Skip to content
PlanIndex Get alerts
Menu

Planning application

Maude House and Jellicoe House, Ropley Street, London E2

Granted Tower Hamlets PA/25/01936/NC Full Planning Permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed replacement of windows and doors

As published by the council, reference PA/25/01936/NC

Application record

Reference
PA/25/01936/NC
Type
Full Planning Permission
Status
Decided
Decision
Granted As published: Permit
Received
11 Nov 2025
Validated
11 Nov 2025
Decided
6 Jan 2026
Ward
Weavers
Decision by
Delegated

Timeline

Dates from the published record

  1. 11 Nov 2025

    Received by Tower Hamlets

  2. 6 Jan 2026

    Decision issued: Permit

  3. 25 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

PARKER ASSOCIATES LIMITED Agent, registered in Colchester

Active · incorporated 2006 · Colchester

58 applications on PlanIndex · across 11 councils · 93% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

  • OFFICERS REPORT Delegated Report · 06 Jan 2026
  • DECISION_NOTICE Decision Notice · 06 Jan 2026
  • EXISTING ELEVATION Current Plan · 05 Nov 2025
  • PROPOSED ELEVATION Current Plan · 05 Nov 2025
  • JELLICOE HOUSE WINDOW DESIGN SPEC Correspondence · 05 Nov 2025
  • EXISTING ELEVATION Current Plan · 05 Nov 2025
  • MAUDE HOUSE WINDOW DESIGN SPEC Correspondence · 05 Nov 2025
  • STE AND PROPOSED BLOCK PLAN Current Plan · 05 Nov 2025
  • TOTAL70 FINISHED PRODUCT DRAWINGS Correspondence · 05 Nov 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Tower Hamlets granted permission on 6 January 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Haig House, Shipton Street, London, E2 7RZ

    PA/25/01663/NC Submitted 6 Oct 2025 50 yards away

    Replacement of existing aluminium framed windows with uPVC windows and replacement of existing doors.

    Granted Full applications Windows or glazing 6 docs
  • Site at Unit 12, 278 Hackney Road, London, E2 7SJ

    PA/25/01272/NC Submitted 8 Sep 2025 50 yards away

    Proposed extension of opening hours for Unit 12, for the continued use of the basement as a workshop (Class E(g)(iii)) and the ground floor for retail use (Class E(a-c)), as follows: 10:00-20:00 Monday to Friday10:00-21:00 Saturday12:00-18:00 Sundays and Bank Holidays

    Granted Full applications Extension 5 docs
  • 290-294 Hackney Road, London, E2 7SJ

    PA/25/00755/NC Submitted 19 May 2025 50 yards away

    Part-retrospective change of use on first, second and third floors from Class C3 residential to a sui generis large HMO.

    Refused Full applications 16 docs
  • Sturdee House, Horatio Street, London E2 7SA

    PA/25/01939/NC Submitted 6 Nov 2025 50 yards away

    Proposed replacement of windows and doors

    Granted Full applications Windows or glazing 8 docs
  • Flat 20, Ion Court, 280 Columbia Road, London, E2 7RW

    PA/25/01644/NC Submitted 17 Sep 2025 100 yards away

    Retention and enhancement of the existing railings along the front boundary, the addition of planting, fencing, and external lighting.

    Granted Full applications 7 docs
  • Flat 20, Ion Court, 280 Columbia Road, London, E2 7RW

    PA/26/00615/S Submitted 11 May 2026 100 yards away

    Application for Non-Material amendment to planning permission ref: PA/25/01644, Dated 20/11/2025. Non Material amendment(s) Sought Condition 5 - External Lighting - 'The hereby approved external lighting, as shown on the drawing Acoustic Fencing Details, Lighting and CCTV, D0551_001 Rev J, must be downward projecting only."

    Refused Amendments 6 docs

In Tower Hamlets

  • PA/26/00916/NC Granted

    2 Athelstane Grove, London, E3 5JG

    Conversion of existing butterfly roof with front and back mansard to utilise the loft area as habitable space.

    Received 3 Jun, published by the council 25 Jul 2026 Full applications
  • PA/26/01504/NC Awaiting decision

    412 Hackney Road, London, E2 7AP

    Proposed for a new side extension, alterations to the existing side extension, installation of a new glazed screen and rooflight, and alterations to the street-facing façade.

    Received 4 Sep, published by the council 11 Oct 2026 Full applications
  • PA/26/00497/NC Decided

    72 Cambridge Heath Road, London, E1 5QJ

    The change of use of the ground floor premises at 72 Cambridge Heath Road, London E1 5QJ from Use Class E (Commercial, Business and Service) to Sui Generis (Laundrette) including external flue.

    Received 25 Mar, published by the council 25 Jul 2026 Full applications
  • PA/26/01526 Awaiting decision

    37 Zealand Road, London, E3 5RA

    Mansard roof extension, together with new front facing double-glazed timber sash dormer windows, rear facing double-glazed aluminium dormer windows, rear facing rooflights and roof integrated solar panels.

    Received 1 Sep, published by the council 4 Sep 2026 Full applications
  • PA/26/01527 Awaiting decision

    53 Ellesmere Road, London, E3 5QU

    Proposed mansard roof extension

    Received 1 Sep, published by the council 4 Sep 2026 Full applications