Skip to content
PlanIndex Get alerts
Menu

Planning application

The Whitechapel Estate, Land between Varden Street and Ashfield Street, Whitechapel, London E1 2JH

Awaiting decision Tower Hamlets PA/25/02236 Full Planning Permission

Works: Extension Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Phased redevelopment of the site comprising demolition of all existing buildings (save for 46-48a Ashfield Street); and development including 6 new buildings ranging between 5 and 22 storeys in height, comprising up to 111 x residential dwellings (Use Class C3), up to 167 x specialist accommodation units (Use Class C2), up to 230 x co-living units (Sui Generis), up to 21,961 sqm GEA of flexible office / life sciences / hospital floorspace (Use class E(g)/ E(e)), up to 30,433 sqm GEA of flexible hospital floorspace (Use Class E(e)), up to 1,911 sqm GEA of business floorspace (Use Class E), up to 1,882 sqm GEA of flexible community engagement, sport and leisure floorspace (Use Class F1/F2/E(d)/Sui Generis), up to 440 sqm GEA of flexible retail / food and beverage floorspace (Use Class F/E(a)/E(b)); change of use from office to residential (Use Class C3) and refurbishment of 46-48a Ashfield Street; extension to 46 Ashfield Street; refurbishment of 80a Ashfield Street; car parking, hard and soft landscaping and other necessary associated works [This application is accompanied by an Environmental Statement]

As published by the council, reference PA/25/02236

Application record

Reference
PA/25/02236
Type
Full Planning Permission
Status
Registered
Received
22 Dec 2025
Validated
22 Dec 2025
Ward
Whitechapel
Decision by
Strategic Development Committee
Postcode
E1 2JH

Timeline

Dates from the published record

  1. 22 Dec 2025

    Received by Tower Hamlets

  2. 25 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 16 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Tower Hamlets took a median of 56 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

DP9 Ltd Agent

Active · incorporated 2004

2,641 applications on PlanIndex · across 36 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

