Planning application
Standon House, 21 Mansell Street, London, E1 8AN
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of the existing building and erection of a new building of up to 21 storeys, plus two storey basement, to provide office and retail space (Use Class E) and a new hotel (Use Class C1) with restaurant (Use Class E); along with roof level plant enclosures, refuse and recycling facilities, cycle parking, servicing, landscaping, and other associated works.
As published by the council, reference PA/25/02104/A1
Application record
- Reference
- PA/25/02104/A1
- Type
- Full Planning Permission
- Status
- Registered
- Received
- 5 Dec 2025
- Validated
- 5 Dec 2025
- Ward
- Whitechapel
- Decision by
- Strategic Development Committee
- Postcode
- E1 8AN
Timeline
Dates from the published record
-
5 Dec 2025
Received by Tower Hamlets
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 30 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Tower Hamlets took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,625 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
155 documents on file for this application
- DRAFT S106 AGREEMENT
- GLA STAGE 2 REFERRAL EMAIL
- HISTORIC ENGLAND - 01.07.2026
- URBAN GREENING FACTOR CALCULATOR
- HISTORIC ROYAL PALACES OBJECTION
- MASTER ACCOMODATION SCHEDULE
- BASEMENT IMPACT ASSESSMENT
- COVERING LETTER - 22.06.2026
- ADDENDUM
- PROPOSED GROUND FLOOR PLAN
- PROPOSED LEVEL 1 FLOOR PLAN
- PROPOSED LEVEL 2 FLOOR PLAN
- PROPOSED LEVEL 3-4 FLOOR PLAN
- PROPOSED LEVEL 5 FLOOR PLAN
- PROPOSED LEVEL 6-14 FLOOR PLAN
- PROPOSED LEVEL 15 FLOOR PLAN
- PROPOSED LEVEL 16 FLOOR PLAN
- PROPOSED LEVEL 17 FLOOR PLAN
- PROPOSED LEVEL 18 FLOOR PLAN
- PROPOSED LEVEL 19 FLOOR PLAN
- PROPOSED PLANT LEVEL 20
- BASEMENT 02 FLOOR PLAN
- BASEMENT 01 FLOOR PLAN
- PROPOSED ROOF PLAN
- PROPOSED E1 ELEVATION
- PROPOSED E2 ELEVATION
- PROPOSED E3 ELEVATION
- PROPOSED E4 ELEVATION
- PROPOSED SECTIONS
- PROPOSED E1 AND E2 BAY STUDIES
- PROPOSED E3 AND E4 BAY STUDIES
- AND DRAINAGE STRATEGY
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT ADDENDUM
- APPLICANT RESPONSE TO HRP COMMENTS
- CONSULTATION LETTER FROM CITY OF LONDON DATED: 13 MAR 2026
- ARCHAEOLOGICAL DESK-BASED ASSESSMENT
- TECHNICAL NOTE
- AIR QUALITY ADDENDUM
- TFL PRE-APP RESPONSE - TECHNICAL NOTE
- MODIFIED RATIONAL METHOD EQUATION
- TFL
- GLA CIRCULAR ECONOMY
- CIRCULAR ECONOMY STATEMENT
- GLA CE MEMO_STAGE 1
- GLA CONSULTATION (STAGE 1) - ENERGY MEMO 2026
- MARKETING LETTER
- HISTORIC ENGLAND GLAAS - 19.02.2026
- TFL
- GLA STAGE 1 REPORT
- GLA STAGE 1 LETTER
- HISTORIC ROYAL PALACES
- LONDON UNDERGROUND
- HISTORIC ENGLAND ADVICE
- RETURNED MAIL
- HISTORIC ENGLAND
- LONDON CITY AIRPORT
- NATS SAFEGUARDING
- GLA
- AIR QUALITY ASSESSMENT
- CIRCULAR ECONOMY STATEMENT
- GLA CIRCULAR ECONOMY SPREADSHEET
- LANDSCAPE STATEMENT
- OPERATIONAL WASTE MANAGEMENT STRATEGY
- OUTLINE SITE WASTE MANAGEMENT PLAN
- PRE-DEMOLITION AUDIT
- PRE-REDEVELOPMENT AUDIT
- WHOLE LIFE-CYCLE CARBON ASSESSMENT
- GLA WHOLE LIFE-CYCLE CARBON ASSESSMENT SPREADSHEET
- ARBORICULTURAL IMPACT ASSESSMENT
- BREEAM V7 PRE-ASSESSMENT REPORT
- PART 1
- PART 2
- PART 3
- PART 4
- PART 1
- PART 2
- PART 3
- PART 4
- EXISTING GROUND FLOOR PLAN
- EXISTING FIRST FLOOR PLAN
- EXISTING SECOND FLOOR PLAN
- EXISTING THIRD FLOOR PLAN
- EXISTING FOURTH FLOOR PLAN
- EXISTING FIFTH FLOOR PLAN
- EXISTING SIXTH FLOOR PLAN
- EXISTING BASEMENT FLOOR PLAN
- EXISTING ROOF PLAN
- EXISTING LOCATION PLAN
- EXISTING SITE PLAN
- EXISTING E1 ELEVATION
- EXISTING E2 ELEVATION
- EXISTING E3 ELEVATION
- EXISTING E4 ELEVATION
- EXISTING SECTIONS
- PROPOSED PLANT LEVEL 21
- PROPOSED ROOF PLAN
- PROPOSED SITE PLAN
- ENERGY STATEMENT
- FIRE STATEMENT
- FRAMEWORK TRAVEL PLAN
- DETAILED HEALTH IMPACT ASSESSMENT
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 11
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 2
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 3
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 4
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 5
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 6
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 7
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 8
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 9
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 10
- PRELIMINARY INVESTIGATION REPORT - PART 1
- PRELIMINARY INVESTIGATION REPORT - PART 2
- PRELIMINARY INVESTIGATION REPORT - PART 3
- PRELIMINARY INVESTIGATION REPORT - PART 4
- PRELIMINARY INVESTIGATION REPORT - PART 5
- PRELIMINARY INVESTIGATION REPORT - PART 6
- PRELIMINARY INVESTIGATION REPORT - PART 7
- PRELIMINARY INVESTIGATION REPORT - PART 8
