Planning application
49-59 Millharbour, 2-4 Muirfield Crescent, and 23-39 Pepper Street, London E14
Works: Extension Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Redevelopment of the site to include demolition of existing buildings and associated site clearance and erection of buildings and extension to the existing basement to provide student accommodation (Sui Generis), residential uses (Use Class C3), flexible community/commercial use (Use Classes E, F1(e), F2(b)), public realm, landscaping, car and cycle parking, highways works and associated works. This application is accompanied by an Environmental Impact Assessment. Summary of Proposals for the Purpose of Public Consultation but does not form part of the Description of Development Construction of three buildings comprising of Block A (28 storeys, 91.03m AOD); Block B (14 storeys, 53.45m AOD) and Block C (28 Storeys, 89.90m AOD); to provide 918 student bedspaces and 59 social rented affordable homes. 4,260 m2 of public realm and open space including 880 m2 play space Affordable community incubator space measuring 252m2 (GIA) at ground floor of Block A and Block B. This use will be flexible to provide space for the local community A total of two on-street disabled car parking spaces to be provided for residential use and four drop-off car parking spaces in the basement to assist with students moving in and out A total of 837 cycle parking spaces including 809 long-stay provided in the basement and 28 short stay provided in the public realm. The proposed Development comprises up to 40,990.2 m² (GIA), which includes; 31,632 m² (GIA) PBSA (Sui Generis) 6,635.7 m² (GIA) Residential Use (Use Class C3) 252 m² (GIA) Affordable Community Incubator Space (Use Classes E, F1(e), F2(b)) 2,550 m² (GIA) Car Park
As published by the council, reference PA/25/01156/A1
Application record
- Reference
- PA/25/01156/A1
- Type
- Full Planning Permission
- Status
- Registered
- Received
- 27 Jun 2025
- Validated
- 27 Jun 2025
- Ward
- Canary Wharf
- Decision by
- Delegated
Timeline
Dates from the published record
-
27 Jun 2025
Received by Tower Hamlets
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 22 August 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Tower Hamlets took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Quod Ltd Agent
1,108 applications on PlanIndex · across 131 councils · 97% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
350 documents on file for this application
