Planning application
Land at Fleet Street Hill, Shoreditch, London E2 6EE
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Comprehensive re-development of the Site to provide two buildings and a pavilion building together delivering Purpose Built Shared Living Accommodation (Sui Generis), affordable housing units with associated communal amenity space (Use Class C3), a flexible commercial space (Use Class E) and the delivery of wider public realm improvements comprising hard and soft landscaping and other associated works.
As published by the council, reference PA/25/00240/A1
Application record
- Reference
- PA/25/00240/A1
- Type
- Full Planning Permission
- Status
- Registered
- Received
- 10 Feb 2025
- Validated
- 10 Feb 2025
- Ward
- Spitalfields and Banglatown
- Decision by
- Strategic Development Committee
- Postcode
- E2 6EE
Timeline
Dates from the published record
-
10 Feb 2025
Received by Tower Hamlets
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 7 April 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Tower Hamlets took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,625 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
167 documents on file for this application
- WLC MEMO - GLA CONSULTATION
- GLA CONSULTATION - CIRCULAR ECONOMY
- GLA CONSULTATION - ENERGY MEMO
- STAGE 1 REPORT
- STAGE 1 LETTER 14 APRIL 2025
- AIR QUALITY UPDATE 28 OCTOBER 2025
- THAMES WATER
- HEALTH AND SAFETY EXECUTIVE
- FIRE STATEMENT FORM
- IMPACT ON NEIGHBOURING PROPERTIES REPORT: APPENDICES - PART 1
- IMPACT ON NEIGHBOURING PROPERTIES REPORT: APPENDICES - PART 2
- IMPACT ON NEIGHBOURING PROPERTIES REPORT: APPENDICES - PART 3
- IMPACT ON NEIGHBOURING PROPERTIES REPORT: APPENDICES - PART 4
- IMPACT ON NEIGHBOURING PROPERTIES REPORT: APPENDICES - PART 5
- IMPACT ON NEIGHBOURING PROPERTIES REPORT: APPENDICES - PART 6
- PROPOSED GROUND FLOOR PLAN
- PROPOSED BLOCK PLAN
- PROPOSED NORTH SITE ELEVATION
- PROPOSED EAST SITE ELEVATION
- PROPOSED RESIDENTIAL BUILDING ELEVATIONS
- LANDSCAPE GENERAL ARRANGEMENT GROUND LEVEL
- GIA RESPONSE TO BRE 08/08/2025
- GIA D/S ADDENDUM NOTE
- INTERNAL DAYLIGHT, SUNLIGHT AND OVERSHADOWING REPORT
- DAS ADDENDUM
- D/S ADDENDUM APPENDICES
- LBTH BIODIVERSITY REVIEW ? FINAL REVIEW REPORT
- TFL
- NATURAL ENGLAND GENERAL ADVICE
- NETWORK RAIL
- HISTORIC ENGLAND - 18.03.2025
- HISTORIC ENGLAND - 17.03.2025
- LONDON UNDERGROUND / DLR INFRASTRUCTURE PROTECTION
- RAIL FOR LONDON
- LONDON CITY AIRPORT
- HISTORIC ENGLAND - 04.03.2025
- NATS
- HSE.
