Skip to content
PlanIndex Get alerts
Menu

Planning application

'Neptune Wharf' Site Comprising Land Bounded: To The North By Hertford Union Canal; To The East By Roach Road, Roach Point Footbridge, Omega Wharf; To The South By Wyke Road, Remus Road, Monier Road; And To The West By Wansbeck Road

Granted Tower Hamlets LL/12/00210/OUT London Legacy Development Corporation

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

For Full Description please refer to the Development Specification (October 2013).Summary Description - 'Outline planning application for comprehensive mixed use redevelopment of the site known as 'Neptune Wharf', as set out in the Development Specification (October 2013), in up to 4 phases / zones containing up to 18 buildings to provide for a mix of land uses: Phases/Zones 1 and 2 comprising: Application for outline permission (all matters reserved) for 1 No. Building (Block A); and Application for outline permission (landscaping reserved) for 13 No. Buildings (Blocks B-N) including: Residential floorspace (Use Class C3) comprising 422 dwellings (37,440sqm GIA); Non-residential floorspace (Use Classes A, B and D) comprising 3,348sqm GIA; Phases/Zones 3 and 4 Application for outline planning permission (with all matters reserved except access) to provide 4 Buildings (Blocks O, P, Q and R) including development comprising: Residential floorspace (Use Class C3) providing up to 7,691sqm GIA or up to 100 dwellings; Non-residential floorspace (Use Classes A, B and D1) providing up to 6,255sqm to include: Local retail, service, and food and drink uses (Use Classes A1-A4); Business premises (Use Classes B1); and 3 Form Entry Primary School (Use Class D1). All Phases: Associated external play areas; Provision of new site access points for pedestrians and vehicles with new internal access routes/streets and means of access and circulation; highway surface improvements and associated surface and undercroft parking for cars and cycles; Provision of new open spaces, including private amenity, communal amenity and public realm areas and associated landscaping works; Associated site works including excavation and re-grading of site levels including utility diversions, upgrades and new connections and other supporting infrastructure and engineering works. This planning application is accompanied by an Environmental Statement.

As published by the council, reference LL/12/00210/OUT

Application record

Reference
LL/12/00210/OUT
Type
London Legacy Development Corporation
Status
Decided
Decision
Granted As published: Permit
Received
9 Nov 2012
Validated
9 Nov 2012
Decided
27 Mar 2014
Ward
Bow East
Decision by
Delegated

Timeline

Dates from the published record

  1. 9 Nov 2012

    Received by Tower Hamlets

  2. 27 Mar 2014

    Decision issued: Permit

  3. 29 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Austin Mackie Associates Ltd Agent, registered in Harrow

Dissolved · incorporated 2009 · Harrow

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Neptune Group Applicant, registered in Hillsborough

Active · incorporated 2020 · Hillsborough

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

The council's own list, drawings first

127 documents on file for this application

Drawings (17)

  • Section 12 May 2025
  • Section 12 May 2025
  • Section 12 May 2025
  • Section 12 May 2025
  • Section 12 May 2025
  • Section 12 May 2025
  • Section 12 May 2025
  • Section 12 May 2025
  • Section 12 May 2025
  • Section 12 May 2025
  • Section 12 May 2025
  • Section 12 May 2025
  • Section 12 May 2025
  • Section 12 May 2025
  • Section 12 May 2025
  • Section 12 May 2025
  • Section 12 May 2025

Everything on file (127)