- WIND MICROCLIMATE ? RESPONSE TO PEER REVIEW
- ES WIND REVIEW
- WIND MICROCLIMATE PEER REVIEW
- ENERGY MEMO: GLA CONSULTATION
- EMAIL FROM GLA - 12.03.2026
- WIND MICROCLIMATE ? RESPONSE TO REPORT REVIEW
- MASTERPLAN_PROPOSED LEVEL 00 PLAN
- REV 06
- DECISION NOTICE REF: PA/25/01156
- QUANTITATIVE WIND MICROCLIMATE ASSESSMENT
- WIND MICROCLIMATE TECHNICAL REPORT
- PROPOSED PLANTING - GROUND LEVEL 4 OF 4
- PROPOSED PLANTING- GROUND LEVEL 3 OF 4
- PROPOSED PLANTING- GROUND LEVEL 2 OF 4
- PROPOSED PLANTING- GROUND LEVEL 1 OF 4
- BLOCK B PROPOSED NORTH & EAST ELEVATIONS
- BLOCK B PROPOSED SOUTH & WEST ELEVATIONS
- FINAL REVIEW REPORT 002
- RESPONSE FROM RAMBOLL DATED 03 NOVEMBER 2025
- CANAL & RIVER TRUST
- MILLHARBOUR - RAPLEYS LETTER DATED: 02 OCT 2025
- HISTORIC ENGLAND GLAAS (EMAIL)
- TECHNICAL NOTE - RESPONSE TO ENVIRONMENTAL HEALTH OFFICER (EHO)
- HISTORIC ENGLAND ADVICE - 04.02.2026
- BRE UPDATED INTERNAL REVIEW
- CANAL & RIVER TRUST
- STATEMENT OF CONFORMITY - PART 1
- STATEMENT OF CONFORMITY - PART 2
- STATEMENT OF CONFORMITY - PART 3
- STATEMENT OF CONFORMITY - PART 4
- TECHNICAL NOTE - RESPONSE TO ENVIRONMENTAL HEALTH OFFICER (EHO) COMMENTS
- THV FVA REVIEW - SEPT 25
- HISTORIC ENGLAND EMAIL DATED 17.02.2026
- ENVIRONMENT AGENCY - 12.02.2026
- DAYLIGHT SUNLIGHT ADDENDUM REPORT
- NATURAL ENGLAND - 16.02.2026
- PORT OF LONDON AUTHORITY - 12.02.2026
- RESPONSE TO REVIEWER - REV 2
- HSE - BSR
- LONDON CITY AIRPORT
- NATS
- ACTIVE TRAVEL ENGLAND
- UK POWER NETWORKS - 02 FEB 2026
- LONDON UNDERGROUND
- MARINE MANAGEMENT ORGANISATION
- BRE REPORT - UPDATED INTERNAL REVIEW
- SUSTAINABILITY STATEMENT (INC. BREEAM PRE-ASSESSMENT)
- WHOLE LIFECYCLE CARBON ASSESSMENT
- WHOLE LIFECYCLE CARBON ASSESSMENT TEMPLATE
- ES STATEMENT OF CONFORMITY - PART 1
- ES STATEMENT OF CONFORMITY - PART 2
- ES STATEMENT OF CONFORMITY - PART 3
- ES STATEMENT OF CONFORMITY - PART 4
- TECHNICAL NOTE - RESPONSE TO ENVIRONMENTAL HEALTH OFFICER (EHO)
- NOTE IN RESPONSE TO COMMENTS BY TFL & GLA
- MHB SUBMITTED DOCUMENTS AND PLANS TRACKER V4
- GLA CARBON EMISSIONS REPORTING SPREADSHEET
- MASTERPLAN PROPOSED LEVEL 01 PLAN
- MASTERPLAN PROPOSED TYPICAL LOWER PLAN
- MASTERPLAN PROPOSED TYPICAL MID PLAN
- BLOCK B PROPOSED LEVEL 01 - 03 PLAN
- BLOCK B PROPOSED LEVEL 04 - 06 PLAN
- BLOCK B PROPOSED LEVEL 07 - 13
- WCA APARTMENT LAYOUTS
- REV 05
- LETTER FROM EB7
- COVERING LETTER - 23.01.2026
- APPLICATON DRAWING SCHEDULE
- ADDENDUM
- ADDENDUM
- ENERGY STRATEGY
- ENERGY STRATEGY - APPENDIX Z - OVERHEATING RESULTS
