Planning application

Railway Arch, 289 Cambridge Heath Road, London, E2 9HA

Awaiting decision Tower Hamlets PA/26/00282/S Approval of Details -Discharge Condition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Submission of details pursuant to condition no.4 (Construction Management Plan) of planning permission ref: PA/25/00734, dated 13/02/2026

As published by the council, reference PA/26/00282/S

Application record

Reference
PA/26/00282/S
Type
Approval of Details -Discharge Condition
Status
Registered
Received
16 Feb 2026
Validated
16 Feb 2026
Ward
Bethnal Green West
Decision by
Delegated
Postcode
E2 9HA

Site history

Applications at this address on the Tower Hamlets register

This site has had 2 applications since 2025: 1 approved, 0 refused.

  • PA/25/00734/NC Granted

    Railway Arch, 289 Cambridge Heath Road, London, E2 9HA

    Proposed works include: Alterations to existing extended front elevation to provide a reduced width and centralised glazed main entrance with perforated security roller shutter door over; Installation of high-level aluminium framed glazing to the front arch infill; Demolition of rear extension incorporating the new construction of a blockwork flank wall to re-support the continuing rear extension structure to adjacent arch unit 288; Construction of new rear infill incorporating a new roller shutter door and pedestrian door and high-level aluminium framed glazing; Construction of new refuge landing and steps with associated hand railing to provide safe access/egress via the rear forming of new concrete hard standing to the rear yard. Forming of internal 1:12 vehicular ramp from the rear yard into the unit; Forming of new concrete hardstanding to external rear yard.

    Decided 13 Feb 2026 Full applications

Timeline

Dates from the published record

  1. 16 Feb 2026

    Received by Tower Hamlets

  2. 25 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 13 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Tower Hamlets took a median of 56 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: PA/25/00734/NC (Decided)

Who's behind it

Company information only, from the register and Companies House

Rapleys LLP Agent

840 applications on PlanIndex · across 132 councils · 95% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

  • LONDON UNDERGROUND Consultee Comment · 27 Feb 2026
  • TFL Consultee Comment · 25 Feb 2026
  • CONSTRUCTION MANAGEMENT PLAN Report · 16 Feb 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Tower Hamlets for determination, against a statutory target of eight weeks. Over the last year Tower Hamlets decided condition discharge and variation applications in a median of 71 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Railway Arch, 289 Cambridge Heath Road, London, E2 9HA

    PA/25/00734/NC Submitted 26 Sep 2025 50 yards away

    Proposed works include: Alterations to existing extended front elevation to provide a reduced width and centralised glazed main entrance with perforated security roller shutter door over; Installation of high-level aluminium framed glazing to the front arch infill; Demolition of rear extension incorporating the new construction of a blockwork flank wall to re-support the continuing rear extension structure to adjacent arch unit 288; Construction of new rear infill incorporating a new roller shutter door and pedestrian door and high-level aluminium framed glazing; Construction of new refuge landing and steps with associated hand railing to provide safe access/egress via the rear forming of new concrete hard standing to the rear yard. Forming of internal 1:12 vehicular ramp from the rear yard into the unit; Forming of new concrete hardstanding to external rear yard.

    Granted Full applications Extension Demolition +1 14 docs
  • Railway Arch, 302 Cambridge Heath Road, London, E2 9HA

    PA/25/00773/NC Submitted 26 Sep 2025 100 yards away

    Proposed works consist of: Installation of aluminium glazed shop front, to the rear: re-instatement of bricked-up window apertures, Replacement rear flat roof structure and covering, construction of new brick wall, installation of vertical bar railing and new vertical bar gate, construction of new steps with associated hand railing to provide safe access/egress.

    Granted Full applications Windows or glazing 12 docs
  • Flat 1-10, 2 Bishops Way, London, E2 9HB

    PA/25/02252/NC Submitted 15 Jan 2026 100 yards away

    Replacement of existing double glazed UPVC windows with double glazed UPVC windows

    Granted Full applications Windows or glazing 14 docs
  • White Horse Public House, 236 Cambridge Heath Road, London, E2 9DA

    PA/25/01643/S Submitted 17 Sep 2025 150 yards away

    97% historically approved · decision due ~12 Nov

    Submission of details pursuant to condition 3 (Section 106 Agreement), of Planning Permission dated 01/04/2011, Ref: PA/10/02818.

    Awaiting decision Conditions 2 docs
  • 531 Hackney Road, London, E2 9ED

    PA/26/00057/NC Submitted 12 Jan 2026 150 yards away

    Temporary installation (9 Months) of an externally illuminated static advertisement positioned on Hackney Road , measuring 9.2m x 5m integrated within scaffold shroud with a replica façade treatment across the scaffolded elevations.

    Granted Advertising 10 docs
  • 531 Hackney Road, London, E2 9ED

    PA/26/01694/NC Submitted 13 Oct 2026 150 yards away

    91% historically approved · decision due ~8 Dec

    Temporary installation (9 Months) of an externally illuminated static advertisement positioned on...

    Awaiting decision

In Tower Hamlets

  • PA/26/01551/S Awaiting decision

    Former Poplar Bus Depot, Leven Road, London, E14 0LN

    Submission of detail pursuant conditional no. 28(Delivery and Servicing Plan) of planning permission ref:PA/19/02148 dated 14/10/2020.

    Received 9 Sep, published by the council 11 Sep 2026 Conditions
  • PA/26/01552/S Awaiting decision

    South Central Core and Surrounding Land, South Colonnade, Canary Wharf, London, E14

    Submission of details pursuant to condition no.4 (External Materials) of planning permission ref: PA/26/00436, dated 19/05/2026

    Received 7 Sep, published by the council 9 Sep 2026 Conditions
  • PA/26/00851 Granted

    TSVC Building, Land bounded by Hepscott Road and Rothbury Road, E9 5HH

    Submission of details pursuant to condition no.21 (Waste and Recycling Storage drawings) of planning permission ref:LL/17/00222/FUL Dated 29/10/2019 as amended by Non Material Amendment ref: LL/22/00069/NMA, Dated 06/01/2023

    Received 13 May, published by the council 25 Jul 2026 Conditions
  • PA/26/01540/S Awaiting decision

    St Georges Leisure Centre, 221 The Highway, London, E1W 3BP

    Submission of details pursuant to condition no.23 (A Method Statement) of planning permission ref: PA/24/01804, dated 02/06/2026

    Received 3 Sep, published by the council 8 Sep 2026 Conditions
  • PA/26/01518/S Awaiting decision

    Belvedere and Mandeville Place, Queen Elizabeth Olympic Park, Stratford, E20 2AA

    Submission of details pursuant to condition no.5 (Biodiversity Gain Plan) in relation to Phase 1 of planning permission ref: LL/24/00277/FUL, dated 25/11/2024

    Received 28 Aug, published by the council 7 Sep 2026 Conditions