Planning application
The Whitechapel Estate, Land between Varden Street and Ashfield Street, Whitechapel, London E1 2JH
Works: Extension Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Phased redevelopment of the site comprising demolition of all existing buildings (save for 46-48a Ashfield Street); and development including 6 new buildings ranging between 5 and 22 storeys in height, comprising up to 111 x residential dwellings (Use Class C3), up to 167 x specialist accommodation units (Use Class C2), up to 230 x co-living units (Sui Generis), up to 21,961 sqm GEA of flexible office / life sciences / hospital floorspace (Use class E(g)/ E(e)), up to 30,433 sqm GEA of flexible hospital floorspace (Use Class E(e)), up to 1,911 sqm GEA of business floorspace (Use Class E), up to 1,882 sqm GEA of flexible community engagement, sport and leisure floorspace (Use Class F1/F2/E(d)/Sui Generis), up to 440 sqm GEA of flexible retail / food and beverage floorspace (Use Class F/E(a)/E(b)); change of use from office to residential (Use Class C3) and refurbishment of 46-48a Ashfield Street; extension to 46 Ashfield Street; refurbishment of 80a Ashfield Street; car parking, hard and soft landscaping and other necessary associated works [This application is accompanied by an Environmental Statement]
As published by the council, reference PA/25/02236
Application record
- Reference
- PA/25/02236
- Type
- Full Planning Permission
- Status
- Registered
- Received
- 22 Dec 2025
- Validated
- 22 Dec 2025
- Ward
- Whitechapel
- Decision by
- Strategic Development Committee
- Postcode
- E1 2JH
Timeline
Dates from the published record
-
22 Dec 2025
Received by Tower Hamlets
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 16 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Tower Hamlets took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,641 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
518 documents on file for this application
- TRANSPORT COMMENTS RESPONSE V2
- QUEEN MARY UNIVERSITY OF LONDON
- FINAL REVIEW REPORT 001
- WHITECHAPEL ESTATE REDEVELOPMENT HOUSING STRATEGY NOTE
- REVIEW OF ADDITIONAL MATERIAL
- INDICATIVE TOWER CRANE LOCATIONS AND UNLOADING BAYS
- CONSOLIDATED SAP WORKSHEETS
- DAYLIGHT/SUNLIGHT COMPARISON TABLE
- ASSESSMENT REVIEW
- BIODIVERSITY RESPONSE
- NOISE RESPONSE
- CONTAMINATED LAND RESPONSE
- ENERGY RESPONSE
- RESPONSE TO LBTH WASTE
- RESPONSE TO LBTH EHO SMELL AND POLLUTION
- RESPONSE TO LBTH HIGHWAYS OFFICER COMMENTS
- RESPONSE TO LBTH HOUSING COMMENTS
- RESPONSE TO REVIEW OF DAYLIGHT, SUNLIGHT, GLARE AND LIGHT POLLUTION ASSESSMENTS
- DAYLIGHT & SUNLIGHT ANALYSIS 1
- DAYLIGHT & SUNLIGHT ANALYSIS 3
- DAYLIGHT & SUNLIGHT ANALYSIS 2
- DAYLIGHT & SUNLIGHT ANALYSIS
- DAYLIGHT & SUNLIGHT ANALYSIS
- DAYLIGHT & SUNLIGHT ANALYSIS
- DAYLIGHT & SUNLIGHT ANALYSIS
- DAYLIGHT & SUNLIGHT ANALYSIS
- DAYLIGHT & SUNLIGHT ANALYSIS
- DAYLIGHT & SUNLIGHT ANALYSIS
- CE RESPONSES 20.03.2026 - WHITECHAPEL ESTATE - COMMENTS LOG
- CE RESPONSES 20.03.2026 - KEY COMPONENT STRATEGIES & END-OF-LIFE
- CE RESPONSES 20.03.2026 - GLA CE MEMO - STAGE 1
- CE RESPONSES 20.03.2026 - APPENDIX C CIRCULAR ECONOMY WORKSHOP - CIRCULAR CONSIDERATION - PROJECT CROSS