- ENERGY STRATEGY - APPENDIX Y - SAPS
- ENERGY STRATEGY - APPENDIX X - BRUKL RESULTS
- REV 05
- ADDENDUM
- PROPOSED AREA & ACCOMMODATION SCHEDULE
- RAMBOLL ES FINAL REVIEW
- SUBMITTED DOCS AND PLANS TEMPLATE V3
- COVERING LETTER - 21.11.2025
- APPLICATION DRAWING SCHEDULE - NOV 2025
- ADDENDUM
- CIRCULAR ECONOMY STATEMENT GLA TEMPLATE
- FIRE STATEMENT (LONDON PLAN)
- INTERNAL DAYLIGHT, SUNLIGHT & SHADING ADDENDUM
- PLANNING GATEWAY ONE FIRE STATEMENT
- SUSTAINABILITY STATEMENT ADDENDUM
- WHOLE LIFE CARBON ASSESSMENT GLA TEMPLATE
- PROPOSED PLANTING STRATEGY - GROUND LEVEL GA
- PROPOSED PLANTING - GROUND LEVEL 1 OF 4
- PROPOSED PLANTING - GROUND LEVEL 2 OF 4
- PROPOSED PLANTING - GROUND LEVEL 3 OF 4
- PROPOSED PLANTING - GROUND LEVEL 4 OF 4
- PROPOSED PLANTING - ROOF LEVEL 1 OF 1
- PROPOSED HARD SURFACING AND FURNITURE - GROUND LEVEL GA
- PROPOSED HARD SURFACING AND FURNITURE - GROUND LEVEL 1 OF 4
- PROPOSED HARD SURFACING AND FURNITURE - GROUND LEVEL 2 OF 4
- PROPOSED HARD SURFACING AND FURNITURE - GROUND LEVEL 3 OF 4
- PROPOSED HARD SURFACING AND FURNITURE - GROUND LEVEL 4 OF 4
- PROPOSED LANDSCAPE LEVELS - GROUND LEVEL
- PROPOSED SECTION B
- PROPOSED SECTION C
- PROPOSED HARD LANDSCAPE STRATEGY - PEDESTRIAN CROSSING
- PROPOSED LANDSCAPE MASTERPLAN - GROUND LEVEL
- PROPOSED NORTHERN PLAY AREA
- PROPOSED NORTHERN PLAY AREA
- PROPOSED SOUTHERN PLAY AREA
- PROPOSED SOUTHERN PLAY AREA
- PROPOSED LANDSCAPE STRATEGY - ROOF LEVEL
- BLOCK A_BAY STUDIES ENTRANCE SOUTH
- BLOCK B_BAY STUDIES COMMERCIAL ENTRANCE
- BLOCK B_BAY STUDIES GROUND SOUTH
- BLOCK B_BAY STUDIES TYPICAL SOUTH
- BLOCK B_BAY STUDIES CROWN SOUTH
- BLOCK B_BAY STUDIES RESI ENTRANCE EAST
- BLOCK C_BAY STUDIES CROWN NORTH
- BLOCK C_BAY STUDIES GROUND WEST
- BLOCK C_BAY STUDIES TYPICAL WEST
- BLOCK C_BAY STUDIES CROWN WEST
- BLOCK C_BAY STUDIES BASE NORTH
- BLOCK C_PROPOSED LEVEL 10-27 PLAN
- BLOCK C_PROPOSED ROOF PLAN
- BLOCK C_PROPOSED TOP ROOF PLAN
- WCA PBSA ROOM LAYOUTS
- MASTERPLAN_PROPOSED NORTH SOUTH SECTION
- MASTERPLAN_PROPOSED EAST WEST SECTION
- BLOCK A_PROPOSED SECTIONS
- BLOCK B_PROPOSED SECTIONS
- BLOCK C_PROPOSED SECTIONS
- MASTERPLAN_PROPOSED NORTH ELEVATION
- MASTERPLAN_PROPOSED EAST ELEVATION
- MATERPLAN_PROPOSED SOUTH ELEVATION
- MASTERPLAN_PROPOSED WEST ELEVATIONS
- BLOCK A_PROPOSED NORTH & EAST ELEVATIONS
- BLOCK A_PROPOSED SOUTH & WEST ELEVATIONS
- BLOCK C_PROPOSED NORTH & EAST ELEVATIONS
- BLOCK C_PROPOSED SOUTH & WEST ELEVATIONS
- BLOCK A_BAY STUDIES GROUND WEST