  • VOL 9B - TECHNICAL APPENDICES Environmental Statement · 12 May 2025
  • STATEMENT OF COMMUNITY INVOLVEMENT ADDENDUM Report · 12 May 2025
  • OCT 2013 - SECTION 1-2A Design & Access Statement · 12 May 2025
  • OCT 2013 - SECTION 1-2B Design & Access Statement · 12 May 2025
  • OCT 2013 - SECTION 1-2C Design & Access Statement · 12 May 2025
  • OCT 2013 - SECTION 3 Design & Access Statement · 12 May 2025
  • OCT 2013 - SECTION 4A Design & Access Statement · 12 May 2025
  • OCT 2013 - SECTION 4B Design & Access Statement · 12 May 2025
  • OCT 2013 - SECTION 4C Design & Access Statement · 12 May 2025
  • OCT 2013 - SECTION 4D Design & Access Statement · 12 May 2025
  • OCT 2013 - SECTION 4E Design & Access Statement · 12 May 2025
  • OCT 2013 - SECTION 5 Design & Access Statement · 12 May 2025
  • OCT 2013 - SECTION 6 Design & Access Statement · 12 May 2025
  • OCT 2013 - SECTION 7 Design & Access Statement · 12 May 2025
  • OCT 2013 - SECTION 8 Design & Access Statement · 12 May 2025
  • OCT 2013 - SECTION 9 Design & Access Statement · 12 May 2025
  • OCT 2013 - SECTION 10 Design & Access Statement · 12 May 2025
  • OCT 2013 - SECTION 11 Design & Access Statement · 12 May 2025
  • OCT 2013 - SECTION 12 Design & Access Statement · 12 May 2025
  • ADDENDUM - CH 1 & 2 Design & Access Statement · 12 May 2025
  • ADDENDUM - CH 3 & 4 PART 1 Design & Access Statement · 12 May 2025
  • ADDENDUM - CH 3 & 4 PART 2 Design & Access Statement · 12 May 2025
  • ADDENDUM - CH 3 & 4 PART 3 Design & Access Statement · 12 May 2025
  • ADDENDUM - CH 3 & 4 PART 4 Design & Access Statement · 12 May 2025
  • ADDENDUM - CH 3 & 4 PART 5 Design & Access Statement · 12 May 2025
  • ADDENDUM - CH 3 & 4 PART 6 Design & Access Statement · 12 May 2025
  • ADDENDUM - CH 5 & 6 Design & Access Statement · 12 May 2025
  • ADDENDUM - CH 7 & 8 Design & Access Statement · 12 May 2025
  • PARTS 1 & 2 Design & Access Statement · 12 May 2025
  • PART 3 Design & Access Statement · 12 May 2025
  • PART 4 Design & Access Statement · 12 May 2025
  • PARTS 5 & 6 Design & Access Statement · 12 May 2025
  • PART 7 Design & Access Statement · 12 May 2025
  • PART 8 Design & Access Statement · 12 May 2025
  • PARTS 9 TO 11 Design & Access Statement · 12 May 2025
  • ENGLISH HERITAGE - 24.02.2014 Consultee Comment · 09 May 2025
  • LVRPA - 04.12.2013 Consultee Comment · 09 May 2025
  • LB TOWER HAMLETS - 28.11.2013 Consultee Comment · 09 May 2025
  • QUALITY REVIEW PANEL REPORT OF PA REVIEW - 17.10.2013 Correspondence · 09 May 2025
  • QUALITY REVIEW PANEL REPORT OF FORMAL REVIEW - 17.10.2013 Correspondence · 09 May 2025
  • QUALITY REVIEW PANEL REPORT - 03.06.2013 Correspondence · 09 May 2025
  • QUALITY REVIEW PANEL REPORT - 15.11.2012 Correspondence · 09 May 2025
