Planning application

Bow Common Gas Works, Bow Common Lane, London, E3

Granted Tower Hamlets PA/25/01687 Approval Reserved Matters (After OPP)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application for approval of reserved matters relating to the appearance and materials, landscaping, layout, scale and access for Blocks H and I, forming Parcel 1 of Bow Common Gasworks pursuant to planning permission PA/24/00996, including the construction of residential units (Use Class C3), flexible residential facilities and commercial uses (Classes A1, A2, A3, A4, B1, C3, D1 and D2) and ancillary floorspace together with new public open space, public realm works and landscaping; car and cycle parking; servicing amendments; sustainable energy measures; formation of new pedestrian and vehicular access, and site preparation works.

As published by the council, reference PA/25/01687

Application record

Reference
PA/25/01687
Type
Approval Reserved Matters (After OPP)
Status
Decided
Decision
Granted As published: Permit
Received
25 Sep 2025
Validated
25 Sep 2025
Decided
27 Feb 2026
Ward
Bromley South
Decision by
Delegated

Site history

Applications at this address on the Tower Hamlets register

This site has had 28 applications since 2025: 22 approved, 0 refused.

  • PA/26/01471/S Awaiting decision

    Bow Common Gas Works, Bow Common Lane, London, E3

    Submission of details pursuant to condition no. 31 (Lighting Strategy), of planning permission ref: PA/24/00996, dated 11/08/2025

    Submitted 20 Aug 2026 Conditions
  • PA/26/01373/S Awaiting decision

    Bow Common Gas Works, Bow Common Lane, London, E3

    Submission of details pursuant to condition no.27 (Landscape and Ecological Management Plan (LEMP)) in relation to Phase 2 of planning permission ref: PA/24/00996, Dated 11/08/2025.

    Submitted 5 Aug 2026 Conditions
  • PA/26/01148/S Awaiting decision

    Bow Common Gas Works, Bow Common Lane, London, E3

    Submission of details pursuant to condition no.28 (Facing Materials) of planning permission ref: PA/24/00996, dated 11/08/2025

    Submitted 6 Jul 2026 Conditions
  • PA/26/01027/S Granted

    Bow Common Gas Works, Bow Common Lane, London, E3

    Submission of details pursuant to condition no.32 (comply with Part M4(3) 'wheelchair user dwelli...

    Submitted 15 Jun 2026
  • PA/26/00801/S Granted

    Bow Common Gas Works, Bow Common Lane, London, E3

    Application for Non-Material amendment to planning permission ref: PA/24/00996, Dated 11/08/2025. Non Material amendment(s) Sought: The wording of Condition 23 (foundation design and settlement)

    Decided 18 May 2026 Amendments
  • PA/26/00801 Granted

    Bow Common Gas Works, Bow Common Lane, London, E3

    Application for Non-Material amendment to planning permission ref: PA/24/00996, Dated 11/08/2025. Non Material amendment(s) Sought: The wording of Condition 23 (foundation design and settlement)

    Decided 18 May 2026 Amendments
  • PA/26/00450/S Granted

    Bow Common Gas Works, Bow Common Lane, London, E3

    Submission of details pursuant to condition no.22 (CIL Phasing Plan) for Phase 2, Park Phase B1 of planning permission ref: PA/24/00996, dated 11/08/2025

    Decided 23 Apr 2026 Conditions
  • PA/26/00449/S Granted

    Bow Common Gas Works, Bow Common Lane, London, E3

    Submission of details pursuant to condition no.35 (Car Parking) of planning permission ref: PA/24/00996, dated 11/08/2025

    Decided 22 May 2026 Conditions
  • PA/26/00448/S Granted

    Bow Common Gas Works, Bow Common Lane, London, E3

    Submission of details pursuant to condition no.34 (Cycle Parking) of planning permission ref: PA/24/00996, dated 11/08/2025

    Decided 22 May 2026 Conditions
  • PA/26/00382/S Granted

    Bow Common Gas Works, Bow Common Lane, London, E3

    Submission of details pursuant to condition no.15a (verification report - site remediation) in relation to Phase 1 of planning permission ref: PA/19/02379, dated 04/04/2022

    Decided 23 Apr 2026 Conditions

Timeline

Dates from the published record

  1. 25 Sep 2025

    Received by Tower Hamlets

  2. 27 Feb 2026

    Decision issued: Permit

  3. 25 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • PA/26/01784/S Awaiting decision

    Bow Common Gas Works, Bow Common Lane, London

    Application for non-material amendment of planning permission dated 27/02/26 , ref: PA/25/01687 N...