- BLOCK A_BAY STUDIES TYPICAL WEST
- BLOCK A_BAY STUDIES CROWN WEST
- PROPOSED SITE PLAN
- MASTERPLAN_PROPOSED BASEMENT FLOOR PLAN
- MASTERPLAN_PROPOSED LEVEL 14 PLAN
- MASTERPLAN_PROPOSED TYPICAL UPPER PLAN
- MASTERPLAN_PROPOSED LEVEL 27 PLAN
- MASTERPLAN_PROPOSED ROOF PLAN
- MASTERPLAN_PROPOSED TOP ROOF PLAN
- BLOCK A_PROPOSED LEVEL 00 PLAN
- BLOCK A_PROPOSED LEVEL 01 PLAN
- BLOCK A_PROPOSED LEVEL 02 - 12 PLAN
- BLOCK A_PROPOSED LEVEL 13 - 26 PLAN
- BLOCK A_PROPOSED LEVEL 27 PLAN
- BLOCK A_PROPOSED ROOF PLAN
- BLOCK A_PROPOSED TOP ROOF PLAN
- BLOCK B_PROPOSED LEVEL 00 PLAN
- BLOCK B_PROPOSED MEZZANINE PLAN
- BLOCK B_PROPOSED ROOF PLAN
- BLOCK B_PROPOSED TOP ROOF PLAN
- BLOCK C_PROPOSED LEVEL 00 PLAN
- BLOCK C_PROPOSED LEVEL 01 PLAN
- BLOCK C_PROPOSED LEVEL 02 - 06 PLAN
- BLOCK C_PROPOSED LEVEL 07 - 09 PLAN
- TECHNICAL NOTE - RESPONSE TO ENVIRONMENTAL HEALTH OFFICER (EHO)
- TECHNICAL NOTE - RESPONSE TO EHO
- ADDENDUM - PART 1
- ADDENDUM - PART 2
- ADDENDUM - COMBINED FIGURES
- UPDATED NON-TECHNICAL SUMMARY
- UPDATED TFL CONSULTEE COMMENTS, DATED 10/11/2025
- TFL CONSULTEE COMMENTS DATED 07/11/2025
- EMAIL DATED 05 NOV 2025
- RESPONSE TO TFL AND GLA
- BIODIVERSITY NET GAIN & URBAN GREENING FACTOR ASSESSMENTS
- BIODIVERSITY NET GAIN METRIC
- URBAN GREENING FACTOR CALCULATOR
- IRR PROPOSED RESPONSES
- INTERIM REVIEW REPORT
- BLOCK A ROOF LEVEL PIPEWORK LAYOUT
- BLOCK A MECHANICAL AND ELECTRICAL TYPICAL FLOOR LAYOUT
- BLOCK B ROOF LEVEL PIPEWORK LAYOUT
- BLOCK B MECHANICAL AND ELECTRICAL TYPICAL FLOOR LAYOUT
- BLOCK C ROOF LEVEL PIPEWORK LAYOUT
- BASEMENT COMBINED MEP PLANT REQUIREMENTS LAYOUT
- BASEMENT ENERGY CENTRE LAYOUT
- LBTH ES REVIEW ? INTERIM REVIEW REPORT
- EIA REGULATION 25 REQUEST
- REVIEW REPORT
- ECOLOGY REVIEW FROM TEMPLE
- LBTH BIODIVERSITY REVIEWS
- DRAWING SCHEDULE REV 01
- TECHNICAL NOTE - RESPONSE TO COMMENTS FROM EH 14.08.25
- HISTORIC ENGLAND GLAAS
- GLA STAGE 1 LETTER
- GLA STAGE 1 REPORT
- EMAIL FROM HISTORIC ENGLAND, DATED 26/08/2025
- ENVIRONMENT AGENCY - 13.08.2025
- PORT OF LONDON AUTHORITY (PLA)
- USE OF THE TIDAL THAMES A PRACTICAL GUIDE FOR LOCAL AUTHORITIES AND DEVELOPERS
- HISTORIC ENGLAND
- NATS
- LONDON UNDERGROUND
- UK POWER NETWORKS
- HSE
- UKPN
- NATURAL ENGLAND - 22.07.2025
- LONDON CITY AIRPORT
- GLA - ACKNOWLEDGEMENT
- ACTIVE TRAVEL ENGLAND
- CADENT GAS LTD
- HSE
- SITE LOCATION PLAN
- EXISTING SITE PLAN
- EXISTING BASEMENT PLAN
- EXISTING LEVEL 00 PLAN
- EXISTING LEVEL 01 PLAN
- EXISTING LEVEL 02 PLAN
- EXISTING LEVEL 03 PLAN
