Skip to content
PlanIndex Get alerts
Menu

Planning application

19 Heol Lowri Pontrhydyrun Cwmbran Torfaen NP44 1GB

Awaiting decision Torfaen 26/P/0405/FUL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Construction of a detached outbuilding within the rear garden of the existing dwelling, to use as a small hairdressing studio operated by the homeowner only, on an appointment-only basis, with a maximum of 4 clients per day.

As published by the council, reference 26/P/0405/FUL

Application record

Reference
26/P/0405/FUL
Category
Full applications
Status
Pending Consideration
Received
27 Aug 2026
Validated
22 Sep 2026
Ward
Upper Cwmbran
Parish
Cwmbran Community Council
Decision by
Delegated Decision
Postcode
NP44 1GB

Timeline

Dates from the published record

  1. 27 Aug 2026

    Received by Torfaen

  2. 22 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 24 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 17 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Torfaen took a median of 55 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

  • GREEN INFRASTRUCTURE STATEMENT Report · 01 Sep 2026
  • CAD DESIGN SALON Drawing · 01 Sep 2026
  • FLOOR PLAN Drawing · 01 Sep 2026
  • PHOTO 1 BIRDSEYE VIEW PROPOSED LOCATION Photo · 27 Aug 2026
  • PHOTO 3 CURBSIDE VIEW FRONT OF HOUSE Photo · 27 Aug 2026
  • PHOTO 2 AREA OVERVIEW Photo · 27 Aug 2026
  • HOW THE FEE WAS CALCULATED Other · 27 Aug 2026
  • A SUMMARY OF THE ATTACHMENTS IN THE PROPOSAL Other · 27 Aug 2026
  • THE LOCATION PLAN Drawing · 27 Aug 2026
  • INVALID NOTICE Decision · 27 Aug 2026
  • FULL APPLICATION FORM Forms · 27 Aug 2026
  • PLANNING STATEMENT Report · 27 Aug 2026
  • TERMINATOR LOG CABIN SPECIFICATION Report · 27 Aug 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Torfaen for determination, against a statutory target of eight weeks. Over the last year Torfaen decided full applications in a median of 79 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 23 Heol Ewen Pontrhydyrun Cwmbran Torfaen NP44 1GD

    24/P/0344/CEA Submitted 16 May 2024 150 yards away

    Removal of existing garage door on integrated garage. Infill of existing garage opening with window and recon stone cill to match existing, Remaining part of aperture to be bricked up and rendered with rough cast Parex Render colour ivory to match existing.

    Granted Lawful development Extension Windows or glazing 12 docs
  • Heol Ewen Pontrhydyrun Cwmbran Torfaen

    24/P/0389/NMA Submitted 13 Jun 2024 200 yards away

    NMA Introduction of PV panels to multiple plots of planning application 14/P/00362 - approval for residential development 1,200 dwellings approx) ancillary retail and community development and landscaping

    Granted Amendments New dwelling 6 docs
    Major scheme
  • 35 Heol Ewen Pontrhydyrun Cwmbran Torfaen NP44 1GD

    25/P/0665/FUL Submitted 30 Oct 2025 200 yards away

    Conversion of garage to beauty room (retrospective)

    Granted Full applications 12 docs
  • 35 Heol Ewen Pontrhydyrun Cwmbran Torfaen NP44 1GD

    26/P/0037/CND Submitted 23 Jan 2026 200 yards away

    Discharge condition 2 (biodiversity) of application 25/P/0665/FUL for conversion of garage to beauty room

    Granted Conditions 5 docs
  • 46 Heol Ewen Pontrhydyrun Cwmbran Torfaen NP44 1GD

    25/P/0696/HH Submitted 13 Nov 2025 200 yards away

    Convert part of the existing garage into a home office/ study.

    Granted Householder 10 docs
    Domestic
  • Tir Brychiad Farm Lon Bevan Pontrhydyrun Cwmbran Torfaen NP44 1BX

    23/P/0096/NMA Submitted 20 Feb 2023 250 yards away

    NMA to amend the wording of Condition 1 of reserved matters approval ref: 18/P/0747/RES to remove a proposed section of shared driveway to the front of plot 106 and replace it with a hammerhead arrangement to the front of plots 78-80. Addition of turning head outside of plots 74-75

    Granted Amendments 25 docs

In Torfaen

  • 26/P/0499/FUL Awaiting decision

    Raglan House Llantarnam Park Way Llantarnam Cwmbran Torfaen NP44 3AB

    Installation of double doors to ground floor units on the front elevation.

    Received 21 Oct, published by the council 22 Oct 2026 Full applications
  • 26/P/0074/FUL Granted

    Former ZF Factory (Part) Pont Y Felin Road New Inn Pontypool Torfaen NP4 0TL

    Partial demolition and extension to the existing factory to provide additional manufacturing space and a new yard.

    Received 13 Feb, published by the council 28 Jul 2026 Full applications
  • 26/P/0426/FUL Granted

    Panteg House Greenhill Road Sebastopol Pontypool Torfaen NP4 5BE

    To repair and resurface half the area of the existing tennis courts at Panteg House and replace the 9 ft sports fencing which had been removed due to damage and in preparation for replacement with exactly the same

    Received 4 Sep, published by the council 17 Sep 2026 Full applications
  • 25/P/0738/FUL Granted

    Ivydene Old Penygarn Road Penygarn Pontypool Torfaen NP4 8JS

    The conversion and change of use of former tennis pavillion into a two bedroom bungalow; removal of the existing timber frame and cladding and the replacement with traditional brickwork

    Received 27 Nov, published by the council 28 Jul 2026 Full applications
  • 26/P/0215/FUL Granted

    Ysgol Bryn Onnen Shop Road Varteg Pontypool Torfaen NP4 7RT

    Refurbishment, extension and access improvements to existing Welsh medium primary school including demolition of temporary classroom block to provide new permanent classroom block and demolition of admin room extension to provide new accessible linkway, main entrance and administration offices

    Received 22 May, published by the council 28 Jul 2026 Full applications