  • Application: PA/24/00996 (Decided)

Who's behind it

Company information only, from the register and Companies House

Quod Ltd Agent

1,109 applications on PlanIndex · across 131 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

St William Homes LLP Applicant, a developer registered in Cobham

Active · incorporated 2014 · Cobham

5 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

98 documents on file for this application

  • OFFICERS REPORT Delegated Report · 27 Feb 2026
  • DECISION_NOTICE Decision Notice · 27 Feb 2026
  • BALCONY STRATEGY Report · 09 Jan 2026
  • RMA SUBMITTED STRATEGY - SAFETY COMPLIANT BASELINE Report · 09 Jan 2026
  • DESIGN PACK - PART 1 Report · 17 Dec 2025
  • DESIGN PACK - PART 2 Report · 17 Dec 2025
  • HEALTH AND SAFETY EXECUTIVE Consultee Comment · 28 Nov 2025
  • HISTORIC ENGLAND ARCHAEOLOGY Consultee Comment · 30 Oct 2025
  • HISTORIC ENGLAND ARCHAEOLOGY Consultee Comment · 29 Oct 2025
  • ENVIRONMENT AGENCY Consultee Comment · 22 Oct 2025
  • CIRCULAR ECONOMY SPREADSHEET Correspondence · 21 Oct 2025
  • UPDATED STATUTORY METRIC Correspondence · 21 Oct 2025
  • WLCCA SPREADSHEET Correspondence · 21 Oct 2025
  • TOWNSCAPE AND VISUAL NOTE - PART 1 Environmental Statement · 06 Oct 2025
  • WIND MICROCLIMATE ASSESSMENT - PART 2 Environmental Statement · 25 Sep 2025
  • STAGE 2 FIRE STRATEGY - PART 1 Report · 25 Sep 2025
  • LANDSCAPE STRATEGY - PART 2 Report · 25 Sep 2025
  • PART 1 Flood Risk Assessment · 25 Sep 2025
  • TOWNSCAPE AND VISUAL NOTE - PART 3 Environmental Statement · 25 Sep 2025
  • TOWNSCAPE AND VISUAL NOTE - PART 7 Environmental Statement · 25 Sep 2025
  • TOWNSCAPE AND VISUAL NOTE - PART 11 Environmental Statement · 25 Sep 2025
  • CIRCULAR ECONOMY STATEMENT Report · 25 Sep 2025
  • OPERATIONAL WASTE MANAGEMENT STRATEGY Report · 25 Sep 2025
  • STATEMENT OF COMMUNITY INVOLVEMENT Report · 25 Sep 2025
  • SUSTAINABILITY STATEMENT Report · 25 Sep 2025
  • LANDSCAPE MASTERPLAN Current Plan · 25 Sep 2025
  • TOWNSCAPE AND VISUAL NOTE - PART 5 Environmental Statement · 25 Sep 2025
  • TOWNSCAPE AND VISUAL NOTE - PART 9 Environmental Statement · 25 Sep 2025
  • ARBORICULTURAL IMPACT ASSESSMENT AND METHOD STATEMENT Report · 25 Sep 2025
  • DESIGN CODE MAY 2024 - PART 1 Report · 25 Sep 2025
  • WIND MICROCLIMATE ASSESSMENT - PART 1 Environmental Statement · 25 Sep 2025
  • STAGE 2 FIRE STRATEGY - PART 2 Report · 25 Sep 2025
  • LANDSCAPE STRATEGY - PART 1 Report · 25 Sep 2025
  • TOWNSCAPE AND VISUAL NOTE - PART 4 Environmental Statement · 25 Sep 2025
  • TOWNSCAPE AND VISUAL NOTE - PART 8 Environmental Statement · 25 Sep 2025
  • TOWNSCAPE AND VISUAL NOTE - PART 2 Environmental Statement · 25 Sep 2025
  • EXISTING AND PROPOSED DRAWINGS Current Plan · 25 Sep 2025
  • DEVELOPMENT SPECIFICATION Report · 25 Sep 2025
  • PHASE 3 - LEVEL 02 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 06 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LVEL 10 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 14 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 18 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 22 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 00 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - SOUTHWEST (ELEVATION CC) AND SOUTHEAST (ELEVATION DD) Current Plan · 25 Sep 2025
  • PART 4 Design & Access Statement · 25 Sep 2025
  • PART 8 Design & Access Statement · 25 Sep 2025
  • PART 1 Design & Access Statement · 25 Sep 2025
  • ENERGY STATEMENT Report · 25 Sep 2025
  • DYNAMIC OVERHEATING REPORT Report · 25 Sep 2025
  • PART 2 Flood Risk Assessment · 25 Sep 2025
  • WHOLE LIFE CARBON ASSESSMENT Report · 25 Sep 2025
  • TOWNSCAPE AND VISUAL NOTE - PART 6 Environmental Statement · 25 Sep 2025
  • TOWNSCAPE AND VISUAL NOTE - PART 10 Environmental Statement · 25 Sep 2025
  • STATEMENT OF CONFORMITY Environmental Statement · 25 Sep 2025
  • DESIGN CODE MAY 2024 - PART 2 Report · 25 Sep 2025
  • SCHEDULE OF ACCOMODATION Correspondence · 25 Sep 2025
  • PHASE 3 - PROPOSED BLOCK PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 03 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 07 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 11 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 15 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 19 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 23 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 01 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - EE AND FF SECTIONAL ELEVATIONS Current Plan · 25 Sep 2025
  • PART 5 Design & Access Statement · 25 Sep 2025
  • PART 9 Design & Access Statement · 25 Sep 2025
  • PART 2 Design & Access Statement · 25 Sep 2025
  • SITE WASTE MANAGEMENT PLAN Report · 25 Sep 2025
  • DESIGN CODE MAY 2024 - PART 4 Report · 25 Sep 2025
  • PLANNING STATEMENT APPENDIX 1- S73 DECISION NOTICE REF: PA/24/00996 Correspondence · 25 Sep 2025
  • PHASE 3 - LEVEL 05 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 09 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 13 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 17 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 21 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 25 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - NORTHEAST (ELEVATION AA) AND NORTHWEST (ELEVATION BB) Current Plan · 25 Sep 2025
  • PART 3 Design & Access Statement · 25 Sep 2025
  • PART 11 Design & Access Statement · 25 Sep 2025
  • DESIGN CODE MAY 2024 - PART 3 Report · 25 Sep 2025
  • PLANNING COMPLIANCE STATEMENT Report · 25 Sep 2025
  • PHASE 3 - EXISTING LOCATION PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 04 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 08 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 12 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 16 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 20 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - LEVEL 24 FLOOR PLAN Current Plan · 25 Sep 2025
  • PHASE 3 - GG AND HH SECTIONAL ELEVATIONS Current Plan · 25 Sep 2025
  • PART 6 Design & Access Statement · 25 Sep 2025
  • PART 10 Design & Access Statement · 25 Sep 2025
  • DETAIL DESIGN PHASE 3 - SUMMARY AREA SCHEDULE Correspondence · 25 Sep 2025
  • COVER LETTER DATED: 15 SEPT 2025 Correspondence · 25 Sep 2025
  • FIRE STATEMENT Correspondence · 25 Sep 2025
  • INCLUSIVE DESIGN AND ACCESSIBILITY STATEMENT Report · 25 Sep 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Tower Hamlets granted permission on 27 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About reserved matters applications

