Planning application
Calcutta House, London Metropolitan University, Old Castle Street, London, E1 7NT
Works: Extension Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Phased mixed-use redevelopment of the site, involving part-demolition and part-retention, refurbishment, and extension of Calcutta House and the Annex Building, to provide Higher Education floorspace (Use Class F1); the demolition of 130 Whitechapel High Street and 133-137 Whitechapel High Street (excluding retained façade), and the erection of a new building to provide Purpose Built Student Accommodation (Use Class Sui Generis), Retail (Use Class E), and flexible Office / Community floorspace (Use Class E/F2); with landscaping, public realm, and associated ancillary works for each phase [This application is accompanied by an Environmental Statement] Further information provided by the applicant (not forming part of the formal description of development): The development will involve: - Up to 12,530 sqm of Higher Education floorspace (Use Class F1) within the refurbished and extended Calcutta House and Annex buildings, in a building of 6 storeys (+44.88 m AOD) - Up to 27,799 sqm of Purpose Built Student Accommodation floorspace, comprising 794 rooms (Use Class Sui Generis), 102 sqm of flexible Office / Community floorspace (Use Class E/F2) and 220 sqm of Retail floorspace (Use Class E), in a building of 19 storeys (+84.75 m AOD)
As published by the council, reference PA/26/00391/A1
Application record
- Reference
- PA/26/00391/A1
- Type
- Full Planning Permission
- Status
- Registered
- Received
- 19 Mar 2026
- Validated
- 19 Mar 2026
- Ward
- Spitalfields and Banglatown
- Decision by
- Strategic Development Committee
- Postcode
- E1 7NT
Timeline
Dates from the published record
-
19 Mar 2026
Received by Tower Hamlets
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 14 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Tower Hamlets took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Savills Limited Agent, registered in London
Active · incorporated 1987 · London
2,107 applications on PlanIndex · across 183 councils · 93% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordThe Prudential Assurance Company and City of London Corporation Applicant
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
312 documents on file for this application
- INTERIM REVIEW REPORT
- TFL INFRASTRUCTURE PROTECTION
- TFL - DETAILED COMMENTS
- HISTORIC ROYAL PALACES
- LONDON METROPOLITAN UNIVERSITY
- ASSESSMENT REVIEW
- GLA STAGE 1 REPORT
- GLA STAGE 1 LETTER
- ICOMOS NOTES OF COMMENTS
- HISTORIC ENGLAND
- LAMAS
- SAVE BRITAIN?S HERITAGE
- ENVIRONMENTAL NOISE SURVEY
- TECHNICAL NOTE
- HISTORIC ENGLAND - GLAAS
- HISTORIC ENGLAND
- NATURAL ENGLAND
- HSE
- INTERNAL - PART 1
- INTERNAL - PART 2
- INTERNAL - PART 3
- ENVIRONMENT AGENCY
- BNG METRIC
- SPORT ENGLAND
- ACTIVE TRAVEL ENGLAND
- CADENT GAS
- LONDON CITY AIRPORT