- CE RESPONSES 20.03.2026 - APPENDIX C CIRCULAR ECONOMY WORKSHOP - PROJECT CROSS - INTRO TO CE
- CE RESPONSES 20.03.2026 - APPENDIX D RECYCLED CONTENT CALCULATIONS - RECYCLED CONTENT COMPILED
- CE RESPONSES 20.03.2026 - WHITECHAPEL ESTATE - CE GLA SPREADSHEETS REV 2 - BUILDING G
- CE RESPONSES 20.03.2026 - WHITECHAPEL ESTATE - CE GLA SPREADSHEETS REV 2 - BUILDING D2
- CE RESPONSES 20.03.2026 - WHITECHAPEL ESTATE - CE GLA SPREADSHEETS REV 2 - BUILDING D1
- CE RESPONSES 20.03.2026 - WHITECHAPEL ESTATE - CE GLA SPREADSHEETS REV 2 - BUILDING C
- CE RESPONSES 20.03.2026 - WHITECHAPEL ESTATE - CE GLA SPREADSHEETS REV 2 - BUILDING B
- CE RESPONSES 20.03.2026 - WHITECHAPEL ESTATE - CE GLA SPREADSHEETS REV 2 - BUILDING A
- ENERGY RESPONSES 20.03.2026 - GLA ENERGY CONSULTATION (STAGE 1) ENERGY MEMO 2025
- ENERGY & SUSTAINABILITY STATEMENT & OVERHEATING MITIGATION - PART 1
- ENERGY & SUSTAINABILITY STATEMENT & OVERHEATING MITIGATION - PART 2
- ENERGY & SUSTAINABILITY STATEMENT & OVERHEATING MITIGATION - PART 3
- ENERGY & SUSTAINABILITY STATEMENT & OVERHEATING MITIGATION - PART 4
- PROJECT CROSS - SITEWIDE GLA CARBON EMISSION SPREADSHEET
- PV LAYOUT DETAILS
- GLA SPREADSHEETS - BUILDING C
- GLA SPREADSHEETS - BUILDING G
- GLA SPREADSHEETS - BUILDING F
- GLA SPREADSHEETS - BUILDING D2
- GLA SPREADSHEETS - BUILDING D1
- GLA SPREADSHEETS - BUILDING B
- GLA SPREADSHEETS - BUILDING A
- GLA SPREADSHEETS - BLOCK E
- GLA WLC MEMO
- WLC GLA SPREADSHEETS - BUILDING A
- WLC GLA SPREADSHEETS - BUILDING C
- REPONSE TO LBTH ARCHAEOLOGY COMMENTS
- RESPONSE TO LBTH VIABILITY REVIEW
- ES REVIEW RESPONSE - PART 1
- ES REVIEW RESPONSE - PART 2
- ES REVIEW RESPONSE - PART 3
- ES REVIEW RESPONSE - PART 4
- RESPONSE TO TFL 16 MARCH 2026
- RESPONSE TO ACCESSIBLE HOUSING 18 MARCH 2026
- REVIEW OF FINANCIAL VIABILITY ASSESSMENT (FVA)
- HISTORIC ENGLAND (GLAAS)
- TFL
- INTERIM REVIEW REPORT
- THE GEORGIAN GROUP
- GLA LETTER 2 MARCH 2026
- GLA PLANNING REPORT
- ENVIRONMENT AGENCY
- THAMES WATER
- HISTORIC ENGLAND
- PORT OF LONDON AUTHORITY
- HSE
- LONDON CITY AIRPORT
- UK POWER NETWORKS
- SPORT ENGLAND
- ARQIVA
- CADENT GAS LTD
- NATURAL ENGLAND
- ACTIVE TRAVEL ENGLAND
- NATS
- HSE - NO INTEREST
- FINANCIAL VIABILITY ASSESSMENT
- COVER LETTER
- PROPOSED SECTIONS - D1 BUILDING
- PROPOSED SECTIONS - D1 BUILDING
- PROPOSED SECTIONS - D1 BUILDING
- PROPOSED SECTIONS - D1 BUILDING
- PROPOSED WEST ELEVATION - D1 BUILDING
- PROPOSED SOUTH ELEVATION - D1 BUILDING
- PROPOSED EAST ELEVATION - D1 BUILDING
- PROPOSED NORTH ELEVATION - D1 BUILDING
- PROPOSED ACCESSIBLE UNITS (CANDD) - D1 BUILDING
- PROPOSED TYPICAL UNITS (AANDB) - D1 BUILDING
- PROPOSED FLOOR ROOF PLAN - D1 BUILDING
- PROPOSED FLOOR L17 PLAN - D1 BUILDING
- PROPOSED FLOOR L16 PLAN - D1 BUILDING
- PROPOSED FLOOR L15 PLAN - D1 BUILDING
- PROPOSED FLOOR L14 PLAN - D1 BUILDING
- PROPOSED FLOOR L13 PLAN - D1 BUILDING
- PROPOSED FLOOR L12 PLAN - D1 BUILDING
- PROPOSED FLOOR L11 PLAN - D1 BUILDING
- PROPOSED FLOOR L10 PLAN - D1 BUILDING
- PROPOSED FLOOR L09 PLAN - D1 BUILDING
- PROPOSED FLOOR L08 PLAN - D1 BUILDING
- PROPOSED FLOOR 07 PLAN - D1 BUILDING
- PROPOSED FLOOR 06 PLAN - D1 BUILDING