- PRELIMINARY INVESTIGATION REPORT - PART 9
- PRELIMINARY INVESTIGATION REPORT - PART 10
- LIGHTING ASSESSMENT
- NOISE IMPACT ASSESSMENT
- OFFICE MARKET REPORT
- OUTLINE CONSTRUCTION LOGISTICS PLAN
- OUTLINE DELIVERY AND SERVICING PLAN
- PRELIMINARY ECOLOGICAL APPRAISAL
- STATEMENT OF COMMUNITY INVOLVEMENT
- SUSTAINABILITY STATEMENT
- THERMAL COMFORT ASSESSMENT
- TRANSPORT ASSESSMENT - PART 1
- TRANSPORT ASSESSMENT - PART 2
- UTILITY ASSESSMENT - PART 1
- UTILITY ASSESSMENT - PART 2
- UTILITY ASSESSMENT - PART 3
- UTILITY ASSESSMENT - PART 4
- UTILITY ASSESSMENT - PART 5
- UTILITY ASSESSMENT - PART 6
- UTILITY ASSESSMENT - PART 7
- UTILITY ASSESSMENT - PART 8
- UTILITY ASSESSMENT - PART 9
- UTILITY ASSESSMENT - PART 10
- UTILITY ASSESSMENT - PART 11
- UTILITY ASSESSMENT - PART 12
- UTILITY ASSESSMENT - PART 13
- UTILITY ASSESSMENT - PART 14
- UTILITY ASSESSMENT - PART 15
- UTILITY ASSESSMENT - PART 16
- UTILITY ASSESSMENT - PART 17
- UTILITY ASSESSMENT - PART 18
- WIND IMPACT ASSESSMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Tower Hamlets for determination, against a statutory target of eight weeks. Over the last year Tower Hamlets decided full applications in a median of 56 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Somerset House 18 Mansell Street London E1 8AA
Consultation from the London Borough of Tower Hamlets on a planning application for the variation of Condition 2 of planning permission PA/21/01713 dated 13/06/2025 (as amended by non-material amendment PA/26/00170), which granted permission for 'Demolition of the existing buildings and redevelopment of the site to provide a building ranging from basement, ground plus 19 storeys, comprising office (Class E) and visitor accommodation (Class C1); associated cycle and car parking, hard and soft landscaping and other associated works.' Amendments to include increases in the number of hotel rooms and office floorspace; increases to building height and depth including an additional storey and mezzanine and enlarged fifth and sixth floor; alterations to servicing and parking arrangements; substation relocation; and associated changes to internal layouts, roof plant and external elevations. (LBTH Ref. PA/26/00386/S).
Granted Demolition 2 docs -
1 Alie Street, London, E1 8DE
Submission of details pursuant to Condition 7 (Disabled Parking Space) of planning permission ref: PA/23/01303 (appeal ref: APP/E5900/W/24/3351303), dated 20/02/2025.
Granted Conditions 3 docs -
1 Alie Street, London, E1 8DE
Submission of details pursuant to Condition 5 (Delivery and Servicing Plan) of planning permission ref: PA/23/01303 (appeal ref: APP/E5900/W/24/3351303), dated 20/02/2025.
Granted Conditions 5 docs -
1 Alie Street, London, E1 8DE
Submission of details pursuant to Condition 6 (Travel Plan) of planning permission ref: PA/23/01303 (appeal ref: APP/E5900/W/24/3351303), dated 20/02/2025.
Granted Conditions 5 docs -
1 Alie Street, London, E1 8DE
Submission of details pursuant to Condition 4 (Cycle Storage) of planning permission ref: PA/23/01303 (appeal ref: APP/E5900/W/24/3351303), dated 20/02/2025.
Granted Conditions 3 docs -
Standon House, 21 Mansell Street, London, E1 8AN
Consultation by London Borough of Tower Hamlets on an application for demolition of the existing building and erection of a new building of up to 22 storeys, plus two storey basement, to provide office and retail space (Use Class E) and a new hotel (Use Class C1) with restaurant (Use Class E); along with roof level plant enclosures, refuse and recycling facilities, cycle parking, servicing, landscaping, and other associated works.
Granted Demolition 2 docs
Other full applications
In Tower Hamlets
-
PA/26/00916/NC Granted
2 Athelstane Grove, London, E3 5JG
Conversion of existing butterfly roof with front and back mansard to utilise the loft area as habitable space.
-
PA/26/01504/NC Awaiting decision
412 Hackney Road, London, E2 7AP
Proposed for a new side extension, alterations to the existing side extension, installation of a new glazed screen and rooflight, and alterations to the street-facing façade.
-
PA/26/00497/NC Decided
72 Cambridge Heath Road, London, E1 5QJ
The change of use of the ground floor premises at 72 Cambridge Heath Road, London E1 5QJ from Use Class E (Commercial, Business and Service) to Sui Generis (Laundrette) including external flue.
-
PA/26/01526 Awaiting decision
37 Zealand Road, London, E3 5RA
Mansard roof extension, together with new front facing double-glazed timber sash dormer windows, rear facing double-glazed aluminium dormer windows, rear facing rooflights and roof integrated solar panels.
-
PA/26/01527 Awaiting decision
53 Ellesmere Road, London, E3 5QU
Proposed mansard roof extension