- EXISTING ROOF PLAN
- EXISTING ELEVATIONS AND SECTIONS 01
- EXISTING ELEVATIONS AND SECTIONS 02
- DEMOLITION BASEMENT PLAN
- DEMOLITION LEVEL 00 PLAN
- DEMOLITION LEVEL 01 PLAN
- DEMOLITION LEVEL 02 PLAN
- DEMOLITION LEVEL 03 PLAN
- DEMOLITION ROOF PLAN
- DEMOLITION ELEVATIONS AND SECTIONS 01
- DEMOLITION ELEVATIONS AND SECTIONS 02
- PROPOSED LANDSCAPE STRATEGY - FIRST FLOOR
- PROPOSED PLANTING - FIRST FLOOR1 OF 1
- PROPOSED SECTION A
- PROPOSED SECTION B
- PROPOSED SECTION C
- APPENDIX A
- CHAPTER 1
- CHAPTER 2A
- CHAPTER 2B
- CHAPTER 2C
- CHAPTER 3A
- CHAPTER 3B
- CHAPTER 3C
- CHAPTER 4A
- CHAPTER 4B
- CHAPTER 4C
- CHAPTER 4D
- CHAPTER 5A
- CHAPTER 5B
- CHAPTER 5C
- CHAPTER 6
- CHAPTER 7
- CHAPTER 8A
- CHAPTER 8B
- CHAPTER 9
- CHAPTER 10A
- CHAPTER 10B
- CHAPTER 10C
- CHAPTER 10D
- VOL 1 CH 1 INTRODUCTION
- VOL 1 CH 10 NOISE AND VIBRATION
- VOL 1 CH 11 ARCHAEOLOGY
- VOL 1 CH 12 GROUND CONDITIONS AND CONTAMINATION
- VOL 1 CH 13 WATER RESOURCES FLOOD RISK AND DRAINAGE
- VOL 1 CH 14 DSO
- VOL 1 CH 15 WIND
- VOL 1 CH 2 EIA METHODOLOGY
- VOL 1 CH 3 LAND USES AND SENSITIVE RECEPTORS
- VOL 1 CH 4 THE PROPOSED DEVELOPMENT
- VOL 1 CH 5 ALTERNATIVES AND DESIGN EVOLUTION
- VOL 1 CH 6 CONSTRUCTION STRATEGY AND MANAGEMENT
- VOL 1 CH 7 SOCIO ECONOMICS
- VOL 1 CH 8 TRANSPORT AND ACCESS
- VOL 1 CH 9 AIR QUALITY
- VOL 1 CH 16 GREENHOUSE GAS AND CLIMATE CHANGE
- VOL 1 CH 17 HUMAN HEALTH
- VOL 1 CH 18 CUMULATIVE SCHEMES
- VOL 1 CH 19 NEXT STEPS
- VOL 1 CONTENTS AND GLOSSARY
- VOL 2 FIGURES - SELECTION OF PLANNING DRAWINGS
- VOL 2 FIGURES 1.1 - 4.1
- VOL 2 FIGURES 14.2 - 17.1
- VOL 2 FIGURES 4.2 - 7.2
- VOL 2 FIGURES 7.3 - 14.1
- VOL 3 APPENDIX 1.1 LOCATION OF INFORMATION WITHIN THE ES
- VOL 3 APPENDIX 1.2 COMPETENT EXPERTS
- VOL 3 APPENDIX 2.1 CUMULATIVE SCHEMES ASSESSED
- VOL 3 APPENDIX 6.1 OUTLINE CEMP
- VOL 3 APPENDIX 7.1 SOCIO ECONOMICS PLANNING POLICY AND GUIDANCE
- VOL 3 APPENDIX 8.1 TRANSPORT ASSESSMENT_PART 1
- VOL 3 APPENDIX 8.1 TRANSPORT ASSESSMENT_PART 2
- VOL 3 APPENDIX 9.1 AIR QUALITY LEGISLATION AND POLICY
- VOL 3 APPENDIX 9.2 AIR QUALITY BASELINE
- VOL 3 APPENDIX 9.3 CONSTRUCTION DUST RISK ASSESSMENT
- VOL 3 APPENDIX 9.4 AIR QUALITY MODELLING STUDY
- VOL 3 APPENDIX 9.5 SITE SUITABILITY ASSESSMENT
- VOL 3 APPENDIX 9.6 AIR QUALITY NEUTRAL ASSESSMENT
- VOL 3 APPENDIX 9.7 AIR QUALITY POSITIVE
- VOL 3 APPENDIX 10.1 GLOSSARY OF ACOUSTIC TERMINOLOGY
- VOL 3 APPENDIX 10.2 LBTH NOISE LEGISLATION POLICY AND GUIDANCE
- VOL 3 APPENDIX 10.3 ENVIRONMENTAL BASELINE NOISE AND VIBRATION LEVELS