- PROPOSED FLOOR 05 PLAN - D1 BUILDING
- PROPOSED FLOOR 04 PLAN - D1 BUILDING
- PROPOSED FLOOR 03 PLAN - D1 BUILDING
- PROPOSED FLOOR 02 PLAN - D1 BUILDING
- PROPOSED FLOOR 01 PLAN - D1 BUILDING
- PROPOSED GROUND FLOOR PLAN - D1 BUILDING
- PROPOSED BASEMENT B1 FLOOR PLAN - D1 BUILDING
- PROPOSED SECTIONS - F BUILDING (80A ASHFIELD ST)
- PROPOSED GROUND FLOOR FLOOR 01 AND ROOF PLAN - F BUILDING (80A ASHFIELD STREET)
- EXISTING SECTIONS - F BUILDING (80A ASHFIELD ST)
- EXISTING GROUND FLOOR FLOOR 01 AND ROOF PLAN - F BUILDING (80A ASHFIELD STREET)
- PROPOSED SECTIONS - G BUILDING
- PROPOSED SECTIONS - G BUILDING
- PROPOSED SECTIONS - G BUILDING
- PROPOSED SECTIONS - G BUILDING
- PROPOSED SECTIONS - G BUILDING
- PROPOSED SECTIONS - G BUILDING
- PROPOSED WEST ELEVATION - G BUILDING
- PROPOSED EAST ELEVATION - G BUILDING
- PROPOSED SOUTH ELEVATION - G BUILDING
- PROPOSED NORTH ELEVATION - G BUILDING
- PROPOSED ROOF PLAN - G BUILDING
- PROPOSED FLOOR 21 PLAN - G BUILDING
- PROPOSED FLOOR 20 PLAN - G BUILDING
- PROPOSED FLOOR 19 PLAN - G BUILDING
- PROPOSED FLOOR 18 PLAN - G BUILDING
- PROPOSED FLOOR 17 PLAN - G BUILDING
- PROPOSED FLOOR 16 PLAN - G BUILDING
- PROPOSED FLOOR 15 PLAN - G BUILDING
- PROPOSED FLOOR 14 PLAN - G BUILDING
- PROPOSED FLOOR 13 PLAN - G BUILDING
- PROPOSED FLOOR 12 PLAN - G BUILDING
- PROPOSED FLOOR 11 PLAN - G BUILDING
- PROPOSED FLOOR 10 PLAN - G BUILDING
- PROPOSED FLOOR 09 PLAN - G BUILDING
- PROPOSED FLOOR 08 PLAN - G BUILDING
- PROPOSED FLOOR 07 PLAN - G BUILDING
- PROPOSED FLOOR 06 PLAN - G BUILDING
- PROPOSED FLOOR 05 PLAN - G BUILDING
- PROPOSED FLOOR 04 PLAN - G BUILDING
- PROPOSED FLOOR 03 PLAN - G BUILDING
- PROPOSED FLOOR 02 PLAN - G BUILDING
- PROPOSED FLOOR 01 PLAN - G BUILDING
- PROPOSED GROUND FLOOR PLAN - G BUILDING
- PROPOSED BASEMENT B1 MEZZANINE FLOOR PLAN - G BUILDING
- PROPOSED BASEMENT B1 FLOOR PLAN - G BUILDING
- SITE LOCATION PLAN - PROPOSED
- SITE ELEVATION - WEST - DEMOLITION
- SITE ELEVATION - SOUTH - DEMOLITION
- SITE ELEVATION - EAST - DEMOLITION
- SITE ELEVATION - NORTH - DEMOLITION
- SITE LOCATION PLAN - DEMOLITION
- SITE PLAN - EXISTING
- SITE LOCATION PLAN - EXISTING
- RESIDENTIAL FRAMEWORK TRAVEL PLAN
- RESIDENTIAL REUSE RECYCLING AND WASTE PLAN - PART 1
- RESIDENTIAL REUSE RECYCLING AND WASTE PLAN - PART 2
- SITEWIDE GLA CARBON EMISSION SPREADSHEET
- STATEMENT OF COMMUNITY INVOLVEMENT
- PART 1
- PART 2
- PART 3
- PART 4
- PART 5
- PART 6
- PART 7
- URBAN GREENING STATEMENT
- UTILITIES ASSESSMENT
- FLUE AND VENTILATION EXHAUST LOCATIONS
- PART 1
- PART 2
- PART 3
- PART 4
- PART 5
- PART 6
- PART 7
- PART 8
- PART 9
- PART 10
- PART 11
- PART 12
- PART 13
- PART 14
- PART 15
- PART 16
- PART 17
- PART 18
- PART 19
- PART 20
- PART 21
- WHOLE LIFE CARBON ASSESSMENT
- GLA WLCA TEMPLATE - BUILDING C
- GLA WLCA TEMPLATE - BUILDING D1
- GLA WLCA TEMPLATE - BUILDING D2
- GLA WLCA TEMPLATE - BUILDING G
- GLA WLCA TEMPLATE - BUILDING A
- GLA WLCA TEMPLATE - BUILDING B
- GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING G
- GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING G
- GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING D2
- GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING D1
- GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING C
- GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING B
- GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING A
- SITEWIDE GLA CARBON EMISSION SPREADSHEET DECEMBER 2025
- THE STATUTORY BIODIVERSITY METRIC CALCULATION TOOL DECEMBER 2025
- GAIN OF RESIDENTIAL
- LOSS OF RESIDENTIAL
- ARBORICULTURAL IMPACT ASSESSMENT AND TREE SURVEY
- AVIATION SAFEGUARDING ASSESSMENT
- BIODIVERSITY NET GAIN ASSESSMENT
- BUILDING B - ELEVATIONS
- BUILDING B - PLANS
- BUILDING B - SECTIONS
- BUILDING B - UNIT LAYOUTS
- BUILDING MANAGEMENT PLANS
- CIRCULAR ECONOMY STATEMENT - PART 1
- CIRCULAR ECONOMY STATEMENT - PART 2
- CIRCULAR ECONOMY STATEMENT - PART 3
- CIRCULAR ECONOMY STATEMENT - PART 4
- CIRCULAR ECONOMY STATEMENT - PART 5
- COMMERCIAL FRAMEWORK TRAVEL PLAN
- COMMERCIAL REUSE RECYCLING AND WASTE PLAN
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - PART 1
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - PART 2
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - PART 3
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - PART 4
- CONTAMINATED LAND ASSESSMENT - PART 1
- CONTAMINATED LAND ASSESSMENT - PART 2
- CONTAMINATED LAND ASSESSMENT - PART 3
- CONTAMINATED LAND ASSESSMENT - PART 4
- CONTAMINATED LAND ASSESSMENT - PART 5
- CONTAMINATED LAND ASSESSMENT - PART 6
- CONTAMINATED LAND ASSESSMENT - PART 7
- CONTAMINATED LAND ASSESSMENT - PART 8
- CONTAMINATED LAND ASSESSMENT - PART 9
- DELIVERY AND SERVICING MANAGEMENT PLAN - PART 1
- DELIVERY AND SERVICING MANAGEMENT PLAN - PART 2
- DELIVERY AND SERVICING MANAGEMENT PLAN - PART 3
- DELIVERY AND SERVICING MANAGEMENT PLAN - PART 4
- DELIVERY AND SERVICING MANAGEMENT PLAN - PART 5
- BUILDING A PLANS
- BUILDING C PLANS
- BUILDING D2 PLANS
- BUILDING E PLANS
- DRAINAGE STRATEGY - PART 1
- DRAINAGE STRATEGY - PART 2
- DRAINAGE STRATEGY - PART 3
- DRAINAGE STRATEGY - PART 4
- DRAINAGE STRATEGY - PART 5
- DRAINAGE STRATEGY - PART 6
- DRAINAGE STRATEGY - PART 7
- ECOLOGICAL IMPACT ASSESSMENT
- NO-TECHNICAL SUMMARY - PART 1
- NO-TECHNICAL SUMMARY - PART 2
- NO-TECHNICAL SUMMARY - PART 3
- VOLUME 1 CH 01 INTRODUCTION PART 1
- VOLUME 1 CH 01 INTRODUCTION PART 2
- VOLUME 1 CH 02A EIA SCOPE
- VOLUME 1 CH 02B EIA METHODOLOGY
- VOLUME 1 CH 03 ALTERNATIVES
- VOLUME 1 CH 04 PROPOSED DEVELOPMENT
- VOLUME 1 CH 05 DEMOLITION, CONSTRUCTION & REFURBISHMENT
- VOLUME 1 CH 06 SOCIO- ECONOMICS
- VOLUME 1 CH 07 AIR QUALITY
- VOLUME 1 CH 08 NOISE AND VIBRATION
- VOLUME 1 CH 09 DSO
- VOLUME 1 CH 10 WIND
- VOLUME 1 CH 11 ARCHAEOLOGY
- VOLUME 1 CH 12 CLIMATE CHANGE
- VOLUME 1 CH 13 HUMAN HEALTH
- VOLUME 1 CH 14 TRAFFIC
- VOLUME 1 CH 15 EFFECT INTERACTIONS
- VOLUME 1 CH 16 LIKELY SIGNIFICANT EFFECTS
- VOLUME 1 CH 17 MITIGATION MONITORING
- VOLUME 2 HTVIA PART 1
- VOLUME 2 HTVIA PART 2
- VOLUME 2 HTVIA PART 3
- VOLUME 2 HTVIA PART 4
- VOLUME 2 HTVIA PART 5
- VOLUME 2 HTVIA PART 6
- VOLUME 2 HTVIA PART 7
- VOLUME 2 HTVIA PART 8
- VOLUME 2 HTVIA PART 9
- VOLUME 2 HTVIA PART 10
- VOLUME 2 HTVIA PART 11
- VOLUME 2 HTVIA PART 12
- VOLUME 3 APPENDIX AIR QUALITY ANNEX 1