- TECHNICAL NOTE 02: PERMIT TRANSFER SCHEME PARKING IMPACTS
- CES REPORTING TEMPLATE COLIVING BUILDING P04
- WLCA REPORTING TEMPLATE COLIVING BUILDING P03
- CES REPORTING TEMPLATE AFFORDABLE RESIDENTIAL BUILDING P04
- WLCA REPORTING TEMPLATE AFFORDABLE RESIDENTIAL BUILDING P04
- STATUTORY BIODIVERSITY METRIC
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 1
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 2
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 3
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 4
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 5
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 6
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 7
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 8
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 9
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 10
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 11
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 12
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 13
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 14
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 15
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 16
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 17
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 18
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 19
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 20
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 21
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 22
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 23
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 24
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 25
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 26
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 27
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 28
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 29
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 30
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 31
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 32
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 33
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 34
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 35
- TOWNSCAPE, VISUAL AND BUILT HERITAGE ASSESSMENT - PART 36
- LANDSCAPE GENERAL ARRANGEMENT TERRACE LEVEL
- URBAN GREENING FACTOR
- EXISTING GROUND FLOOR PLAN
- PROPOSED FIRST FLOOR PLAN
- PROPOSED TENTH (RESI ROOF) FLOOR PLAN
- PROPOSED ELEVENTH FLOOR PLAN
- PROPOSED TWELFTH FLOOR PLAN
- PROPOSED BASEMENT FLOOR PLAN
- PROPOSED ROOF PLAN
- PROPOSED RESIDENTIAL BUILDING -WCA UNIT LAYOUTS
- LOCATION PLAN
- EXISTING BLOCK PLAN
- EXISTING SITE ELEVATIONS
- EXISTING SITE SECTIONS
- PROPOSED SECOND TO THIRD FLOOR PLAN
- PROPOSED FOURTH TO NINTH FLOOR PLAN
- PROPOSED SOUTH SITE ELEVATION
- PROPOSED CO-LIVING BUILDING ELEVATIONS
- PROPOSED PAVILION BUILDING ELEVATIONS & SECTION
- PROPOSED CO-LIVING BUILDING BAY STUDIES
- PROPOSED CO-LIVING BUILDING BAY STUDIES
- PROPOSED RESIDENTIAL BUILDING BAY STUDIES
- PROPOSED RESIDENTIAL BUILDING BAY STUDIES
- PROPOSED SITE SECTION AA
- PROPOSED SITE SECTION BB
- PROPOSED CO-LIVING BUILDING SECTIONS
- PROPOSED RESIDENTIAL BUILDING SECTIONS
- AFFORDABLE HOUSING STATEMENT
- IMPACT ON NEIGHBOURING PROPERTIES REPORT
- ECOLOGICAL APPRAISAL
- EXTERIOR LIGHTING ASSESSMENT
- EXTERIOR LIGHTING ASSESSMENT
- FINANCIAL VIABILITY ASSESSMENT - PART 1
- FINANCIAL VIABILITY ASSESSMENT - PART 2
- AIR QUALITY ASSESSMENT
- ARCHAEOLOGICAL DESK-BASED ASSESSMENT - PART 1
- ARCHAEOLOGICAL DESK-BASED ASSESSMENT - PART 2
- ARCHAEOLOGICAL DESK-BASED ASSESSMENT - PART 3
- ARCHAEOLOGICAL DESK-BASED ASSESSMENT - PART 4
- CIRCULAR ECONOMY STATEMENT - PART 1
- CIRCULAR ECONOMY STATEMENT - PART 2
- ENERGY ASSESSMENT
- LONDON PLAN FIRE STATEMENT
- OPERATIONAL MANAGEMENT PLAN
- STATEMENT OF COMMUNITY INVOLVEMENT
- SUSTAINABILITY STATEMENT
- SITE WASTE MANAGEMENT PLAN
- UTILITIES STATEMENT
- HEALTH IMPACT ASSESSMENT
- NOISE IMPACT ASSESSMENT
- INCLUDING SUSTAINABLE DRAINAGE (SUDS) STRATEGY REPORT - PART 1
- INCLUDING SUSTAINABLE DRAINAGE (SUDS) STRATEGY REPORT - PART 2
- INCLUDING SUSTAINABLE DRAINAGE (SUDS) STRATEGY REPORT - PART 3
- INCLUDING SUSTAINABLE DRAINAGE (SUDS) STRATEGY REPORT - PART 4
