Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At Bulworthy Farm Stoney Cross Alverdiscott Devon

Awaiting decision Torridge 1/0470/2025/FULM Full Application Major

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed installation of a ground mounted solar farm (49.9MW) & battery energy storage system (BESS) & associated ancillary works

As published by the council, reference 1/0470/2025/FULM

Application record

Reference
1/0470/2025/FULM
Type
Full Application Major
Status
Application is being considered
Received
4 Jun 2025
Validated
30 Jul 2025
Ward
Two Rivers And Three Moors
Parish
Alverdiscott

Timeline

Dates from the published record

  1. 4 Jun 2025

    Received by Torridge

  2. 30 Jul 2025

    Validated

    Checked as complete and ready for consideration.

  3. 1 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 29 October 2025, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.

    Torridge took a median of 57 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

195 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Torridge for determination, against a statutory target of thirteen weeks. Over the last year Torridge decided full applications in a median of 65 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Torridge

  • Land At Timber Lodge Buckland Brewer Devon

    Erection of a calf rearing building, extension to existing buildings, erection of farm office/grub room/welfare unit and associated yards, track and entrance.

    2 Mar 2026 Full applications
  • Land At Ebberley Down Ebberley Devon EX38 7JS

    Construction and operation of a grid-connected solar photovoltaic farm, incorporating battery storage, with infrastructure, landscaping and biodiversity enhancements (Variation of conditions 2, 8, 10, 11, 16, 17 and 22 of planning approval 1/1225/2023/FULM)

    20 Mar 2026 Full applications
  • 1/0473/2026/FUL Granted

    Bradworthy Inn The Square Bradworthy Holsworthy Devon EX22 7TD

    Part retrospective application for the erection of a pergola structure with retractable roof within courtyard

    1 Jul 2026 Full applications
  • 1/0548/2025/FUL Granted

    Agricultural Buildings At Grid Reference 238282 115642 East Putford Devon

    Conversion of redundant barns to 3 dwellings (amended description)

    3 Jul 2025 Full applications
  • 1/0487/2026/FUL Granted

    Land At Grid Reference 263552 108770 Winkleigh Devon

    Proposed vehicle inspection pit and B8 (Storage & Distribution) building including extension of existing concrete yard

    7 Jul 2026 Full applications