- VOLUME 3 APPENDIX AIR QUALITY ANNEX 2
- VOLUME 3 APPENDIX AIR QUALITY ANNEX 3
- VOLUME 3 APPENDIX AIR QUALITY ANNEX 4
- VOLUME 3 APPENDIX AIR QUALITY ANNEX 5
- VOLUME 3 APPENDIX AIR QUALITY ANNEX 6
- VOLUME 3 APPENDIX ARCHAEOLOGY ANNEX 1 PART 1
- VOLUME 3 APPENDIX ARCHAEOLOGY ANNEX 1 PART 2
- VOLUME 3 APPENDIX ARCHAEOLOGY ANNEX 1 PART 3
- VOLUME 3 APPENDIX ARCHAEOLOGY ANNEX 2
- VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 1
- VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 2
- VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 3
- VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 4
- VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 5
- VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 6
- VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 7
- VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 8
- VOLUME 3 APPENDIX DSO ANNEX 1
- VOLUME 3 APPENDIX DSO ANNEX 2
- VOLUME 3 APPENDIX DSO ANNEX 3 PART 1
- VOLUME 3 APPENDIX DSO ANNEX 3 PART 2
- VOLUME 3 APPENDIX DSO ANNEX 3 PART 3
- VOLUME 3 APPENDIX DSO ANNEX 3 PART 4
- VOLUME 3 APPENDIX DSO ANNEX 4 PART 1
- VOLUME 3 APPENDIX DSO ANNEX 4 PART 2
- VOLUME 3 APPENDIX DSO ANNEX 4 PART 3
- VOLUME 3 APPENDIX DSO ANNEX 4 PART 4
- VOLUME 3 APPENDIX DSO ANNEX 5 PART 1
- VOLUME 3 APPENDIX DSO ANNEX 5 PART 2
- VOLUME 3 APPENDIX DSO ANNEX 5 PART 3
- VOLUME 3 APPENDIX DSO ANNEX 5 PART 4
- VOLUME 3 APPENDIX DSO ANNEX 5 PART 5
- VOLUME 3 APPENDIX DSO ANNEX 5 PART 6
- VOLUME 3 APPENDIX DSO ANNEX 5 PART 7
- VOLUME 3 APPENDIX DSO ANNEX 5 PART 8
- VOLUME 3 APPENDIX DSO ANNEX 5 PART 9
- VOLUME 3 APPENDIX DSO ANNEX 5 PART 10
- VOLUME 3 APPENDIX DSO ANNEX 5 PART 11
- VOLUME 3 APPENDIX DSO ANNEX 5 PART 12
- VOLUME 3 APPENDIX DSO ANNEX 5 PART 13
- VOLUME 3 APPENDIX DSO ANNEX 5 PART 14
- VOLUME 3 APPENDIX DSO ANNEX 5 PART 15
- VOLUME 3 APPENDIX DSO ANNEX 5 PART 16
- VOLUME 3 APPENDIX DSO ANNEX 6 PART 1
- VOLUME 3 APPENDIX DSO ANNEX 6 PART 2
- VOLUME 3 APPENDIX DSO ANNEX 6 PART 3
- VOLUME 3 APPENDIX DSO ANNEX 6 PART 4
- VOLUME 3 APPENDIX DSO ANNEX 6 PART 5
- VOLUME 3 APPENDIX DSO ANNEX 7 PART 1
- VOLUME 3 APPENDIX DSO ANNEX 7 PART 2
- VOLUME 3 APPENDIX DSO ANNEX 7 PART 3
- VOLUME 3 APPENDIX DSO ANNEX 7 PART 4
- VOLUME 3 APPENDIX DSO ANNEX 7 PART 5
- VOLUME 3 APPENDIX DSO ANNEX 7 PART 6
- VOLUME 3 APPENDIX DSO ANNEX 7 PART 7
- VOLUME 3 APPENDIX DSO ANNEX 8
- VOLUME 3 APPENDIX DSO ANNEX 9
- VOLUME 3 APPENDIX DSO ANNEX 10
- VOLUME 3 APPENDIX WIND ANNEX 1
- VOLUME 3 APPENDIX WIND ANNEX 2
- VOLUME 3 APPENDIX WIND ANNEX 3
- VOLUME 3 APPENDIX SOCIO-ECONOMICS ANNEX 1
- VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 1
- VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 2
- VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 3
- VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 4
- VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 5
- VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 6 PART 1
- VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 6 PART 2
- VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 6 PART 3
- VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 6 PART 4
- VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 6 PART 5