- VOL 3 APPENDIX 10.4 CONSULTATION ON NOISE BASELINE SURVEY
- VOL 3 APPENDIX 10.5 CONSTRUCTION NOISE ASSESSMENT
- VOL 3 APPENDIX 10.6 ROAD TRAFFIC NOISE ASSESSMENT
- VOL 3 APPENDIX 11.1 ARCHAEOLOGICAL DESK BASED ASSESSMENT
- VOL 3 APPENDIX 12.1 PRELIMINARY RISK ASSESSMENT_PART 1
- VOL 3 APPENDIX 12.1 PRELIMINARY RISK ASSESSMENT_PART 2
- VOL 3 APPENDIX 12.1 PRELIMINARY RISK ASSESSMENT_PART 3
- VOL 3 APPENDIX 12.1 PRELIMINARY RISK ASSESSMENT_PART 4
- VOL 3 APPENDIX 12.1 PRELIMINARY RISK ASSESSMENT_PART 5
- VOL 3 APPENDIX 13.1 FLOOD RISK ASSESSMENT
- VOL 3 APPENDIX 13.2 SUSTAINABLE DRAINAGE STRATEGY
- VOL 3 APPENDIX 13.3 FOUL SEWERAGE AND UTILITIES ASSESSMENT
- VOL 3 APPENDIX 14.1 DSO DRAWINGS
- VOL 3 APPENDIX 14.2 TO 14.6 DSO
- VOL 3 APPENDIX 15.1 WIND MICROCLIMATE TECHNICAL REPORT
- VOL 3 APPENDIX 16.1 TO 16.2 GREENHOUSE GASES
- VOL 3 CONTENTS
- VOL 4 BUILT HERITAGE TOWNSCAPE VISUAL IMPACT ASSESSMENT_PART 1
- VOL 4 BUILT HERITAGE TOWNSCAPE VISUAL IMPACT ASSESSMENT_PART 2
- VOL 4 BUILT HERITAGE TOWNSCAPE VISUAL IMPACT ASSESSMENT_PART 3
- VOL 4 BUILT HERITAGE TOWNSCAPE VISUAL IMPACT ASSESSMENT_PART 4
- APPENDICES
- AFFORDABLE HOUSING STATEMENT
- ARBORICULTURE IMPACT ASSESSMENT
- LBTH BIODIVERSITY NET GAIN (BNG) CHECKLIST
- BIODIVERSITY NET GAIN MAP
- DELIVERY AND SERVICING PLAN
- ECONOMIC BENEFITS STATEMENT
- ENERGY ASSESSMENT: TM54 OPERATIONAL ASSESSMENT (BLOCK A)
- ENERGY ASSESSMENT: TM54 OPERATIONAL ASSESSMENT (BLOCK B)
- ENERGY ASSESSMENT: TM54 OPERATIONAL ASSESSMENT (BLOCK C)
- FINANCIAL VIABILITY ASSESSMENT
- FRAMEWORK RESIDENTIAL TRAVEL PLAN
- FRAMEWORK STUDENT TRAVEL PLAN
- HEALTH IMPACT ASSESSMENT
- INFRASTRUCTURE IMPACT ASSESSMENT
- INTERNAL DAYLIGHT, SUNLIGHT & SHADING
- OUTLINE CONSTRUCTION LOGISTICS PLAN
- PARKING DESIGN AND MANAGEMENT PLAN
- PRELIMINARY ECOLOGICAL APPRAISAL MAP
- PRELIMINARY ECOLOGICAL APPRAISAL
- STATEMENT OF COMMUNITY INVOLVEMENT
- STUDENT MANAGEMENT PLAN
- WASTE MANAGEMENT PLAN
- COVERING LETTER DATED: 26 JUNE 2025
- LETTER OF SUPPORT FROM LSE DATED: 06 MAY 2025
- AVIATION SAFEGUARDING ASSESSMENT
- CIRCULAR ECONOMY STATEMENT VOLUME 1: PRE- REDEVELOPMENT AUDIT
- CIRCULAR ECONOMY STATEMENT VOLUME 2: PRE-DEMOLITION AUDIT
- PBSA DEMAND AND MARKET ASSESSMENT
- PLANNING NOISE ASSESSMENT OF RESIDENTIAL AMENITY
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Tower Hamlets for determination, against a statutory target of eight weeks. Over the last year Tower Hamlets decided full applications in a median of 56 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Bellerive House, 3 Muirfield Crescent, London, E14 9SZ