518 documents on file for this application

  • TRANSPORT COMMENTS RESPONSE V2 Correspondence · 23 Jul 2026
  • QUEEN MARY UNIVERSITY OF LONDON Consultee Comment · 20 Jul 2026
  • FINAL REVIEW REPORT 001 Environmental Statement · 19 Jun 2026
  • WHITECHAPEL ESTATE REDEVELOPMENT HOUSING STRATEGY NOTE Report · 04 Jun 2026
  • REVIEW OF ADDITIONAL MATERIAL Daylight & Sunlight · 11 May 2026
  • INDICATIVE TOWER CRANE LOCATIONS AND UNLOADING BAYS Current Plan · 24 Apr 2026
  • CONSOLIDATED SAP WORKSHEETS Correspondence · 16 Apr 2026
  • DAYLIGHT/SUNLIGHT COMPARISON TABLE Correspondence · 01 Apr 2026
  • ASSESSMENT REVIEW Daylight & Sunlight · 01 Apr 2026
  • BIODIVERSITY RESPONSE Correspondence · 01 Apr 2026
  • NOISE RESPONSE Correspondence · 01 Apr 2026
  • CONTAMINATED LAND RESPONSE Correspondence · 01 Apr 2026
  • ENERGY RESPONSE Correspondence · 01 Apr 2026
  • RESPONSE TO LBTH WASTE Correspondence · 01 Apr 2026
  • RESPONSE TO LBTH EHO SMELL AND POLLUTION Correspondence · 01 Apr 2026
  • RESPONSE TO LBTH HIGHWAYS OFFICER COMMENTS Correspondence · 01 Apr 2026
  • RESPONSE TO LBTH HOUSING COMMENTS Correspondence · 01 Apr 2026
  • RESPONSE TO REVIEW OF DAYLIGHT, SUNLIGHT, GLARE AND LIGHT POLLUTION ASSESSMENTS Correspondence · 01 Apr 2026
  • DAYLIGHT & SUNLIGHT ANALYSIS 1 Daylight & Sunlight · 01 Apr 2026
  • DAYLIGHT & SUNLIGHT ANALYSIS 3 Daylight & Sunlight · 01 Apr 2026
  • DAYLIGHT & SUNLIGHT ANALYSIS 2 Daylight & Sunlight · 01 Apr 2026
  • DAYLIGHT & SUNLIGHT ANALYSIS Photo · 01 Apr 2026
  • DAYLIGHT & SUNLIGHT ANALYSIS Photo · 01 Apr 2026
  • DAYLIGHT & SUNLIGHT ANALYSIS Photo · 01 Apr 2026
  • DAYLIGHT & SUNLIGHT ANALYSIS Photo · 01 Apr 2026
  • DAYLIGHT & SUNLIGHT ANALYSIS Photo · 01 Apr 2026
  • DAYLIGHT & SUNLIGHT ANALYSIS Photo · 01 Apr 2026
  • DAYLIGHT & SUNLIGHT ANALYSIS Photo · 01 Apr 2026
  • CE RESPONSES 20.03.2026 - WHITECHAPEL ESTATE - COMMENTS LOG Correspondence · 01 Apr 2026
  • CE RESPONSES 20.03.2026 - KEY COMPONENT STRATEGIES & END-OF-LIFE Correspondence · 01 Apr 2026
  • CE RESPONSES 20.03.2026 - GLA CE MEMO - STAGE 1 Correspondence · 01 Apr 2026
  • CE RESPONSES 20.03.2026 - APPENDIX C CIRCULAR ECONOMY WORKSHOP - CIRCULAR CONSIDERATION - PROJECT CROSS Correspondence · 01 Apr 2026
  • CE RESPONSES 20.03.2026 - APPENDIX C CIRCULAR ECONOMY WORKSHOP - PROJECT CROSS - INTRO TO CE Correspondence · 01 Apr 2026
  • CE RESPONSES 20.03.2026 - APPENDIX D RECYCLED CONTENT CALCULATIONS - RECYCLED CONTENT COMPILED Correspondence · 01 Apr 2026
  • CE RESPONSES 20.03.2026 - WHITECHAPEL ESTATE - CE GLA SPREADSHEETS REV 2 - BUILDING G Correspondence · 01 Apr 2026
  • CE RESPONSES 20.03.2026 - WHITECHAPEL ESTATE - CE GLA SPREADSHEETS REV 2 - BUILDING D2 Correspondence · 01 Apr 2026
  • CE RESPONSES 20.03.2026 - WHITECHAPEL ESTATE - CE GLA SPREADSHEETS REV 2 - BUILDING D1 Correspondence · 01 Apr 2026
  • CE RESPONSES 20.03.2026 - WHITECHAPEL ESTATE - CE GLA SPREADSHEETS REV 2 - BUILDING C Correspondence · 01 Apr 2026
  • CE RESPONSES 20.03.2026 - WHITECHAPEL ESTATE - CE GLA SPREADSHEETS REV 2 - BUILDING B Correspondence · 01 Apr 2026
  • CE RESPONSES 20.03.2026 - WHITECHAPEL ESTATE - CE GLA SPREADSHEETS REV 2 - BUILDING A Correspondence · 01 Apr 2026
  • ENERGY RESPONSES 20.03.2026 - GLA ENERGY CONSULTATION (STAGE 1) ENERGY MEMO 2025 Correspondence · 01 Apr 2026
  • ENERGY & SUSTAINABILITY STATEMENT & OVERHEATING MITIGATION - PART 1 Report · 01 Apr 2026
  • ENERGY & SUSTAINABILITY STATEMENT & OVERHEATING MITIGATION - PART 2 Report · 01 Apr 2026
  • ENERGY & SUSTAINABILITY STATEMENT & OVERHEATING MITIGATION - PART 3 Report · 01 Apr 2026
  • ENERGY & SUSTAINABILITY STATEMENT & OVERHEATING MITIGATION - PART 4 Report · 01 Apr 2026
  • PROJECT CROSS - SITEWIDE GLA CARBON EMISSION SPREADSHEET Correspondence · 01 Apr 2026
  • PV LAYOUT DETAILS Correspondence · 01 Apr 2026
  • GLA SPREADSHEETS - BUILDING C Correspondence · 01 Apr 2026
  • GLA SPREADSHEETS - BUILDING G Correspondence · 01 Apr 2026
  • GLA SPREADSHEETS - BUILDING F Correspondence · 01 Apr 2026
  • GLA SPREADSHEETS - BUILDING D2 Correspondence · 01 Apr 2026
  • GLA SPREADSHEETS - BUILDING D1 Correspondence · 01 Apr 2026
  • GLA SPREADSHEETS - BUILDING B Correspondence · 01 Apr 2026
  • GLA SPREADSHEETS - BUILDING A Correspondence · 01 Apr 2026
  • GLA SPREADSHEETS - BLOCK E Correspondence · 01 Apr 2026
  • GLA WLC MEMO Correspondence · 01 Apr 2026
  • WLC GLA SPREADSHEETS - BUILDING A Correspondence · 01 Apr 2026
  • WLC GLA SPREADSHEETS - BUILDING C Correspondence · 01 Apr 2026
  • REPONSE TO LBTH ARCHAEOLOGY COMMENTS Correspondence · 01 Apr 2026
  • RESPONSE TO LBTH VIABILITY REVIEW Correspondence · 01 Apr 2026
  • ES REVIEW RESPONSE - PART 1 Correspondence · 01 Apr 2026
  • ES REVIEW RESPONSE - PART 2 Correspondence · 01 Apr 2026
  • ES REVIEW RESPONSE - PART 3 Correspondence · 01 Apr 2026
  • ES REVIEW RESPONSE - PART 4 Correspondence · 01 Apr 2026
  • RESPONSE TO TFL 16 MARCH 2026 Correspondence · 18 Mar 2026
  • RESPONSE TO ACCESSIBLE HOUSING 18 MARCH 2026 Correspondence · 18 Mar 2026
  • REVIEW OF FINANCIAL VIABILITY ASSESSMENT (FVA) Report · 17 Mar 2026
  • HISTORIC ENGLAND (GLAAS) Consultee Comment · 16 Mar 2026
  • TFL Consultee Comment · 16 Mar 2026
  • INTERIM REVIEW REPORT Environmental Statement · 10 Mar 2026
  • THE GEORGIAN GROUP Consultee Comment · 05 Mar 2026
  • GLA LETTER 2 MARCH 2026 Correspondence · 04 Mar 2026
  • GLA PLANNING REPORT Report · 04 Mar 2026
  • ENVIRONMENT AGENCY Consultee Comment · 27 Feb 2026
  • THAMES WATER Consultee Comment · 26 Feb 2026
  • HISTORIC ENGLAND Consultee Comment · 16 Feb 2026
  • PORT OF LONDON AUTHORITY Consultee Comment · 09 Feb 2026
  • HSE Consultee Comment · 06 Feb 2026
  • LONDON CITY AIRPORT Consultee Comment · 02 Feb 2026
  • UK POWER NETWORKS Consultee Comment · 30 Jan 2026