- PORT OF LONDON AUTHORITY
- OUTLINE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - PART 1
- STUDENT MANAGEMENT PLAN
- WIND AND MICROCLIMATE ASSESSMENT
- HIGHER EDUCATION BUILDING (ANNEX) PROPOSED GROUND FLOOR PLAN
- HIGHER EDUCATION BUILDING (ANNEX) PROPOSED FIRST FLOOR PLAN
- HIGHER EDUCATION BUILDING (ANNEX) PROPOSED SECOND FLOOR PLAN
- HIGHER EDUCATION BUILDING (ANNEX) PROPOSED THIRD FLOOR PLAN
- FINANCIAL VIABILITY ASSESSMENT - PART 1
- FINANCIAL VIABILITY ASSESSMENT - PART 2
- FINANCIAL VIABILITY ASSESSMENT - PART 3
- FINANCIAL VIABILITY ASSESSMENT - PART 4
- HIGHER EDUCATION BUILDING PROPOSED FOURTH FLOOR PLAN
- HIGHER EDUCATION BUILDING PROPOSED FIFTH FLOOR PLAN
- HIGHER EDUCATION BUILDING PROPOSED SIXTH FLOOR PLAN
- HIGHER EDUCATION BUILDING PROPOSED SEVENTH FLOOR PLAN
- SOCIAL VALUE STRATEGY
- STUDENT MANAGEMENT PLAN
- CALCUTTA HOUSE - PBSA ACCOMMODATION SCHEDULE
- SITE WIDE PROPOSED GROUND FLOOR PLAN
- SITE WIDE PROPOSED BASEMENT FLOOR PLAN
- SITE WIDE PROPOSED ROOF PLAN
- SITE WIDE PROPOSED NORTH FACING ELEVATION
- SITE WIDE PROPOSED EAST FACING ELEVATION
- SITE WIDE PROPOSED SOUTH FACING ELEVATION
- SITE WIDE PROPOSED WEST FACING ELEVATION
- SITE WIDE PROPOSED NORTH AND SOUTH FACING ELEVATION
- SITE WIDE PROPOSED SECTION A-A
- SITE WIDE PROPOSED SECTION B-B
- SITE WIDE PROPOSED SECTION C-C
- SITE WIDE PROPOSED SECTION D-D
- PBSA BUILDING PROPOSED GROUND FLOOR PLAN
- PBSA BUILDING PROPOSED GROUND FLOOR MEZZANINE PLAN
- PBSA BUILDING PROPOSED LEVEL 01
- PBSA BUILDING PROPOSED LEVEL 02
- PBSA BUILDING PROPOSED LEVEL 03
- PBSA BUILDING PROPOSED LEVEL 04
- PBSA BUILDING PROPOSED LEVEL 05
- PBSA BUILDING PROPOSED LEVEL 06
- PBSA BUILDING PROPOSED LEVEL 07
- SITE WIDE EXISTING FOURTH FLOOR PLAN
- SITE WIDE EXISTING FIFTH FLOOR PLAN
- SITE WIDE EXISTING SIXTH FLOOR PLAN
- SITE WIDE EXISTING SEVENTH FLOOR PLAN
- SITE WIDE EXISTING BASEMENT PLAN
- SITE WIDE EXISTING ROOF LEVEL PLAN
- SITE WIDE EXISTING NORTH FACING ELEVATION
- SITE WIDE EXISTING EAST FACING ELEVATION
- SITE WIDE EXISTING SOUTH FACING ELEVATION
- SITE WIDE EXISTING WEST FACING ELEVATION
- SITE WIDE EXISTING SECTION A- A
- SITE WIDE EXISTING SECTION B- B
- SITE WIDE EXISTING SECTION C- C
- SITE WIDE EXISTING SECTION D- D
- ANNEX EXISTING ELEVATIONS E - W
- ANNEX DEMOLITION ELEVATIONS E - W
- ANNEX DEMOLITION ELEVATIONS E - W
- HIGHER EDUCATION EXISTING NORTH FACING ELEVATIONS
- HIGHER EDUCATION DEMOLITION NORTH FACING ELEVATIONS
- SITE WIDE EXISTING GROUND FLOOR PLAN
- SITE WIDE DEMOLITION GROUND FLOOR PLAN
- SITE WIDE EXISTING WEST FACING ELEVATION
- SITE WIDE EXISTING FIRST FLOOR PLAN
- SITE WIDE DEMOLITION FIRST FLOOR PLAN
- SITE WIDE EXISTING SECOND FLOOR PLAN
- SITE WIDE DEMOLITION SECOND FLOOR PLAN
- SITE WIDE EXISTING THIRD FLOOR PLAN
- SITE WIDE DEMOLITION THIRD FLOOR PLAN
- SITE WIDE DEMOLITION FOURTH FLOOR PLAN
- SITE WIDE DEMOLITION FIFTH FLOOR PLAN
- SITE WIDE DEMOLITION SIXTH FLOOR PLAN
