Skip to content
PlanIndex Get alerts
Menu

Planning application

Agricultural Building At Grid Reference 241893 124226 Fairy Cross Devon

Awaiting decision Torridge 1/0538/2026/FUL Full Application

Works: New dwelling Demolition Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of existing barn and erection of new dwelling in lieu of planning approval 1/0203/2025/FUL (affecting a public right of way) - self build

As published by the council, reference 1/0538/2026/FUL

Application record

Reference
1/0538/2026/FUL
Type
Full Application
Status
Awaiting Decision
Received
24 Jul 2026
Validated
28 Jul 2026
Ward
Monkleigh And Putford
Parish
Alwington

Timeline

Dates from the published record

  1. 24 Jul 2026

    Received by Torridge

  2. 28 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 16 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 22 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Torridge took a median of 56 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Torridge for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Torridge

  • Land At Timber Lodge Buckland Brewer Devon

    Erection of a calf rearing building, extension to existing buildings, erection of farm office/grub room/welfare unit and associated yards, track and entrance.

    2 Mar 2026 Full applications
  • Land At Ebberley Down Ebberley Devon EX38 7JS

    Construction and operation of a grid-connected solar photovoltaic farm, incorporating battery storage, with infrastructure, landscaping and biodiversity enhancements (Variation of conditions 2, 8, 10, 11, 16, 17 and 22 of planning approval 1/1225/2023/FULM)

    20 Mar 2026 Full applications
  • 1/0473/2026/FUL Granted

    Bradworthy Inn The Square Bradworthy Holsworthy Devon EX22 7TD

    Part retrospective application for the erection of a pergola structure with retractable roof within courtyard

    1 Jul 2026 Full applications
  • 1/0548/2025/FUL Granted

    Agricultural Buildings At Grid Reference 238282 115642 East Putford Devon

    Conversion of redundant barns to 3 dwellings (amended description)

    3 Jul 2025 Full applications
  • 1/0487/2026/FUL Granted

    Land At Grid Reference 263552 108770 Winkleigh Devon

    Proposed vehicle inspection pit and B8 (Storage & Distribution) building including extension of existing concrete yard

    7 Jul 2026 Full applications