  • SPORT ENGLAND Consultee Comment · 29 Jan 2026
  • ARQIVA Consultee Comment · 29 Jan 2026
  • CADENT GAS LTD Consultee Comment · 28 Jan 2026
  • NATURAL ENGLAND Consultee Comment · 28 Jan 2026
  • ACTIVE TRAVEL ENGLAND Consultee Comment · 27 Jan 2026
  • NATS Consultee Comment · 23 Jan 2026
  • HSE - NO INTEREST Consultee Comment · 08 Jan 2026
  • FINANCIAL VIABILITY ASSESSMENT Report · 02 Jan 2026
  • COVER LETTER Correspondence · 02 Jan 2026
  • PROPOSED SECTIONS - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED SECTIONS - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED SECTIONS - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED SECTIONS - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED WEST ELEVATION - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED SOUTH ELEVATION - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED EAST ELEVATION - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED NORTH ELEVATION - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED ACCESSIBLE UNITS (CANDD) - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED TYPICAL UNITS (AANDB) - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR ROOF PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR L17 PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR L16 PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR L15 PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR L14 PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR L13 PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR L12 PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR L11 PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR L10 PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR L09 PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR L08 PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 07 PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 06 PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 05 PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 04 PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 03 PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 02 PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 01 PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED GROUND FLOOR PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED BASEMENT B1 FLOOR PLAN - D1 BUILDING Current Plan · 24 Dec 2025
  • PROPOSED SECTIONS - F BUILDING (80A ASHFIELD ST) Current Plan · 24 Dec 2025
  • PROPOSED GROUND FLOOR FLOOR 01 AND ROOF PLAN - F BUILDING (80A ASHFIELD STREET) Current Plan · 24 Dec 2025
  • EXISTING SECTIONS - F BUILDING (80A ASHFIELD ST) Current Plan · 24 Dec 2025
  • EXISTING GROUND FLOOR FLOOR 01 AND ROOF PLAN - F BUILDING (80A ASHFIELD STREET) Current Plan · 24 Dec 2025
  • PROPOSED SECTIONS - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED SECTIONS - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED SECTIONS - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED SECTIONS - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED SECTIONS - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED SECTIONS - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED WEST ELEVATION - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED EAST ELEVATION - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED SOUTH ELEVATION - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED NORTH ELEVATION - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED ROOF PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 21 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 20 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 19 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 18 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 17 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 16 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 15 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 14 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 13 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 12 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 11 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 10 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 09 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 08 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 07 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 06 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 05 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 04 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 03 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 02 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED FLOOR 01 PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED GROUND FLOOR PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED BASEMENT B1 MEZZANINE FLOOR PLAN - G BUILDING Current Plan · 24 Dec 2025
  • PROPOSED BASEMENT B1 FLOOR PLAN - G BUILDING Current Plan · 24 Dec 2025
  • SITE LOCATION PLAN - PROPOSED Current Plan · 24 Dec 2025
  • SITE ELEVATION - WEST - DEMOLITION Current Plan · 24 Dec 2025
  • SITE ELEVATION - SOUTH - DEMOLITION Current Plan · 24 Dec 2025
  • SITE ELEVATION - EAST - DEMOLITION Current Plan · 24 Dec 2025
  • SITE ELEVATION - NORTH - DEMOLITION Current Plan · 24 Dec 2025
  • SITE LOCATION PLAN - DEMOLITION Current Plan · 24 Dec 2025
  • SITE PLAN - EXISTING Current Plan · 24 Dec 2025
  • SITE LOCATION PLAN - EXISTING Current Plan · 24 Dec 2025
  • RESIDENTIAL FRAMEWORK TRAVEL PLAN Report · 24 Dec 2025
  • RESIDENTIAL REUSE RECYCLING AND WASTE PLAN - PART 1 Report · 24 Dec 2025
  • RESIDENTIAL REUSE RECYCLING AND WASTE PLAN - PART 2 Report · 24 Dec 2025
  • SITEWIDE GLA CARBON EMISSION SPREADSHEET Report · 24 Dec 2025