- SITE WIDE DEMOLITION SEVENTH FLOOR PLAN
- SITE WIDE DEMOLITION BASEMENT PLAN
- SITE WIDE DEMOLITION ROOF LEVEL PLAN
- SITE WIDE SITE LOCATION PLAN
- SITE PHASING PLAN
- SITE WIDE DEMOLITION NORTH FACING ELEVATION
- SITE WIDE DEMOLITION EAST FACING ELEVATION
- SITE WIDE DEMOLITION SOUTH FACING ELEVATION
- SITE WIDE DEMOLITION WEST FACING ELEVATION
- SITE WIDE DEMOLITION SECTION A-A
- ANNEX ROOF PLAN GA
- HE LEVEL 05 GA
- HE LEVEL 06 GA
- PBSA LEVEL 01 GA
- PBSA LEVEL 03 GA
- PBSA LEVEL 05 GA
- PBSA LEVEL 06 GA
- PBSA LEVEL 07 GA
- PBSA LEVEL 16 GA
- PBSA LEVEL 19 GA
- PBSA LEVEL 20 GA
- LANDSCAPE GROUND FLOOR GA
- HARDWORKS GROUND FLOOR GA
- SOFTWORKS GROUND FLOOR GA
- FURNITURE GROUND FLOOR GA
- LANDSCAPE GROUND FLOOR S278 PHASING PLAN GA
- LANDSCAPE ROOFS GA
- GLA BE SEEN SPREADSHEET
- GAL CARBON EMISSION PART L 2021 REPORTING SPREADSHEET
- GA CIRCULAR ECONOMY STATEMENT TEMPLATE
- AIR QUALITY ASSESSMENT.PDF
- ARBORICULTRAL STATEMENT
- BASEMENT IMPACT REPORT - PART 1
- BASEMENT IMPACT REPORT - PART 2
- BASEMENT IMPACT REPORT - PART 3A
- BASEMENT IMPACT REPORT - PART 3B
- BASEMENT IMPACT REPORT - PART 4
- BASEMENT IMPACT REPORT - PART 5
- BIODIVERSITY NET GAIN REPORT
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - PART 2
- CIRCUAR ECOONOMY STATEMENT - PART 1
- CIRCUAR ECOONOMY STATEMENT - PART 2
- CONTAMINATED LAND ASSESSMENT - PART 1
- CONTAMINATED LAND ASSESSMENT - PART 2
- CONTAMINATED LAND ASSESSMENT - PART 3
- CONTAMINATED LAND ASSESSMENT - PART 4A
- CONTAMINATED LAND ASSESSMENT - PART 4B
- CONTAMINATED LAND ASSESSMENT - PART 5
- CONTAMINATED LAND ASSESSMENT - PART 6
- PART 1
- PART 2
- PART 3
- PART 4A
- PART 4B
- PART 5
- PART 6A
- PART 6B
- PART 7
- PART 8
- PART 9
- PART 11
- PART 12
- NON TECHNICAL SUMMARY
- VOL3_APPENDIX_CH12_BUILT HERITAGE - PART 1
- VOL3_APPENDIX_CH12_BUILT HERITAGE - PART 2
- VOL3_APPENDIX_CH11_CLIMATE AND GHG
- VOL3_APPENDIX_CH10_ARCHAE OLOGY - PART 1
- VOL3_APPENDIX_CH10_ARCHAE OLOGY - PART 2
- VOL3_APPENDIX_CH10_ARCHAE OLOGY - PART 3
- VOL3_APPENDIX_CH10_ARCHAE OLOGY - PART 4
- VOL3_APPENDIX_CH09_DSOSG - PART 1
- VOL3_APPENDIX_CH09_DSOSG - PART 2
- VOL3_APPENDIX_CH09_DSOSG - PART 3
- VOL3_APPENDIX_CH09_DSOSG - PART 4
- VOL3_APPENDIX_CH09_DSOSG - PART 5
- VOL3_APPENDIX_CH09_DSOSG - PART 6
- VOL3_APPENDIX_CH09_DSOSG - PART 7
- VOL3_APPENDIX_CH09_DSOSG - PART 8
- VOL3_APPENDIX_CH09_DSOSG - PART 9
- VOL3_APPENDIX_CH09_DSOSG - PART 10
- VOL3_APPENDIX_CH09_DSOSG - PART 11
- VOL3_APPENDIX_CH09_DSOSG - PART 12
- VOL3_APPENDIX_CH09_DSOSG - PART 13
- VOL3_APPENDIX_CH09_DSOSG - PART 14
- VOL3_APPENDIX_CH09_DSOSG - PART 15
- VOL3_APPENDIX_CH09_DSOSG - PART 16
- VOL3_APPENDIX_CH09_DSOSG - PART 17
- VOL3_APPENDIX_CH09_DSOSG - PART 18
- VOL3_APPENDIX_CH09_DSOSG - PART 19
- VOL3_APPENDIX_CH09_DSOSG - PART 20
- VOL3_APPENDIX_CH09_DSOSG - PART 21
- VOL3_APPENDIX_CH09_DSOSG - PART 22
- VOL3_APPENDIX_CH09_DSOSG - PART 23
- VOL3_APPENDIX_CH09_DSOSG - PART 24