- INCLUDING SUSTAINABLE DRAINAGE (SUDS) STRATEGY REPORT - PART 5
- INCLUDING SUSTAINABLE DRAINAGE (SUDS) STRATEGY REPORT - PART 6
- PEDESTRIAN LEVEL WIND MICROCLIMATE ASSESSMENT
- TRANSPORT ASSESSMENT - PART 1
- TRANSPORT ASSESSMENT - PART 2
- FRAMEWORK CONSTRUCTION MANAGEMENT AND LOGISTICS PLAN
- FRAMEWORK TRAVEL PLAN
- FRAMEWORK DELIVERY AND SERVICING MANAGEMENT PLAN
- SECURED BY DESIGN BREEAM REPORT - PART 1
- SECURED BY DESIGN BREEAM REPORT - PART 2
- SHARED LIVING NEEDS ASSESSMENT
- ARBORICULTURAL IMPACT ASSESSMENT & METHOD STATEMENT
- WASTE MANAGEMENT STRATEGY
- WASTE TREATMENT REVIEW
- WLCA REPORTING TEMPLATE AFFORDABLE RESIDENTIAL BUILDING
- WLCA REPORTING TEMPLATE COLIVING BUILDING
- COVERING LETTER DATED: 5TH JANUARY 2025
- BREEAM ECOLOGICAL APPRAISAL
- LANDSCAPE AND PUBLIC REALM STRATEGY - PART 1
- LANDSCAPE AND PUBLIC REALM STRATEGY - PART 2
- LANDSCAPE AND PUBLIC REALM STRATEGY - PART 3
- LANDSCAPE AND PUBLIC REALM STRATEGY - PART 4
- LANDSCAPE AND PUBLIC REALM STRATEGY - PART 5
- LANDSCAPE AND PUBLIC REALM STRATEGY - PART 6
- LANDSCAPE AND PUBLIC REALM STRATEGY - PART 7
- PART 1
- PART 2
- PART 3
- PART 4
- PART 5
- PART 6
- PART 7
- PART 8
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Tower Hamlets for determination, against a statutory target of eight weeks. Over the last year Tower Hamlets decided full applications in a median of 56 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
178A Brick Lane, London, E1 6SA
83% historically approved · decision due ~27 Jul
x1 LED Digital Advertising Display within a Non-Illuminated Advertising Banner Surround.
Awaiting decision Advertising 11 docs -
182 Brick Lane, London, E1 6SA
Temporary installation (9 Months) of a non-illuminated static advertisement positioned on the corner of Brick Lane and Cheshire Street, measuring 9.2m x 5.5m integrated within scaffold shroud with a replica façade treatment across the scaffolded elevations.
Granted Advertising 11 docs -
Flat 1, 35 St Matthew's Row, London, E2 6DT
Relocation of the existing rear metal gate to the front of the property to enhance security for the residents.
Granted Full applications 6 docs -
Flat 1, 35 St Matthew's Row, London, E2 6DT
Relocation of the existing rear metal gate to the front of the property to enhance security for the residents.
Granted Heritage and listed buildings 3 docs -
Flat 1, 35 St Matthew's Row, London, E2 6DT
Relocation of the existing rear metal gate to the front of the property to enhance security for the residents.
Granted Full applications 6 docs -
102 Sclater Street, London, E1 6HR
Proposed works include : Convert half of the existing first-floor balcony into a bathroom. Replace the rear balcony window on the first floor with a door to provide access. Reconfigure the first-floor layout by converting the current kitchen and living room into Bedroom 1 and Bedroom 2. Reassign the existing second-floor bedrooms so that Bedroom 1 and Bedroom 2 become Bedroom 3 and Bedroom 4. Carry out a loft conversion to create a new kitchen and open-plan living area. Incorporate two Juliet balconies within the loft space. Provide a roof terrace at the top level, accessible via a staircase and roof hatch.
Granted Full applications Loft or dormer Windows or glazing 5 docs
Other full applications
In Tower Hamlets
-
PA/26/00916/NC Granted
2 Athelstane Grove, London, E3 5JG
Conversion of existing butterfly roof with front and back mansard to utilise the loft area as habitable space.
-
PA/26/01504/NC Awaiting decision
412 Hackney Road, London, E2 7AP
Proposed for a new side extension, alterations to the existing side extension, installation of a new glazed screen and rooflight, and alterations to the street-facing façade.
-
PA/26/00497/NC Decided
72 Cambridge Heath Road, London, E1 5QJ
The change of use of the ground floor premises at 72 Cambridge Heath Road, London E1 5QJ from Use Class E (Commercial, Business and Service) to Sui Generis (Laundrette) including external flue.
-
PA/26/01526 Awaiting decision
37 Zealand Road, London, E3 5RA
Mansard roof extension, together with new front facing double-glazed timber sash dormer windows, rear facing double-glazed aluminium dormer windows, rear facing rooflights and roof integrated solar panels.
-
PA/26/01527 Awaiting decision
53 Ellesmere Road, London, E3 5QU
Proposed mansard roof extension