  • STATEMENT OF COMMUNITY INVOLVEMENT Report · 24 Dec 2025
  • PART 1 Transport Statement · 24 Dec 2025
  • PART 2 Transport Statement · 24 Dec 2025
  • PART 3 Transport Statement · 24 Dec 2025
  • PART 4 Transport Statement · 24 Dec 2025
  • PART 5 Transport Statement · 24 Dec 2025
  • PART 6 Transport Statement · 24 Dec 2025
  • PART 7 Transport Statement · 24 Dec 2025
  • URBAN GREENING STATEMENT Current Plan · 24 Dec 2025
  • UTILITIES ASSESSMENT Report · 24 Dec 2025
  • FLUE AND VENTILATION EXHAUST LOCATIONS Current Plan · 24 Dec 2025
  • PART 1 Design & Access Statement · 24 Dec 2025
  • PART 2 Design & Access Statement · 24 Dec 2025
  • PART 3 Design & Access Statement · 24 Dec 2025
  • PART 4 Design & Access Statement · 24 Dec 2025
  • PART 5 Design & Access Statement · 24 Dec 2025
  • PART 6 Design & Access Statement · 24 Dec 2025
  • PART 7 Design & Access Statement · 24 Dec 2025
  • PART 8 Design & Access Statement · 24 Dec 2025
  • PART 9 Design & Access Statement · 24 Dec 2025
  • PART 10 Design & Access Statement · 24 Dec 2025
  • PART 11 Design & Access Statement · 24 Dec 2025
  • PART 12 Design & Access Statement · 24 Dec 2025
  • PART 13 Design & Access Statement · 24 Dec 2025
  • PART 14 Design & Access Statement · 24 Dec 2025
  • PART 15 Design & Access Statement · 24 Dec 2025
  • PART 16 Design & Access Statement · 24 Dec 2025
  • PART 17 Design & Access Statement · 24 Dec 2025
  • PART 18 Design & Access Statement · 24 Dec 2025
  • PART 19 Design & Access Statement · 24 Dec 2025
  • PART 20 Design & Access Statement · 24 Dec 2025
  • PART 21 Design & Access Statement · 24 Dec 2025
  • WHOLE LIFE CARBON ASSESSMENT Report · 24 Dec 2025
  • GLA WLCA TEMPLATE - BUILDING C Correspondence · 24 Dec 2025
  • GLA WLCA TEMPLATE - BUILDING D1 Correspondence · 24 Dec 2025
  • GLA WLCA TEMPLATE - BUILDING D2 Correspondence · 24 Dec 2025
  • GLA WLCA TEMPLATE - BUILDING G Correspondence · 24 Dec 2025
  • GLA WLCA TEMPLATE - BUILDING A Correspondence · 24 Dec 2025
  • GLA WLCA TEMPLATE - BUILDING B Correspondence · 24 Dec 2025
  • GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING G Correspondence · 24 Dec 2025
  • GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING G Correspondence · 24 Dec 2025
  • GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING D2 Correspondence · 24 Dec 2025
  • GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING D1 Correspondence · 24 Dec 2025
  • GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING C Correspondence · 24 Dec 2025
  • GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING B Correspondence · 24 Dec 2025
  • GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING A Correspondence · 24 Dec 2025
  • SITEWIDE GLA CARBON EMISSION SPREADSHEET DECEMBER 2025 Correspondence · 24 Dec 2025
  • THE STATUTORY BIODIVERSITY METRIC CALCULATION TOOL DECEMBER 2025 Correspondence · 24 Dec 2025
  • GAIN OF RESIDENTIAL Correspondence · 23 Dec 2025
  • LOSS OF RESIDENTIAL Correspondence · 23 Dec 2025
  • ARBORICULTURAL IMPACT ASSESSMENT AND TREE SURVEY Report · 23 Dec 2025
  • AVIATION SAFEGUARDING ASSESSMENT Report · 23 Dec 2025
  • BIODIVERSITY NET GAIN ASSESSMENT Report · 23 Dec 2025
  • BUILDING B - ELEVATIONS Current Plan · 23 Dec 2025
  • BUILDING B - PLANS Current Plan · 23 Dec 2025
  • BUILDING B - SECTIONS Current Plan · 23 Dec 2025
  • BUILDING B - UNIT LAYOUTS Current Plan · 23 Dec 2025
  • BUILDING MANAGEMENT PLANS Report · 23 Dec 2025
  • CIRCULAR ECONOMY STATEMENT - PART 1 Report · 23 Dec 2025
  • CIRCULAR ECONOMY STATEMENT - PART 2 Report · 23 Dec 2025
  • CIRCULAR ECONOMY STATEMENT - PART 3 Report · 23 Dec 2025
  • CIRCULAR ECONOMY STATEMENT - PART 4 Report · 23 Dec 2025
  • CIRCULAR ECONOMY STATEMENT - PART 5 Report · 23 Dec 2025
  • COMMERCIAL FRAMEWORK TRAVEL PLAN Report · 23 Dec 2025
  • COMMERCIAL REUSE RECYCLING AND WASTE PLAN Report · 23 Dec 2025
  • CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - PART 1 Report · 23 Dec 2025
  • CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - PART 2 Report · 23 Dec 2025
  • CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - PART 3 Report · 23 Dec 2025
  • CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - PART 4 Report · 23 Dec 2025
  • CONTAMINATED LAND ASSESSMENT - PART 1 Report · 23 Dec 2025
  • CONTAMINATED LAND ASSESSMENT - PART 2 Report · 23 Dec 2025
  • CONTAMINATED LAND ASSESSMENT - PART 3 Report · 23 Dec 2025
  • CONTAMINATED LAND ASSESSMENT - PART 4 Report · 23 Dec 2025
  • CONTAMINATED LAND ASSESSMENT - PART 5 Report · 23 Dec 2025
  • CONTAMINATED LAND ASSESSMENT - PART 6 Report · 23 Dec 2025
  • CONTAMINATED LAND ASSESSMENT - PART 7 Report · 23 Dec 2025
  • CONTAMINATED LAND ASSESSMENT - PART 8 Report · 23 Dec 2025
  • CONTAMINATED LAND ASSESSMENT - PART 9 Report · 23 Dec 2025
  • DELIVERY AND SERVICING MANAGEMENT PLAN - PART 1 Report · 23 Dec 2025
  • DELIVERY AND SERVICING MANAGEMENT PLAN - PART 2 Report · 23 Dec 2025
  • DELIVERY AND SERVICING MANAGEMENT PLAN - PART 3 Report · 23 Dec 2025
  • DELIVERY AND SERVICING MANAGEMENT PLAN - PART 4 Report · 23 Dec 2025
  • DELIVERY AND SERVICING MANAGEMENT PLAN - PART 5 Report · 23 Dec 2025
  • BUILDING A PLANS Current Plan · 23 Dec 2025
  • BUILDING C PLANS Current Plan · 23 Dec 2025
  • BUILDING D2 PLANS Current Plan · 23 Dec 2025
  • BUILDING E PLANS Current Plan · 23 Dec 2025
  • DRAINAGE STRATEGY - PART 1 Report · 23 Dec 2025
  • DRAINAGE STRATEGY - PART 2 Report · 23 Dec 2025
  • DRAINAGE STRATEGY - PART 3 Report · 23 Dec 2025
  • DRAINAGE STRATEGY - PART 4 Report · 23 Dec 2025
  • DRAINAGE STRATEGY - PART 5 Report · 23 Dec 2025
  • DRAINAGE STRATEGY - PART 6 Report · 23 Dec 2025
  • DRAINAGE STRATEGY - PART 7 Report · 23 Dec 2025
  • ECOLOGICAL IMPACT ASSESSMENT Report · 23 Dec 2025