- VOL3_APPENDIX_CH09_DSOSG - PART 25
- VOL3_APPENDIX_CH09_DSOSG - PART 26
- VOL3_APPENDIX_CH09_DSOSG - PART 27
- VOL3_APPENDIX_CH09_DSOSG - PART 28
- VOL3_APPENDIX_CH09_DSOSG - PART 29
- VOL3_APPENDIX_CH09_DSOSG - PART 30
- VOL3_APPENDIX_CH09_DSOSG - PART 31
- VOL3_APPENDIX_CH09_DSOSG - PART 32
- VOL3_APPENDIX_CH09_DSOSG - PART 33
- VOL3_APPENDIX_CH09_DSOSG - PART 34
- VOL3_APPENDIX_CH09_DSOSG - PART 35
- VOL3_APPENDIX_CH08_NOISE AND VIBRATION - PART 1
- VOL3_APPENDIX_CH08_NOISE AND VIBRATION - PART 2
- VOL3_APPENDIX_CH07_HUMAN HEALTH
- VOL3_APPENDIX_CH06_SOCIO ECONOMICS
- VOL3_APPENDIX_CH02_EIA METHDOLOGY - PART 1
- VOL3_APPENDIX_CH02_EIA METHDOLOGY - PART 2
- VOL3_APPENDIX_CH02_EIA METHDOLOGY - PART 3
- VOL3_APPENDIX_CH02_EIA METHDOLOGY - PART 4
- VOL3_APPENDIX_CH02_EIA METHDOLOGY - PART 5
- VOL3_APPENDIX_CH02_EIA METHDOLOGY - PART 6
- VOL3_APPENDIX_CH02_EIA METHDOLOGY - PART 7
- VOL3_APPENDIX_CH01_INTROD UCTION
- VOLUME 2 _ TVIA - PART 1
- VOLUME 2 _ TVIA - PART 2
- VOLUME 2 _ TVIA - PART 3
- VOLUME 2 _ TVIA - PART 4
- VOL1_CH01_INTRODUCTION_FI NAL
- VOL1_CH02_EIA METHODOLOGY_FINAL
- VOL1_CH03_ALTERNATIVES AND DESIGNEVOLUTION_FINAL
- VOL1_CH04_PROPOSED DEVELOPMENT_FINAL
- VOL1_CH05_DEM AND CONST_FINAL
- VOL1_CH06_SOCIOECONOMICS_FIN AL
- VOL1_CH07_HUMAN HEALTH_FINAL
- VOL1_CH08_NOISE AND VIB_FINAL
- VOL1_CH09_DSOSG_FINAL
- VOL1_CH10_ARCHAEOLOGY_FINAL
- VOL1_CH11_CLIMATE CHANGE_FINAL
- VOL1_CH12_BUILTHERITAGE_FINAL
- VOL1_CH13_EFFECTINTERACTIONS_FI NAL
- VOL1_CH14_LIKELYSIGNIFICANTEFFE CTS_FINAL
- VOL1_CH15_MITIGATION AND MONITORING_FINAL
- DRAINAGE STRATERGY - PART 1
- DRAINAGE STRATERGY - PART 2
- FIRE STATEMENT ? HIGHER EDUCATION PLOT
- FIRE STATEMENT - PBSA PLOT
- PART 1
- PART 2
- FLUE AND VENTILATION EXTRACTION STATEMENT
- FOUL SEWAGE AND UTILITIES ASSESSMENT
- FRAMEWORK TRAVEL PLAN
- GIA FLOORSPACE SCHEDULE
- INFRASTRUCTURE IMPACT ASSESSMENT
- LANDSCAPE STRATEGY - PART 1
- LANDSCAPE STRATEGY - PART 2
- LANDSCAPE STRATEGY - PART 3
- LIGHTING ASSESSMENT - PART 1
- LIGHTING ASSESSMENT - PART 2
- LIGHTING ASSESSMENT - PART 3
- LIGHTING ASSESSMENT - PART 4
- LIGHTING ASSESSMENT - PART 5
- LIGHTING ASSESSMENT - PART 6
- LIGHTING ASSESSMENT - PART 7
- LIGHTING ASSESSMENT - PART 8
- LIGHTING ASSESSMENT - PART 9
- LIGHTING ASSESSMENT - PART 10
- LIGHTING ASSESSMENT - PART 11
- OFFICE MARKET ASSESSMENT
- OPERATIONAL WASTE MANAGEMENT
- OUTLINE CONSTRUCTION ENVIROMENTAL MANAGEMENT PLAN
- OUTLINE CONSTRUCTION LOGISTICS
- OUTLINE DELIVERY SERVICE MANAGEMENT PLAN
- PBSA NEEDS ASSESSMENT
- PRE DEMOLITION AUDIT - PART 1
- PRE DEMOLITION AUDIT - PART 2
- PRE REDEVELOPMENT AUDIT - PART 1
- PRE REDEVELOPMENT AUDIT - PART 2
- PRELIMINARY ECOLOGICAL ASSESSMENT
- SITE WASTE MANAGEMENT PLAN
- STATEMENT OF COMMUNITY INVOLVEMENT
- SUSTAINABILITY AND ENERGY STATEMENT - PART 2
- SUSTAINABILITY AND ENERGY STATEMENT - PART 3
- SUSTAINABILITY AND ENERGY STATEMENT - PART 4