- VOLUME 3 APPENDIX INTRODUCTION ANNEX 1 PART 1
- VOLUME 3 APPENDIX INTRODUCTION ANNEX 1 PART 2
- VOLUME 3 APPENDIX INTRODUCTION ANNEX 2
- VOLUME 3 APPENDIX INTRODUCTION ANNEX 3
- VOLUME 3 APPENDIX HEALTH ANNEX 1
- VOLUME 3 APPENDIX EIA METHODOLOGY ANNEX 1
- PART 1
- PART 2
- PART 3
- GLA WLCA TEMPLATE - BUILDING A
- GLA WLCA TEMPLATE - BUILDING B
- GLA WLCA TEMPLATE - BUILDING C
- GLA WLCA TEMPLATE - BUILDING D1
- GLA WLCA TEMPLATE - BUILDING D2
- GLA WLCA TEMPLATE - BUILDING G
- HEALTH IMPACT ASSESSMENT
- HELIPAD WIND IMPACT TECHNICAL NOTE
- INTERNAL DAYLIGHT SUNLIGHT ASSESSMENT - PART 1
- INTERNAL DAYLIGHT SUNLIGHT ASSESSMENT - PART 2
- INTERNAL DAYLIGHT SUNLIGHT ASSESSMENT - PART 3
- INTERNAL DAYLIGHT SUNLIGHT ASSESSMENT - PART 4
- INTERNAL DAYLIGHT SUNLIGHT ASSESSMENT - PART 5
- LBTH BIODIVERSITY NET GAIN (BNG) CHECKLIST
- LONDON PLAN AND GATEWAY 1 FIRE STATEMENTS
- ILLUSTRATIVE LANDSCAPE MASTERPLAN - GROUND LEVEL
- ILLUSTRATIVE HARD LANDSCAPE MASTERPLAN
- ILLUSTRATIVE SOFT LANDSCAPE MASTERPLAN
- ILLUSTRATIVE LANDSCAPE MASTERPLAN - ROOF TERRACES
- ILLUSTRATIVE LANDSCAPE MASTERPLAN - COMBINED
- PROPOSED GROUND FLOOR PLAN - A BUILDING
- PROPOSED UNIT A-1B2P-M4(3)-01 - A BUILDING
- PROPOSED UNIT A-1B2P-M4(3)-02 - A BUILDING
- PROPOSED FLOOR 01 PLAN - A BUILDING
- PROPOSED FLOOR 02 PLAN - A BUILDING
- PROPOSED FLOOR 03 PLAN - A BUILDING
- PROPOSED FLOOR 04 PLAN - A BUILDING
- PROPOSED UNIT A-1B1P-04 - A BUILDING
- PROPOSED UNIT A-1B1P-05 - A BUILDING
- PROPOSED UNIT A-1B1P-06 - A BUILDING
- PROPOSED LOWER GROUND FLOOR PLAN - A BUILDING
- PROPOSED ROOF PLAN - A BUILDING
- PROPOSED UNIT A-1B1P-01 - A BUILDING
- PROPOSED UNIT A-1B1P-02 - A BUILDING
- PROPOSED UNIT A-1B1P-03 - A BUILDING
- PROPOSED NORTH ELEVATION - A BUILDING
- PROPOSED SOUTH ELEVATION - A BUILDING
- PROPOSED EAST ELEVATION - A BUILDING
- PROPOSED SECTIONS AA - A BUILDING
- PROPOSED SECTIONS BB - A BUILDING
- PROPOSED SECTIONS BB - C BUILDING
- PROPOSED SECTIONS AA - C BUILDING
- PROPOSED WEST ELEVATION - C BUILDING
- PROPOSED EAST ELEVATION - C BUILDING
- PROPOSED SOUTH ELEVATION - C BUILDING
- PROPOSED NORTH ELEVATION - C BUILDING
- PROPOSED UNIT C-3B5P-DUP-02 - C BUILDING
- PROPOSED UNIT C-3B5P-DUP-01 - C BUILDING
- PROPOSED UNIT C-2B3P-DUP-02 - C BUILDING
- PROPOSED UNIT C-2B3P-DUP-01 - C BUILDING
- PROPOSED UNIT C-4B6P-02 - C BUILDING
- PROPOSED UNIT C-4B6P-01 - C BUILDING
- PROPOSED UNIT C-3B5P-01 - C BUILDING
- PROPOSED UNIT C-3B4P-01 - C BUILDING
- PROPOSED UNIT C-2B4P-01 - C BUILDING
- PROPOSED UNIT C-2B3P-01 - C BUILDING
- PROPOSED UNIT C-1B2P-03 - C BUILDING
- PROPOSED UNIT C-1B2P-M4(3)-01 - C BUILDING
- PROPOSED ROOF PLAN - C BUILDING
- PROPOSED LOWER GROUND FLOOR PLAN - C BUILDING
- PROPOSED UNIT C-3B5P-02 - C BUILDING
- PROPOSED UNIT C-2B3P-02 - C BUILDING
- PROPOSED UNIT C-1B2P-02 - C BUILDING
- PROPOSED UNIT C-1B2P-01 - C BUILDING
- PROPOSED UNIT C-1B2P-M4(3)-02 - C BUILDING
- PROPOSED FLOOR 06 PLAN - C BUILDING
- PROPOSED FLOOR 05 PLAN - C BUILDING
- PROPOSED FLOOR 04 PLAN - C BUILDING
- PROPOSED FLOOR 03 PLAN - C BUILDING
- PROPOSED FLOOR 02 PLAN - C BUILDING
- PROPOSED FLOOR 01 PLAN - C BUILDING
- PROPOSED GROUND FLOOR PLAN - C BUILDING
