 11 Jun 2026
  • MARKETING REPORT ADDENDUM ? APRIL 2026 Report · 16 Apr 2026
  • BLOCK PLAN Current Plan · 20 Mar 2026
  • LOCATION PLAN Current Plan · 20 Mar 2026
  • EXISTING NORTH ELEVATION Current Plan · 20 Mar 2026
  • EXISTING SOUTH ELEVATION Current Plan · 20 Mar 2026
  • EXISTING WEST ELEVATION Current Plan · 20 Mar 2026
  • EXISTING EAST ELEVATION Current Plan · 20 Mar 2026
  • EXISTING GROUND FLOOR PLAN Current Plan · 20 Mar 2026
  • PROPOSED EAST ELEVATION Current Plan · 20 Mar 2026
  • PROPOSED SOUTH ELEVATION Current Plan · 20 Mar 2026
  • AND HERITAGE AND IMPACT ASSESSMENT Planning Statement · 20 Mar 2026
  • PHOTOS MARCH 2026 Photo · 20 Mar 2026
  • COVERING LETTER Correspondence · 20 Mar 2026
  • MARKETING REPORT ADDENDUM ? MARCH 2026 Correspondence · 20 Mar 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Tower Hamlets for determination, against a statutory target of eight weeks. Over the last year Tower Hamlets decided full applications in a median of 56 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 36B Ropery Street, London, E3 4QG

    PA/26/00392/NC Submitted 4 Mar 2026 100 yards away

    Single storey rear infill extension

    Granted Full applications Extension 4 docs
    Small domestic
  • 192 Bow Common Lane, London, E3 4HH

    PA/25/01285/A1 Submitted 27 Aug 2025 100 yards away

    Proposed change of use from a single family house into two flats; a one bedroom flat at ground floor level and a two bedroom flat over first and second floor level.

    Refused Full applications New dwelling 11 docs
    Several homes
  • Bonner Mile End Primary School Building 1, 2C Ropery Street, London, E3 4QE

    PA/25/02018/NC Submitted 24 Nov 2025 100 yards away

    The proposed works include: Installation of air-source heat pumps (ASHPs) to Block A; Replacement and upgrading of all existing cast iron radiators and pipework; Adaptation of the storage outbuilding (Block D) to accommodate a new substation to cope with increased electrical demand as a result of decarbonising the heating infrastructure; Enhancement of the school play area; Replacement of all existing single-glazed windows with new heritage-style timber frame, double glazing windows; Replacement of all external timber doors in the same style as existing; Adding further loft insulation to the existing loft space to Block A.

    Granted Heritage and listed buildings Windows or glazing 3 docs
  • Bonner Mile End Primary School Building 1, 2C Ropery Street, London, E3 4QE

    PA/25/02017/NC Submitted 24 Nov 2025 100 yards away

    The proposed works include: Installation of air-source heat pumps (ASHPs) to Block A; Replacement and upgrading of all existing cast iron radiators and pipework; Adaptation of the storage outbuilding (Block D) to accommodate a new substation to cope with increased electrical demand as a result of decarbonising the heating infrastructure; Enhancement of the school play area; Replacement of all existing single-glazed windows with new heritage-style timber frame, double glazing windows; Replacement of all external timber doors in the same style as existing; Adding further loft insulation to the existing loft space to Block A.

    Granted Full applications Windows or glazing 40 docs
  • 15 Ropery Street, London, E3 4QE

    PA/25/01361/S Submitted 22 Aug 2025 100 yards away

    Application for Non-Material amendment to planning permission ref: PA/25/00595, Dated 05/06/2025. Non Material amendment(s) Sought : The previous approved rear wall contained a projecting bay window and a side patio door. The new revision will be just a single large opening containing a sliding folding door.

    Granted Amendments Windows or glazing 4 docs
  • 1 English Street, London, E3 4TA

    PA/25/02221/NC Submitted 9 Jan 2026 150 yards away

    Upwards extension including dormer window and roof light

    Refused Full applications Extension Loft or dormer +1 11 docs

In Tower Hamlets

  • PA/26/00916/NC Granted

    2 Athelstane Grove, London, E3 5JG

    Conversion of existing butterfly roof with front and back mansard to utilise the loft area as habitable space.

    Received 3 Jun, published by the council 25 Jul 2026 Full applications
  • PA/26/01372/NC Awaiting decision

    Anglesey House, Lindfield Street, London E14 6HS

    Proposal for the installation of a new flat roof covering, including the removal of the existing curved metal profile roof and supporting framework, demolition of the existing gable walls, installation of a warm deck flat roof over the original concrete roof slab, and provision of an edge protection system to facilitate safe roof access for maintenance.

    Received 8 Sep, published by the council 9 Sep 2026 Full applications
  • PA/26/01504/NC Awaiting decision

    412 Hackney Road, London, E2 7AP

    Proposed for a new side extension, alterations to the existing side extension, installation of a new glazed screen and rooflight, and alterations to the street-facing façade.

    Received 4 Sep, published by the council 11 Oct 2026 Full applications
  • PA/26/01517/NC Awaiting decision

    11 Lyal Road, London, E3 5QG

    Proposed single-storey rear infill side extension

    Received 4 Sep, published by the council 8 Sep 2026 Full applications
  • PA/26/00497/NC Decided

    72 Cambridge Heath Road, London, E1 5QJ

    The change of use of the ground floor premises at 72 Cambridge Heath Road, London E1 5QJ from Use Class E (Commercial, Business and Service) to Sui Generis (Laundrette) including external flue.

    Received 25 Mar, published by the council 25 Jul 2026 Full applications