- SUSTAINABILITY AND ENERGY STATEMENT - PART 5
- SUSTAINABILITY AND ENERGY STATEMENT - PART 6
- SUSTAINABILITY AND ENERGY STATEMENT - PART 7
- SUSTAINABILITY AND ENERGY STATEMENT - PART 8
- SUSTAINABILITY AND ENERGY STATEMENT - PART 9
- SUSTAINABILITY AND ENERGY STATEMENT - PART 10
- SUSTAINABILITY AND ENERGY STATEMENT - PART 11
- SUSTAINABILITY AND ENERGY STATEMENT - PART 12
- SUSTAINABILITY AND ENERGY STATEMENT - PART 13
- SUSTAINABILITY AND ENERGY STATEMENT - PART 14
- SUSTAINABILITY AND ENERGY STATEMENT - PART 15
- SUSTAINABILITY AND ENERGY STATEMENT - PART 1
- SUSTAINABILITY AND ENERGY STATEMENT - PART 2
- TRANSPORT ASSESSMENT- PART 1
- TRANSPORT ASSESSMENT- PART 2
- TRANSPORT ASSESSMENT- PART 3
- TRANSPORT ASSESSMENT- PART 4
- TRANSPORT ASSESSMENT- PART 5
- TRANSPORT ASSESSMENT- PART 6
- TRANSPORT ASSESSMENT- PART 7
- TRANSPORT ASSESSMENT- PART 8
- TRANSPORT ASSESSMENT- PART 9
- TRANSPORT ASSESSMENT- PART 10
- TRANSPORT ASSESSMENT- PART 11
- TRANSPORT ASSESSMENT- PART 12
- TRANSPORT ASSESSMENT- PART 13
- TRANSPORT ASSESSMENT- PART 14
- TRANSPORT ASSESSMENT- PART 15
- TRANSPORT ASSESSMENT- PART 16
- CIRCULAR ECONOMY STATEMENT - PART 3
- CIRCULAR ECONOMY STATEMENT - PART 4
- WHOLE LIFE CARBON ASSESSMENT - PART 1
- WHOLE LIFE CARBON ASSESSMENT - PART 2
- WHOLE LIFE CARBON ASSESSMENT - PART 3
- WHOLE LIFE CARBON ASSESSMENT - PART 4
- WHOLE LIFE CYCLE CARBON ASSESSMENT - PART 2
- NOISE IMPACT ASSESSMENT
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Tower Hamlets for determination, against a statutory target of eight weeks. Over the last year Tower Hamlets decided full applications in a median of 56 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Calcutta House, Old Castle Street, London, E1 7NT
Request for an Environmental Impact Assessment (EIA) Scoping opinion under Regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended), in respect of the proposed part retention and extension, and part demolition and construction of a new mixed-use development. Within the northern portion of the Site, the Proposed Development will include an extension of two floors to the existing retained elements of the Calcutta House building, housing higher education uses (Use Class F1), resulting in overall eight levels (including ground level), and providing a total of circa 10,588m2 of educational space, as well as approximately 215m2 of retail (Use Class E) and 110m2 of community uses (Use Class F2), along with associated public realm, cycle parking spaces, refuse storage, plant and loading bay. Within the southern portion of the Site, the Proposed Development will include the construction of a new multi-level Purpose-Built Student Accommodation (Sui Generis) building and community facilities (Use Class F2) ranging from approximately 2 to 21 storeys in height (including ground level and excluding rooftop plant), with approximately 787 rooms, associated amenity and ancillary space.
