Skip to content
PlanIndex Get alerts
Menu

Planning application

First Floor 28 Victoria Street Old Cwmbran Cwmbran Torfaen NP44 3JN

Awaiting decision Torfaen 26/P/0435/FUL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of an air source heat pump at first floor.

As published by the council, reference 26/P/0435/FUL

Application record

Reference
26/P/0435/FUL
Category
Full applications
Status
Pending Consideration
Received
9 Sep 2026
Validated
25 Sep 2026
Ward
Llantarnam
Parish
Cwmbran Community Council
Decision by
Delegated Decision
Postcode
NP44 3JN

Timeline

Dates from the published record

  1. 9 Sep 2026

    Received by Torfaen

  2. 25 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 29 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 20 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Torfaen took a median of 55 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

AMT Design Ltd Agent, a design practice

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

  • APPLICATION FORM - WITHOUT PERSONAL DATA Forms · 09 Sep 2026
  • HOW THE FEE WAS CALCULATED Other · 09 Sep 2026
  • A SUMMARY OF THE ATTACHMENTS IN THE PROPOSAL Other · 09 Sep 2026
  • THE LOCATION PLAN Drawing · 09 Sep 2026
  • EXISTING & PROPOSED ELEVATIONS SHOWING AC UNIT - P (20) 10 Drawing · 09 Sep 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Torfaen for determination, against a statutory target of eight weeks. Over the last year Torfaen decided full applications in a median of 79 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land At Victoria Street/Ventnor Road Old Cwmbran Cwmbran Torfaen NP44 3JN

    24/P/0620/CND Submitted 2 Oct 2024 50 yards away

    Discharge condition 16 (public art) of 20/P/0720/FUL for demolition of existing building and redevelopment to form 13 no. apartments and associated works

    Granted Conditions New dwelling Demolition 9 docs
    Major scheme
  • 6 Ventnor Road Old Cwmbran Cwmbran Torfaen NP44 3JY

    24/P/0597/CND Submitted 13 Sep 2024 50 yards away

    Discharge of condition 7 (grease trap metal box filter system) relating to planning permisison 23/P/0026/FUL change of use of the existing house garage to kitchen preparation area for business use & associated storage

    Granted Conditions 15 docs
  • 13D Victoria Street Old Cwmbran Cwmbran Torfaen NP44 3JS

    24/P/0627/FUL Submitted 7 Oct 2024 100 yards away

    Changes to front elevation of building and change of use of the premises to use for a hot food takeaway business

    Granted Full applications 32 docs
  • 19 Abbey Road Old Cwmbran Cwmbran Torfaen NP44 3LB

    25/P/0522/HH Submitted 29 Aug 2025 150 yards away

    Installation of air source heat pump

    Granted Householder 19 docs
    Domestic
  • 19 Abbey Road Old Cwmbran Cwmbran Torfaen NP44 3LB

    25/P/0660/CND Submitted 28 Oct 2025 150 yards away

    Discharge of Condition 3 (Biodiversity enhancement measures) of permission 25/P/0522/HH - Installation of air source heat pump

    Granted Conditions 9 docs
  • Stadium House Oldbury Road Old Cwmbran Cwmbran Torfaen NP44 3JU

    26/P/0142/CND Submitted 30 Mar 2026 200 yards away

    Discharge of condition 2 (Construction Management Plan) relating to planning application 25/P/0617/VAR variation of Condition 2 (approved plans) of planning application 24/P/0581/VAR - Change of use and refurbishment of office building Use Class B1 into apartments Use Class C3) - Replace two-storey side extension with steel fire escape

    Granted Conditions New dwelling Extension 13 docs

In Torfaen

  • 26/P/0499/FUL Awaiting decision

    Raglan House Llantarnam Park Way Llantarnam Cwmbran Torfaen NP44 3AB

    Installation of double doors to ground floor units on the front elevation.

    Received 21 Oct, published by the council 22 Oct 2026 Full applications
  • 26/P/0074/FUL Granted

    Former ZF Factory (Part) Pont Y Felin Road New Inn Pontypool Torfaen NP4 0TL

    Partial demolition and extension to the existing factory to provide additional manufacturing space and a new yard.

    Received 13 Feb, published by the council 28 Jul 2026 Full applications
  • 26/P/0426/FUL Granted

    Panteg House Greenhill Road Sebastopol Pontypool Torfaen NP4 5BE

    To repair and resurface half the area of the existing tennis courts at Panteg House and replace the 9 ft sports fencing which had been removed due to damage and in preparation for replacement with exactly the same

    Received 4 Sep, published by the council 17 Sep 2026 Full applications
  • 25/P/0738/FUL Granted

    Ivydene Old Penygarn Road Penygarn Pontypool Torfaen NP4 8JS

    The conversion and change of use of former tennis pavillion into a two bedroom bungalow; removal of the existing timber frame and cladding and the replacement with traditional brickwork

    Received 27 Nov, published by the council 28 Jul 2026 Full applications
  • 26/P/0215/FUL Granted

    Ysgol Bryn Onnen Shop Road Varteg Pontypool Torfaen NP4 7RT

    Refurbishment, extension and access improvements to existing Welsh medium primary school including demolition of temporary classroom block to provide new permanent classroom block and demolition of admin room extension to provide new accessible linkway, main entrance and administration offices

    Received 22 May, published by the council 28 Jul 2026 Full applications