  • NO-TECHNICAL SUMMARY - PART 1 Environmental Statement · 23 Dec 2025
  • NO-TECHNICAL SUMMARY - PART 2 Environmental Statement · 23 Dec 2025
  • NO-TECHNICAL SUMMARY - PART 3 Environmental Statement · 23 Dec 2025
  • VOLUME 1 CH 01 INTRODUCTION PART 1 Environmental Statement · 23 Dec 2025
  • VOLUME 1 CH 01 INTRODUCTION PART 2 Environmental Statement · 23 Dec 2025
  • VOLUME 1 CH 02A EIA SCOPE Environmental Statement · 23 Dec 2025
  • VOLUME 1 CH 02B EIA METHODOLOGY Environmental Statement · 23 Dec 2025
  • VOLUME 1 CH 03 ALTERNATIVES Environmental Statement · 23 Dec 2025
  • VOLUME 1 CH 04 PROPOSED DEVELOPMENT Environmental Statement · 23 Dec 2025
  • VOLUME 1 CH 05 DEMOLITION, CONSTRUCTION & REFURBISHMENT Environmental Statement · 23 Dec 2025
  • VOLUME 1 CH 06 SOCIO- ECONOMICS Environmental Statement · 23 Dec 2025
  • VOLUME 1 CH 07 AIR QUALITY Environmental Statement · 23 Dec 2025
  • VOLUME 1 CH 08 NOISE AND VIBRATION Environmental Statement · 23 Dec 2025
  • VOLUME 1 CH 09 DSO Environmental Statement · 23 Dec 2025
  • VOLUME 1 CH 10 WIND Environmental Statement · 23 Dec 2025
  • VOLUME 1 CH 11 ARCHAEOLOGY Environmental Statement · 23 Dec 2025
  • VOLUME 1 CH 12 CLIMATE CHANGE Environmental Statement · 23 Dec 2025
  • VOLUME 1 CH 13 HUMAN HEALTH Environmental Statement · 23 Dec 2025
  • VOLUME 1 CH 14 TRAFFIC Environmental Statement · 23 Dec 2025
  • VOLUME 1 CH 15 EFFECT INTERACTIONS Environmental Statement · 23 Dec 2025
  • VOLUME 1 CH 16 LIKELY SIGNIFICANT EFFECTS Environmental Statement · 23 Dec 2025
  • VOLUME 1 CH 17 MITIGATION MONITORING Environmental Statement · 23 Dec 2025
  • VOLUME 2 HTVIA PART 1 Environmental Statement · 23 Dec 2025
  • VOLUME 2 HTVIA PART 2 Environmental Statement · 23 Dec 2025
  • VOLUME 2 HTVIA PART 3 Environmental Statement · 23 Dec 2025
  • VOLUME 2 HTVIA PART 4 Environmental Statement · 23 Dec 2025
  • VOLUME 2 HTVIA PART 5 Environmental Statement · 23 Dec 2025
  • VOLUME 2 HTVIA PART 6 Environmental Statement · 23 Dec 2025
  • VOLUME 2 HTVIA PART 7 Environmental Statement · 23 Dec 2025
  • VOLUME 2 HTVIA PART 8 Environmental Statement · 23 Dec 2025
  • VOLUME 2 HTVIA PART 9 Environmental Statement · 23 Dec 2025
  • VOLUME 2 HTVIA PART 10 Environmental Statement · 23 Dec 2025
  • VOLUME 2 HTVIA PART 11 Environmental Statement · 23 Dec 2025
  • VOLUME 2 HTVIA PART 12 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX AIR QUALITY ANNEX 1 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX AIR QUALITY ANNEX 2 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX AIR QUALITY ANNEX 3 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX AIR QUALITY ANNEX 4 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX AIR QUALITY ANNEX 5 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX AIR QUALITY ANNEX 6 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX ARCHAEOLOGY ANNEX 1 PART 1 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX ARCHAEOLOGY ANNEX 1 PART 2 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX ARCHAEOLOGY ANNEX 1 PART 3 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX ARCHAEOLOGY ANNEX 2 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 1 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 2 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 3 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 4 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 5 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 6 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 7 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 8 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 1 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 2 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 3 PART 1 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 3 PART 2 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 3 PART 3 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 3 PART 4 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 4 PART 1 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 4 PART 2 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 4 PART 3 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 4 PART 4 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 5 PART 1 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 5 PART 2 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 5 PART 3 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 5 PART 4 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 5 PART 5 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 5 PART 6 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 5 PART 7 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 5 PART 8 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 5 PART 9 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 5 PART 10 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 5 PART 11 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 5 PART 12 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 5 PART 13 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 5 PART 14 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 5 PART 15 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 5 PART 16 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 6 PART 1 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 6 PART 2 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 6 PART 3 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 6 PART 4 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 6 PART 5 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 7 PART 1 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 7 PART 2 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 7 PART 3 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 7 PART 4 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 