Decided Outline Extension Demolition 18 docs -
1 Commercial Street, London, E1 6BF
Application for Non-Material Amendment to condition 2 (In accordance with Plans) and condition 5 (Cycle Storage) of planning application ref. PA/25/01288, dated 6 October 2025 for Change of use of 5th and 6th floors from Use Class E (Office) to flexible Use Class E / Class F1 (Education) and associated internal works. Non Material amendment(s): amendments to the approved cycle parking and end of trip facilities.
Granted Amendments 5 docs -
Bus Shelter, Pavement Outside 10 Whitechapel High Street, London E1
Display of a double sided internally illuminated LCD screen to display content with automatic rotation of images at the existing bus shelter, freestanding.
Granted Advertising 9 docs -
Crawford Building, 112 Whitechapel High Street, London, E1 7AP
Submission of details pursuant to condition no.4 (Risk Assessment and Method Statement) of planning permission ref: PA/25/01530, dated 24/11/2025.
Granted Conditions 12 docs -
Crawford Building, 112 Whitechapel High Street, London, E1 7AP
Proposed remedial replacement of existing curtain walling, to south east corner of the building to the apartments of 1605, 1606, 1705, 1706, 1805, 1806, 1905, and 1906 on floors 16 to 19, including replacement glazing panels to 'sail' cladding on south east corner of the building from the 14th floor upwards are proposed. Replacement balcony doors, decking, and balustrades are also proposed to apartments 1605, 1705, 1805.
Granted Full applications New dwelling Windows or glazing 28 docs -
Ground Floor, 21 Commercial Street, London E1 6NE
Proposals for: Replacement of existing glazing above the current glazed double doors with new louvres designed to match the existing louvre system and replacement of the existing adjacent louvre with glazing. Installation of fifteen (15) high-level external wall lights, finished in black, providing downward-only illumination via 6W G10 LED bulbs (3000K, 560 lumens). Installation of a new low-level gas pipe with an associated infill panel.
Granted Full applications Extension Windows or glazing 11 docs
Other full applications
In Tower Hamlets
-
PA/26/00497/NC Decided
72 Cambridge Heath Road, London, E1 5QJ
The change of use of the ground floor premises at 72 Cambridge Heath Road, London E1 5QJ from Use Class E (Commercial, Business and Service) to Sui Generis (Laundrette) including external flue.
-
PA/26/00815/NC Granted
22-28 Mackenzie Walk, London, E14 4PH
Display of the Logo and pub name to existing canopies and the addition of one new canopy
-
PA/26/00848/NC Granted
9, 11 - 15 Baxendale Street, London, E2 7BY
Replace existing single-glazed timber windows with slimline double-glazed timber windows.
-
PA/26/00364/A1 Granted
Bradwell Street Garages, Junction of Bradwell St and Moody, London, E1 4BY
Redevelopment of the site to provide a four-storey building comprising 7 no. self-contained residential flats (Class C3), including 1 no. M4(3) unit, along with soft and hard landscaping.
-
PA/25/01040/NC Granted
Whitechapel Fire Station, 27 Commercial Road, London, E1 1LD
Proposed development includes the replacement of flat roofs of Whitechapel Fire Station building with associated works such as raising external railings, replacement of rain water goods and external door replacements. New proposal also includes refurbishment of flat roof 1 memorial garden.