  • ENVIRONMENT AGENCY - 25.10.2013 Consultee Comment · 09 May 2025
  • ENGLISH HERITAGE - 17.07.2013 Consultee Comment · 09 May 2025
  • LVRPA - 15.07.2013 Consultee Comment · 09 May 2025
  • GLA - 01.07.2013 Consultee Comment · 09 May 2025
  • TFL - 14.06.2013 Consultee Comment · 09 May 2025
  • NATURAL ENGLAND - 11.06.2013 Consultee Comment · 09 May 2025
  • THAMES WATER - 10.06.2013 Consultee Comment · 09 May 2025
  • HS1 LTD - 10.06.2013 Consultee Comment · 09 May 2025
  • ENVIRONMENT AGENCY - 06.06.2013 Consultee Comment · 09 May 2025
  • LONDON CITY AIRPORT - 21.05.2013 Consultee Comment · 09 May 2025
  • LB TOWER HAMLETS - 20.02.2013 Consultee Comment · 09 May 2025
  • CGMS CONSULTING ON BEHALF OF MET & MOPAC - 17.12.2012 Consultee Comment · 09 May 2025
  • CROSSRAIL - 06.12.2012 Consultee Comment · 09 May 2025
  • CANAL & RIVER TRUST - 12.12.2012 Consultee Comment · 09 May 2025
  • ENGLISH HERITAGE - 18.01.2013 Consultee Comment · 09 May 2025
  • ENVIRONMENT AGENCY - 03.01.2013 Consultee Comment · 09 May 2025
  • GLA STAGE 1 RESPONSE - 02.01.2013 Correspondence · 09 May 2025
  • HEALTH PROTECTION AGENCY - 17.12.2012 Consultee Comment · 09 May 2025
  • HS1 LTD - 18.12.2012 Consultee Comment · 09 May 2025
  • LB HACKNEY - 15.01.2013 Consultee Comment · 09 May 2025
  • LONDON CYCLING CAMPAIGN - 21.12.2012 Consultee Comment · 09 May 2025
  • NHS TOWER HAMLETS - 17.12.2012 Consultee Comment · 09 May 2025
  • TFL - 12.12.2012 Consultee Comment · 09 May 2025
  • THAMES WATER - 05.12.2012 Consultee Comment · 09 May 2025
  • FURTHER INFORMATION - PEABODY BACKGROUND - 28.10.2013 Correspondence · 09 May 2025
  • SCHEDULES TO PLANNING APPLICATION FORMS Correspondence · 09 May 2025
  • COVERING LETTER Correspondence · 09 May 2025
  • FURTHER INFORMATION - PEABODY LETTER TO LLDC - 28.10.13 Correspondence · 09 May 2025
  • COMMERCIAL STRATEGY - 12.11.2013 Report · 09 May 2025
  • DESIGN CODE - PART 1 Report · 09 May 2025
  • DESIGN CODE - PART 2A Report · 09 May 2025
  • DESIGN CODE - PART 2B Report · 09 May 2025
  • DESIGN CODE - PART 2C Report · 09 May 2025
  • DESIGN CODE - PART 2D Report · 09 May 2025
  • DESIGN CODE - PART 3 Report · 09 May 2025
  • DESIGN CODE - PART 4A Report · 09 May 2025
  • DESIGN CODE - PART 4B Report · 09 May 2025
  • DESIGN CODE - PART 4C Report · 09 May 2025
  • DESIGN CODE - PART 5A Report · 09 May 2025
  • DESIGN CODE - PART 5B Report · 09 May 2025
  • DESIGN CODE - PART 6 Report · 09 May 2025
  • DEVELOPMENT SPECIFICATION Report · 09 May 2025
  • DEVELOPMENT SPECIFICATION TRACKER Report · 09 May 2025
  • ENERGY STATEMENT Report · 09 May 2025
  • ENERGY STATEMENT OUTLINE Report · 09 May 2025
  • ADDENDUM VOL 5 - CH 1 TO 3 Environmental Statement · 09 May 2025
  • ADDENDUM VOL 5 - CH 4 TO 6 Environmental Statement · 09 May 2025