Submission of details pursuant to condition no.2 (Deliveries and Servicing Plan) of planning permission ref: PA/21/01170, dated 16/07/2021
Granted Conditions 2 docs -
Former 45 Millharbour, 45 Millharbour, London, E14
Modification of Planning Obligation (Schedule 7 ? Employment Initiative) of planning application PA/11/00798 (amended under PA/13/02210) to allow for wider marketing of class E use
Granted Conditions 8 docs -
8 Greenwich View Place, London, E14 9NN
89% historically approved · decision due ~14 Sep
Request for Screening Opinion as to whether an Environmental Impact Assessment (EIA) is required in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) (the 'EIA Regulations') for the redevelopment of the site for a single storey freestanding electrical substation.
Awaiting decision Outline 1 docSmall domestic -
147 Mellish Street, London, E14 8PJ
Submission of details pursuant to condition no.6 (Car-Free Development) of planning permission ref: PA/15/00997, dated 17/06/2015
Granted Conditions 4 docs -
Westwood House, 54 Millharbour, London, E14 9DJ
Replacement of combustible materials on the facade of the building.
Granted Full applications 21 docs -
Flat 5, 13 Pepper Street, London, E14 9RB
Installation of an air to air heat pump system on a third floor balcony
Granted 9 docs
Other full applications
In Tower Hamlets
-
PA/26/00916/NC Granted
2 Athelstane Grove, London, E3 5JG
Conversion of existing butterfly roof with front and back mansard to utilise the loft area as habitable space.
-
PA/26/01504/NC Awaiting decision
412 Hackney Road, London, E2 7AP
Proposed for a new side extension, alterations to the existing side extension, installation of a new glazed screen and rooflight, and alterations to the street-facing façade.
-
PA/26/00497/NC Decided
72 Cambridge Heath Road, London, E1 5QJ
The change of use of the ground floor premises at 72 Cambridge Heath Road, London E1 5QJ from Use Class E (Commercial, Business and Service) to Sui Generis (Laundrette) including external flue.
-
PA/26/01526 Awaiting decision
37 Zealand Road, London, E3 5RA
Mansard roof extension, together with new front facing double-glazed timber sash dormer windows, rear facing double-glazed aluminium dormer windows, rear facing rooflights and roof integrated solar panels.
-
PA/26/01527 Awaiting decision
53 Ellesmere Road, London, E3 5QU
Proposed mansard roof extension