Skip to content
PlanIndex Get alerts
Menu

Planning application

Triton 21 Penllyn Avenue Pontnewydd Cwmbran Torfaen NP44 1RD

Awaiting decision Torfaen 26/P/0393/HH Householder

Works: Extension Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Two storey extension

As published by the council, reference 26/P/0393/HH

Application record

Reference
26/P/0393/HH
Category
Householder
Status
Pending Consideration
Received
24 Aug 2026
Validated
7 Sep 2026
Ward
Pontnewydd
Parish
Cwmbran Community Council
Decision by
Delegated Decision
Postcode
NP44 1RD

Comment by 1 October 2026

The council is taking comments on this application until then. Comments go to Torfaen through their own planning portal.

Timeline

Dates from the published record

  1. 24 Aug 2026

    Received by Torfaen

  2. 7 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 10 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 2 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Torfaen took a median of 54 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

  • PROPOSED SITE PLAN - JS/P/05 Drawing · 24 Aug 2026
  • PROPOSED ELEVATIONS - JS/P/04R Drawing · 24 Aug 2026
  • PROPOSED ROOF PLAN - JS/P/03R Drawing · 24 Aug 2026
  • PROPOSED FIRST FLOOR PLAN - JS/P/02R Drawing · 24 Aug 2026
  • PROPOSED GROUND FLOOR PLAN - JS/P/01 Drawing · 24 Aug 2026
  • EXISTING SITE PLAN - JS/E/05 Drawing · 24 Aug 2026
  • LOCATION PLAN - JS/E/04 Drawing · 24 Aug 2026
  • EXISTING ELEVATIONS - JS/E/03 Drawing · 24 Aug 2026
  • EXISTING FIRST FLOOR PLAN - JS/E/02 Drawing · 24 Aug 2026
  • EXISTING GROUND FLOOR PLAN - JS/E/01 Drawing · 24 Aug 2026
  • BAT SCOPING SURVEY V2.0 - ECOLOGICAL SERVICES LTD Report · 24 Aug 2026
  • APPLICATION EMAIL Correspondence · 24 Aug 2026
  • APPLICATION FORM Forms · 24 Aug 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Torfaen for determination, against a statutory target of eight weeks. Over the last year Torfaen decided householder applications in a median of 56 days. More in our guide to how long planning decisions take.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Torfaen

  • 26/P/0339/HH Granted

    3 Elgam Avenue Blaenavon Torfaen NP4 9QY

    Construction of a garage

    29 Jul 2026 Householder
  • 26/P/0337/HH Decided

    58 Glan Rhyd Coed Eva Cwmbran Torfaen NP44 6TY

    Single storey front and rear extensions and pitched roof over the garage to form an annexe at first floor.

    28 Jul 2026 Householder
  • 26/P/0149/HH Granted

    74 Two Locks Road Two Locks Cwmbran Torfaen NP44 7LD

    Proposed two storey side extension and demolition of garage

    2 Apr 2026 Householder
  • 26/P/0434/HH Awaiting decision

    Monieth Upper Cwmbran Road Upper Cwmbran Cwmbran Torfaen NP44 5SW

    New proposed pitched roof with side dormer to replace existing flat roof and formulate two new bedrooms and en-suites, alongside interior alterations to improve compliant staircases to accommodate multi generational living.

    8 Sep 2026 Householder
  • 26/P/0329/HH Granted

    107 Heather Court Ty Canol Cwmbran Torfaen NP44 6JQ

    Knocking out of the existing garage in order to extend kitchen area.

    23 Jul 2026 Householder