  • ADDENDUM VOL 5 - CH 7 TO 8 Environmental Statement · 09 May 2025
  • ADDENDUM VOL 5 - CH 9 PART 2 Environmental Statement · 09 May 2025
  • ADDENDUM VOL 5 - CH 9 PART 1 Environmental Statement · 09 May 2025
  • ADDENDUM VOL 5 - CH 10 TO 13 Environmental Statement · 09 May 2025
  • ADDENDUM VOL 5 - CH 14 Environmental Statement · 09 May 2025
  • ADDENDUM VOL 5 - CH 15 TO 16 Environmental Statement · 09 May 2025
  • ADDENDUM VOL 5 - CH 17 TO 19 Environmental Statement · 09 May 2025
  • VOL 7 - NON-TECHNICAL SUMMARY Environmental Statement · 09 May 2025
  • ADDENDUM VOL 8 - CH 1 TO 8 Environmental Statement · 09 May 2025
  • ADDENDUM VOL 8 - CH 9 PART 1 Environmental Statement · 09 May 2025
  • ADDENDUM VOL 8 - CH 9 PART 2 Environmental Statement · 09 May 2025
  • ADDENDUM VOL 8 - CH 10 TO 14 Environmental Statement · 09 May 2025
  • ADDENDUM VOL 8 - CH 15 TO 19 Environmental Statement · 09 May 2025
  • VOL 9A - TECHNICAL APPENDICES PART 1 Environmental Statement · 09 May 2025
  • VOL 9A - TECHNICAL APPENDICES PART 2 Environmental Statement · 09 May 2025
  • VOL 9A - TECHNICAL APPENDICES PART 3 Environmental Statement · 09 May 2025
  • VOL 9A - TECHNICAL APPENDICES PART 4 Environmental Statement · 09 May 2025
  • VOL 9A - TECHNICAL APPENDICES PART 5 Environmental Statement · 09 May 2025
  • VOL 9A - TECHNICAL APPENDICES PART 6 Environmental Statement · 09 May 2025
  • VOL 9A - TECHNICAL APPENDICES PART 7 Environmental Statement · 09 May 2025
  • VOL 9A - TECHNICAL APPENDICES PART 8 Environmental Statement · 09 May 2025
  • VOL 9A - TECHNICAL APPENDICES PART 9 Environmental Statement · 09 May 2025
  • VOL 9A - TECHNICAL APPENDICES PART 10 Environmental Statement · 09 May 2025
  • VOL 9A - TECHNICAL APPENDICES PART 11 Environmental Statement · 09 May 2025
  • VOL 9A - TECHNICAL APPENDICES PART 12 Environmental Statement · 09 May 2025
  • VOL 9A - TECHNICAL APPENDICES PART 13 Environmental Statement · 09 May 2025
  • VOL 9A - TECHNICAL APPENDICES PART 14 Environmental Statement · 09 May 2025
  • VOL 9A - TECHNICAL APPENDICES PART 15 Environmental Statement · 09 May 2025
  • VOL 9A - TECHNICAL APPENDICES PART 16 Environmental Statement · 09 May 2025
  • VOL 9A - TECHNICAL APPENDICES PART 17 Environmental Statement · 09 May 2025
  • VOL 9A - TECHNICAL APPENDICES PART 18 Environmental Statement · 09 May 2025
  • VOL 9A - TECHNICAL APPENDICES PART 19 Environmental Statement · 09 May 2025
  • SUPPLEMENTAL DEED TO S106 DATED 08.06.23 S106 Agreement · 08 May 2025
  • SUPPLEMENTAL DEED TO LEGAL MORTGAGE 08.06.23 S106 Agreement · 08 May 2025
  • 26 NOVEMBER 2013 Committee Report · 08 May 2025
  • 25 FEB 2014 Committee Report · 08 May 2025
  • UPDATE REPORT - 25 FEB 2014 Committee Report · 08 May 2025
  • UPDATE REPORT - 26 NOVEMBER 2013 Committee Report · 08 May 2025