7 PART 5 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 7 PART 6 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 7 PART 7 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 8 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 9 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX DSO ANNEX 10 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX WIND ANNEX 1 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX WIND ANNEX 2 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX WIND ANNEX 3 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX SOCIO-ECONOMICS ANNEX 1 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 1 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 2 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 3 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 4 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 5 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 6 PART 1 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 6 PART 2 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 6 PART 3 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 6 PART 4 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 6 PART 5 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX INTRODUCTION ANNEX 1 PART 1 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX INTRODUCTION ANNEX 1 PART 2 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX INTRODUCTION ANNEX 2 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX INTRODUCTION ANNEX 3 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX HEALTH ANNEX 1 Environmental Statement · 23 Dec 2025
  • VOLUME 3 APPENDIX EIA METHODOLOGY ANNEX 1 Environmental Statement · 23 Dec 2025
  • PART 1 Flood Risk Assessment · 23 Dec 2025
  • PART 2 Flood Risk Assessment · 23 Dec 2025
  • PART 3 Flood Risk Assessment · 23 Dec 2025
  • GLA WLCA TEMPLATE - BUILDING A Report · 23 Dec 2025
  • GLA WLCA TEMPLATE - BUILDING B Report · 23 Dec 2025
  • GLA WLCA TEMPLATE - BUILDING C Report · 23 Dec 2025
  • GLA WLCA TEMPLATE - BUILDING D1 Report · 23 Dec 2025
  • GLA WLCA TEMPLATE - BUILDING D2 Report · 23 Dec 2025
  • GLA WLCA TEMPLATE - BUILDING G Report · 23 Dec 2025
  • HEALTH IMPACT ASSESSMENT Report · 23 Dec 2025
  • HELIPAD WIND IMPACT TECHNICAL NOTE Report · 23 Dec 2025
  • INTERNAL DAYLIGHT SUNLIGHT ASSESSMENT - PART 1 Daylight & Sunlight · 23 Dec 2025
  • INTERNAL DAYLIGHT SUNLIGHT ASSESSMENT - PART 2 Daylight & Sunlight · 23 Dec 2025
  • INTERNAL DAYLIGHT SUNLIGHT ASSESSMENT - PART 3 Daylight & Sunlight · 23 Dec 2025
  • INTERNAL DAYLIGHT SUNLIGHT ASSESSMENT - PART 4 Daylight & Sunlight · 23 Dec 2025
  • INTERNAL DAYLIGHT SUNLIGHT ASSESSMENT - PART 5 Daylight & Sunlight · 23 Dec 2025
  • LBTH BIODIVERSITY NET GAIN (BNG) CHECKLIST Correspondence · 23 Dec 2025
  • LONDON PLAN AND GATEWAY 1 FIRE STATEMENTS Report · 23 Dec 2025
  • ILLUSTRATIVE LANDSCAPE MASTERPLAN - GROUND LEVEL Current Plan · 23 Dec 2025
  • ILLUSTRATIVE HARD LANDSCAPE MASTERPLAN Current Plan · 23 Dec 2025
  • ILLUSTRATIVE SOFT LANDSCAPE MASTERPLAN Current Plan · 23 Dec 2025
  • ILLUSTRATIVE LANDSCAPE MASTERPLAN - ROOF TERRACES Current Plan · 23 Dec 2025
  • ILLUSTRATIVE LANDSCAPE MASTERPLAN - COMBINED Current Plan · 23 Dec 2025
  • PROPOSED GROUND FLOOR PLAN - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT A-1B2P-M4(3)-01 - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT A-1B2P-M4(3)-02 - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 01 PLAN - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 02 PLAN - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 03 PLAN - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 04 PLAN - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT A-1B1P-04 - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT A-1B1P-05 - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT A-1B1P-06 - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED LOWER GROUND FLOOR PLAN - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED ROOF PLAN - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT A-1B1P-01 - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT A-1B1P-02 - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT A-1B1P-03 - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED NORTH ELEVATION - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED SOUTH ELEVATION - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED EAST ELEVATION - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED SECTIONS AA - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED SECTIONS BB - A BUILDING Current Plan · 23 Dec 2025
  • PROPOSED SECTIONS BB - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED SECTIONS AA - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED WEST ELEVATION - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED EAST ELEVATION - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED SOUTH ELEVATION - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED NORTH ELEVATION - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT C-3B5P-DUP-02 - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT C-3B5P-DUP-01 - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT C-2B3P-DUP-02 - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT C-2B3P-DUP-01 - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT C-4B6P-02 - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT C-4B6P-01 - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT C-3B5P-01 - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT C-3B4P-01 - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT C-2B4P-01 - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT C-2B3P-01 - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT C-1B2P-03 - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT C-1B2P-M4(3)-01 - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED ROOF PLAN - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED LOWER GROUND FLOOR PLAN - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT C-3B5P-02 - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT C-2B3P-02 - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT C-1B2P-02 - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT C-1B2P-01 - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT C-1B2P-M4(3)-02 - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 06 PLAN - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 05 PLAN - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 04 PLAN - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 03 PLAN - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 02 PLAN - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 01 PLAN - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED GROUND FLOOR PLAN - C BUILDING Current Plan · 23 Dec 2025
  • PROPOSED SECTIONS AA BB - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED WEST ELEVATION - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED EAST ELEVATION - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED SOUTH ELEVATION - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED NORTH ELEVATION - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT D2-2B4P-02 - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT D2-1B2P-05 - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT D2-1B1P-04 - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT D2-1B1P-03 - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT D2-1B1P-02 - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT D2-1B1P-01 - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED ROOF PLAN - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED BASEMENT PLAN - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 05 PLAN - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 04 PLAN - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 03 PLAN - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 02 PLAN - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 01 PLAN - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT D2-1B2P- M4(3)-04 - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT D2-1B2P- M4(3)-03 - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT D2-1B2P- M4(3)-02 - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT D2-1B2P- M4(3)-01 - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED GROUND FLOOR PLAN - D2 BUILDING Current Plan · 23 Dec 2025
  • PROPOSED SECTION CC - E BUILDING Current Plan · 23 Dec 2025
  • PROPOSED SECTIONS AA BB - E BUILDING Current Plan · 23 Dec 2025
  • PROPOSED NORTH SOUTH AND EAST ELEVATIONS - E BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT E-2B3P-01 - E BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT E-1B2P-02 - E BUILDING Current Plan · 23 Dec 2025
  • PROPOSED UNIT E-1B1P-01 - E BUILDING Current Plan · 23 Dec 2025
  • PROPOSED LOWER GROUND TO THIRD FLOOR - E BUILDING Current Plan · 23 Dec 2025
  • PROPOSED DEMOLITION PLANS - E BUILDING Current Plan · 23 Dec 2025
  • EXISTING SECTIONS - BUILDING E Current Plan · 23 Dec 2025
  • EXISTING NORTH SOUTH AND EAST ELEVATIONS - BUILDING E Current Plan · 23 Dec 2025
  • EXISTING FLOOR PLANS - BUILDING E Current Plan · 23 Dec 2025
  • SITE LOCATION PLAN - E BUILDING Current Plan · 23 Dec 2025
  • PROPOSED SECTION CC - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED SECTION BB - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED SECTION AA - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED WEST ELEVATION - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED SOUTH ELEVATION - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED EAST ELEVATION - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED NORTH ELEVATION - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED WEST ELEVATION - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED ACCESSIBLE UNITS (CANDD) - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED ACCESSIBLE UNITS (A AND B) - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED TYPICAL UNITS - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED ROOF PLAN - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED BASEMENT B1 FLOOR PLAN - BUILDING B Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 16 PLAN - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 15 PLAN - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 14 PLAN - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 13 PLAN - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 12 PLAN - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 11 PLAN - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 10 PLAN - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 09 PLAN - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 08 PLAN - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 07 PLAN - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 06 PLAN - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 05 PLAN - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 04 PLAN - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 03 PLAN - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 02 PLAN - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 01 PLAN - B BUILDING Current Plan · 23 Dec 2025
  • PROPOSED FLOOR 00 PLAN - B BUILDING Current Plan · 23 Dec 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Tower Hamlets for determination, against a statutory target of eight weeks. Over the last year Tower Hamlets decided full applications in a median of 56 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 45 Philpot Street, London, E1 2JH