A reserved matters application fills in the detail held back from an earlier outline permission, judged against that permission rather than the principle of development. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Bow Common Gas Works, Bow Common Lane, London, E3

    PA/26/00450/S Submitted 12 Mar 2026 50 yards away

    Submission of details pursuant to condition no.22 (CIL Phasing Plan) for Phase 2, Park Phase B1 of planning permission ref: PA/24/00996, dated 11/08/2025

    Granted Conditions 3 docs
  • Bow Common Gas Works, Bow Common Lane, London, E3

    PA/26/00449/S Submitted 12 Mar 2026 50 yards away

    Submission of details pursuant to condition no.35 (Car Parking) of planning permission ref: PA/24/00996, dated 11/08/2025

    Granted Conditions 4 docs
  • Bow Common Gas Works, Bow Common Lane, London, E3

    PA/26/00448/S Submitted 12 Mar 2026 50 yards away

    Submission of details pursuant to condition no.34 (Cycle Parking) of planning permission ref: PA/24/00996, dated 11/08/2025

    Granted Conditions 4 docs
  • Bow Common Gas Works, Bow Common Lane, London

    PA/25/01512/S Submitted 28 Aug 2025 50 yards away

    Submission of details pursuant to condition no.38 (Acoustic Mitigation) of Planning Permission: PA/19/02379, Dated 04/04/2022.

    Granted Conditions 23 docs
  • Bow Common Gas Works, Bow Common Lane, London, E3

    PA/25/01494/S Submitted 26 Aug 2025 50 yards away

    Application for Non-Material amendment to planning permission ref: PA/24/00996, Dated 11/08/2025. Non Material amendment(s) Sought: amendments to the internal layout, external facing elevations and landscaping of Phase 2 of the consented Bow Common development. The full details of the amendments are outlined in the Design and Access Statement (August 2025) which accompanies this application. The following provides a summary of these amendments: ? Redistribution of unit locations throughout the phase; ? A minor mix change of the provision of units in Phase 2 (see Table 1); ? Additional floor added to Block F and G through the optimisation of floor-to-floor heights, with no increase to the overall height of the building; ? Additional 45 homes, increasing the total number of residential units from 365 to 410; ? Additional 18 affordable homes, 14 of which will be Affordable Rent; ? Minor elevation changes in relation to the redistribution of homes and mix; ? Minor amendments to ground floor layouts; and ? Amendments made to the landscaping scheme and public realm of the phase.

    Granted Amendments 38 docs
  • Bow Common Gas Works, Bow Common Lane, London, E3

    PA/26/00167/S Submitted 29 Jan 2026 50 yards away

    Submission of details pursuant to part (a) of condition no.23 (Construction Method Statement) of planning permission ref: PA/24/00996, dated 11/08/2025

    Granted Conditions 8 docs