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you the drawings on every job in your area. 14 days free.

What this grant of permission means

Tower Hamlets granted permission on 27 March 2014, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 50 Monier Road, London, E3 2ND

    PA/26/00141/NC Submitted 26 Jan 2026 100 yards away

    Proposed new 5-storey building to create 9 new self-contained dwellings and 9 commercial creative studio spaces.

    Granted Full applications Drawings (14) 58 docs
  • 1 Beachy Road, Fish Island, London E3 2NS

    PA/25/01427/S Submitted 12 Aug 2025 100 yards away

    Submission of detail pursuant to condition no 9 (Validation Report) of planning permission ref: LL/23/00244 dated 23/08/2023

    Granted Conditions 2 docs
  • 1 Beachy Road, Fish Island, London, E3 2NS

    PA/25/02249/S Submitted 24 Dec 2025 100 yards away

    Submission of details pursuant to condition no.14 (Secured by Design) of planning permission ref: LL/23/00244/VAR, dated 16/06/2023

    Granted Conditions 3 docs
  • Land at Wansbeck Road, Fish Island, London, E3 2NF

    PA/26/00069 Submitted 12 Jan 2026 150 yards away

    Request for Screening Opinion as to whether an Environmental Impact Assessment (EIA) is required in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) (the 'EIA Regulations') for the redevelopment of the site to provide two buildings ranging between 7-10 storeys in height, which will contain a total of approximately 324 new homes (40% of which will be affordable based on habitable room), made up of 44 social rented homes and 280 Co-living studios, together with associated communal spaces and amenity space.

    Decided Outline 2 docs
  • Land at Wansbeck Road, Fish Island, London, E3 2NF

    PA/26/00069/NC Submitted 12 Jan 2026 150 yards away

    Request for Screening Opinion as to whether an Environmental Impact Assessment (EIA) is required in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) (the 'EIA Regulations') for the redevelopment of the site to provide two buildings ranging between 7-10 storeys in height, which will contain a total of approximately 324 new homes (40% of which will be affordable based on habitable room), made up of 44 social rented homes and 280 Co-living studios, together with associated communal spaces and amenity space.

    Decided Outline 1 doc
  • Land at Wansbeck Road, Fish Island, London, E3 2NF

    PA/26/00765/A1 Submitted 13 May 2026 150 yards away

    85% historically approved · decision due ~8 Jul

    Redevelopment of the site to deliver Purpose Built Shared Living Accommodation (Sui Generis) and affordable housing units (Class C3) with associated public realm improvements comprising hard and soft landscaping and other associated works

    Awaiting decision Full applications Drawings (32) 111 docs

In Tower Hamlets

  • PA/26/01708/NC Awaiting decision

    Flats 1-2 Mauve Apartments, 2 Hymek Square, LONDON E14 0FS, 3-70 Panoramic Tower, 6 Hay Currie Street, London E14 6GF & 7 - 112 Panoramic Tower, 6 Hay Currie Street, London E14 6FA

    Application for Certificate of Lawfulness in respect of proposed remediation works to the facade and balconies at Willis Street, Panoramic Tower. Proposed works include removal of areas of present combustible materials to the facade and balconies to replace with non-combustible alternatives and install cavity barriers where appropriate, maintaining the overall visual appearance of the building. Please refer to Planning Summary document attached to this application (Willis Street Planning Summary)

    Received 7 Oct, published by the council 13 Oct 2026 Outline
  • PA/26/01718/NC Awaiting decision

    21 Caledonian Wharf, London, E14 3EN

    Application for certificate of Lawfulness in respect of proposed a ground floor rear extension, facade alterations

    Received 7 Oct, published by the council 13 Oct 2026 Outline
  • PA/26/01272/NC Granted

    Site at Waterman Square, Seldon Way, London E14 9GL

    The erection of 1-metre tall boundary fences and gates at the hard and soft landscaped area at Waterman Square.

    Received 29 Jul, published by the council 1 Aug 2026 Outline
  • PA/26/01345/NC Granted

    Park View Court, 215 Devons Road, London E3 3AN

    Application for Certificate of Lawfulness in respect of proposed remediation works to the facade and balconies at Furze Green, Park View Court and Eastwood House. Proposed works include removal of areas of present combustible materials to the facade and balconies to replace with non-combustible alternatives and install cavity barriers where appropriate, aiming to maintain the overall visual appearance of the building.

    Received 10 Aug, published by the council 18 Aug 2026 Outline
  • PA/26/01679/NC Awaiting decision

    25 Rectory Square, London, E1 3NQ

    Proposed alterations to the front entrance, including removal of existing projection and changing the entrance arrangement.

    Received 2 Oct, published by the council 8 Oct 2026 Outline