- PROPOSED SECTIONS AA BB - D2 BUILDING
- PROPOSED WEST ELEVATION - D2 BUILDING
- PROPOSED EAST ELEVATION - D2 BUILDING
- PROPOSED SOUTH ELEVATION - D2 BUILDING
- PROPOSED NORTH ELEVATION - D2 BUILDING
- PROPOSED UNIT D2-2B4P-02 - D2 BUILDING
- PROPOSED UNIT D2-1B2P-05 - D2 BUILDING
- PROPOSED UNIT D2-1B1P-04 - D2 BUILDING
- PROPOSED UNIT D2-1B1P-03 - D2 BUILDING
- PROPOSED UNIT D2-1B1P-02 - D2 BUILDING
- PROPOSED UNIT D2-1B1P-01 - D2 BUILDING
- PROPOSED ROOF PLAN - D2 BUILDING
- PROPOSED BASEMENT PLAN - D2 BUILDING
- PROPOSED FLOOR 05 PLAN - D2 BUILDING
- PROPOSED FLOOR 04 PLAN - D2 BUILDING
- PROPOSED FLOOR 03 PLAN - D2 BUILDING
- PROPOSED FLOOR 02 PLAN - D2 BUILDING
- PROPOSED FLOOR 01 PLAN - D2 BUILDING
- PROPOSED UNIT D2-1B2P- M4(3)-04 - D2 BUILDING
- PROPOSED UNIT D2-1B2P- M4(3)-03 - D2 BUILDING
- PROPOSED UNIT D2-1B2P- M4(3)-02 - D2 BUILDING
- PROPOSED UNIT D2-1B2P- M4(3)-01 - D2 BUILDING
- PROPOSED GROUND FLOOR PLAN - D2 BUILDING
- PROPOSED SECTION CC - E BUILDING
- PROPOSED SECTIONS AA BB - E BUILDING
- PROPOSED NORTH SOUTH AND EAST ELEVATIONS - E BUILDING
- PROPOSED UNIT E-2B3P-01 - E BUILDING
- PROPOSED UNIT E-1B2P-02 - E BUILDING
- PROPOSED UNIT E-1B1P-01 - E BUILDING
- PROPOSED LOWER GROUND TO THIRD FLOOR - E BUILDING
- PROPOSED DEMOLITION PLANS - E BUILDING
- EXISTING SECTIONS - BUILDING E
- EXISTING NORTH SOUTH AND EAST ELEVATIONS - BUILDING E
- EXISTING FLOOR PLANS - BUILDING E
- SITE LOCATION PLAN - E BUILDING
- PROPOSED SECTION CC - B BUILDING
- PROPOSED SECTION BB - B BUILDING
- PROPOSED SECTION AA - B BUILDING
- PROPOSED WEST ELEVATION - B BUILDING
- PROPOSED SOUTH ELEVATION - B BUILDING
- PROPOSED EAST ELEVATION - B BUILDING
- PROPOSED NORTH ELEVATION - B BUILDING
- PROPOSED WEST ELEVATION - B BUILDING
- PROPOSED ACCESSIBLE UNITS (CANDD) - B BUILDING
- PROPOSED ACCESSIBLE UNITS (A AND B) - B BUILDING
- PROPOSED TYPICAL UNITS - B BUILDING
- PROPOSED ROOF PLAN - B BUILDING
- PROPOSED BASEMENT B1 FLOOR PLAN - BUILDING B
- PROPOSED FLOOR 16 PLAN - B BUILDING
- PROPOSED FLOOR 15 PLAN - B BUILDING
- PROPOSED FLOOR 14 PLAN - B BUILDING
- PROPOSED FLOOR 13 PLAN - B BUILDING
- PROPOSED FLOOR 12 PLAN - B BUILDING
- PROPOSED FLOOR 11 PLAN - B BUILDING
- PROPOSED FLOOR 10 PLAN - B BUILDING
- PROPOSED FLOOR 09 PLAN - B BUILDING
- PROPOSED FLOOR 08 PLAN - B BUILDING
- PROPOSED FLOOR 07 PLAN - B BUILDING
- PROPOSED FLOOR 06 PLAN - B BUILDING
- PROPOSED FLOOR 05 PLAN - B BUILDING
- PROPOSED FLOOR 04 PLAN - B BUILDING
- PROPOSED FLOOR 03 PLAN - B BUILDING
- PROPOSED FLOOR 02 PLAN - B BUILDING
- PROPOSED FLOOR 01 PLAN - B BUILDING
- PROPOSED FLOOR 00 PLAN - B BUILDING
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Tower Hamlets for determination, against a statutory target of eight weeks. Over the last year Tower Hamlets decided full applications in a median of 56 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
45 Philpot Street, London, E1 2JH