    PA/26/00655/NC Submitted 11 May 2026 50 yards away

    Proposed internal refurbishment to a Grade II listed dwelling within a conservation area. Works include the removal and alteration of non original internal partitions, minor internal reconfiguration, skimming using appropriate traditional materials, and upgrades to services. Repairs and sympathetic upgrades to windows (including secondary glazing) are proposed, alongside new floor finishes, replacement of non original doors, stair replacement, kitchen and bathroom renovations, and like for like timber repairs. All works are internal and intended to preserve the character and significance of the listed building.

    Granted Heritage and listed buildings Windows or glazing 4 docs
    Domestic
  • 47A Philpot Street, London, E1 2JH

    PA/26/00629/NC Submitted 7 Apr 2026 50 yards away

    Works to T1x Sycamore Tree (TPO Ref No 36_45) Proposed works are limited to the selective pruning/removal of these lower young branches up to a maximum height of 2.4 metres above ground level.

    Granted Trees 3 docs
  • 47 Walden Street, London, E1 2AL

    PA/26/00764/NC Submitted 11 May 2026 50 yards away

    93% historically approved · decision due ~6 Jul

    Lower the cill of the existing lower ground floor rear window to form a doorway providing access to the rear garden. Replace the existing rear door with a timber sash window. Remove the redundant external garden stairs. Reconfigure the lower ground floor layout to create an interconnected kitchen and dining area.

    Awaiting decision Heritage and listed buildings Windows or glazing 6 docs
  • 47 Walden Street, London, E1 2AL

    PA/25/01891/NC Submitted 31 Oct 2025 50 yards away

    Listed Building Consent sought for: Removal of ground-floor internal stud wall between reception rooms

    Granted Heritage and listed buildings 8 docs
  • 45 Walden Street, London, E1 2AL

    PA/26/00577/NC Submitted 30 Mar 2026 50 yards away

    Application for a Minor Material Amendment (Section 73) to Planning Permission PA/25/00677 dated 11/06/2025 to vary Condition 2 (Approved Drawings). The approved scheme granted consent for the 'Refurbishment of a Georgian terraced house'. The amendment proposed seeks alterations to the design of the outbuilding.

    Granted Amendments 4 docs
  • 45 Walden Street, London, E1 2AL

    PA/26/00696/NC Submitted 6 May 2026 50 yards away

    Application for a Minor Material Amendment (Section 19) to Listed Building Consent PA/25/00678 dated 11/06/2025 to vary Condition 2 (Approved Drawings). The approved scheme granted consent for the 'Refurbishment of a Georgian terraced house'. The amendment proposed seeks alterations to the design of the outbuilding.

    Granted Conditions 6 docs

In Tower Hamlets

  • PA/26/00916/NC Granted

    2 Athelstane Grove, London, E3 5JG

    Conversion of existing butterfly roof with front and back mansard to utilise the loft area as habitable space.

    Received 3 Jun, published by the council 25 Jul 2026 Full applications
  • PA/26/01504/NC Awaiting decision

    412 Hackney Road, London, E2 7AP

    Proposed for a new side extension, alterations to the existing side extension, installation of a new glazed screen and rooflight, and alterations to the street-facing façade.

    Received 4 Sep, published by the council 11 Oct 2026 Full applications
  • PA/26/00497/NC Decided

    72 Cambridge Heath Road, London, E1 5QJ

    The change of use of the ground floor premises at 72 Cambridge Heath Road, London E1 5QJ from Use Class E (Commercial, Business and Service) to Sui Generis (Laundrette) including external flue.

    Received 25 Mar, published by the council 25 Jul 2026 Full applications
  • PA/26/01526 Awaiting decision

    37 Zealand Road, London, E3 5RA

    Mansard roof extension, together with new front facing double-glazed timber sash dormer windows, rear facing double-glazed aluminium dormer windows, rear facing rooflights and roof integrated solar panels.

    Received 1 Sep, published by the council 4 Sep 2026 Full applications
  • PA/26/01527 Awaiting decision

    53 Ellesmere Road, London, E3 5QU

    Proposed mansard roof extension

    Received 1 Sep, published by the council 4 Sep 2026 Full applications