Proposed internal refurbishment to a Grade II listed dwelling within a conservation area. Works include the removal and alteration of non original internal partitions, minor internal reconfiguration, skimming using appropriate traditional materials, and upgrades to services. Repairs and sympathetic upgrades to windows (including secondary glazing) are proposed, alongside new floor finishes, replacement of non original doors, stair replacement, kitchen and bathroom renovations, and like for like timber repairs. All works are internal and intended to preserve the character and significance of the listed building.
Granted Heritage and listed buildings Windows or glazing 4 docsDomestic -
47A Philpot Street, London, E1 2JH
Works to T1x Sycamore Tree (TPO Ref No 36_45) Proposed works are limited to the selective pruning/removal of these lower young branches up to a maximum height of 2.4 metres above ground level.
Granted Trees 3 docs -
47 Walden Street, London, E1 2AL
93% historically approved · decision due ~6 Jul
Lower the cill of the existing lower ground floor rear window to form a doorway providing access to the rear garden. Replace the existing rear door with a timber sash window. Remove the redundant external garden stairs. Reconfigure the lower ground floor layout to create an interconnected kitchen and dining area.
Awaiting decision Heritage and listed buildings Windows or glazing 6 docs -
47 Walden Street, London, E1 2AL
Listed Building Consent sought for: Removal of ground-floor internal stud wall between reception rooms
Granted Heritage and listed buildings 8 docs -
45 Walden Street, London, E1 2AL
Application for a Minor Material Amendment (Section 73) to Planning Permission PA/25/00677 dated 11/06/2025 to vary Condition 2 (Approved Drawings). The approved scheme granted consent for the 'Refurbishment of a Georgian terraced house'. The amendment proposed seeks alterations to the design of the outbuilding.
Granted Amendments 4 docs -
45 Walden Street, London, E1 2AL
Application for a Minor Material Amendment (Section 19) to Listed Building Consent PA/25/00678 dated 11/06/2025 to vary Condition 2 (Approved Drawings). The approved scheme granted consent for the 'Refurbishment of a Georgian terraced house'. The amendment proposed seeks alterations to the design of the outbuilding.
Granted Conditions 6 docs
Other full applications
In Tower Hamlets
-
PA/26/00916/NC Granted
2 Athelstane Grove, London, E3 5JG
Conversion of existing butterfly roof with front and back mansard to utilise the loft area as habitable space.
-
PA/26/01504/NC Awaiting decision
412 Hackney Road, London, E2 7AP
Proposed for a new side extension, alterations to the existing side extension, installation of a new glazed screen and rooflight, and alterations to the street-facing façade.
-
PA/26/00497/NC Decided
72 Cambridge Heath Road, London, E1 5QJ
The change of use of the ground floor premises at 72 Cambridge Heath Road, London E1 5QJ from Use Class E (Commercial, Business and Service) to Sui Generis (Laundrette) including external flue.
-
PA/26/01526 Awaiting decision
37 Zealand Road, London, E3 5RA
Mansard roof extension, together with new front facing double-glazed timber sash dormer windows, rear facing double-glazed aluminium dormer windows, rear facing rooflights and roof integrated solar panels.
-
PA/26/01527 Awaiting decision
53 Ellesmere Road, London, E3 5QU
Proposed mansard roof extension