Planning application

26/P/0032/CND

Former Ironworks Knows As The British Talywain Pontypool Torfaen

Awaiting decision Torfaen Discharge Condition

Proposal

Discharge of conditions 7 (Archaeological Written Scheme of Investigation), 13 (Remediation Strategy), 15 (Contamination Report and Geo-environmental Prelimminary Risk Assessment), 18 (Details of access track) relating to planning application 23/P/0615/FUL - Works to redirect the Blaengafog stream Castle Wood watercourse south of Farm Road and the creation of a pond to store water, allowing a more controlled discharge of surface waters from the site into the existing culvert network. Associated remediation and landscaping works and repair/refurbishment works to the existing culvert.

As published by the council, reference 26/P/0032/CND

Timeline

Dates from the published record

  1. 16 Jan 2026

    Received by Torfaen

  2. 22 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Torfaen for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • 25/P/0706/CND Granted

    The British Talywain Pontypool Torfaen

    Partial discharge of condition 5(g) (relating to Ecological Watching Brief) and full discharge of condtion 9 (Landscape Ecological Management Plan) of planning permission 23/P/0615/FUL - Works to redirect the Blaengafog stream Castle Wood watercourse south of Farm Road and the creation of a pond to store water, allowing a more controlled discharge of surface water from the site into the existing culvert nextwork.

    17 Nov 2025 0m away Conditions
  • 25/P/0664/CND Granted

    The British Talywain Pontypool Torfaen

    Discharge of conditions 11 (reptile method statement) and 12 (ornithology method statement) of planning permission 23/P/0615/FUL - Works to redirect the Blaengafog stream Castle Wood watercourse south of Farm Road and the creation of a pond to store water, allowing a more controlled discharge of surface waters from the site into the existing culvert network. Associated remediation and landscaping works and repair/refurbishment works to the existing culvert.

    29 Oct 2025 0m away Conditions
  • 26/P/0137/FUL Awaiting decision

    Old Station House Church Road Talywain Pontypool Torfaen NP4 7EE

    Siting and operation of a non-permanent mobile coffee trailer for the sale of hot and cold beverages and light refreshments.

    26 Mar 2026 274m away Full applications
  • 25/P/0474/FUL Granted

    Old Station Yard Talywain Pontypool Torfaen NP4 7EE

    Installation of 19no. shipping containers with associated ground works, ecological enhancements and visual screening measures

    7 Aug 2025 288m away Full applications
  • 26/P/0072/TPO Awaiting decision

    17 British School Close Abersychan Pontypool Torfaen NP4 7AS

    Reduce crown back towards boundary by 3m maximum at suitable lateral branches. Lift low foliage tips to 5m over 17/18. Remove dead or damaged branches over 17/18.

    11 Feb 2026 460m away Trees
  • 25/P/0654/LBC Awaiting decision

    St Thomas's Church Church Road Talywain Pontypool Torfaen

    Proposed change of use of former St Thomas Church to mixed use including: 10 letting bedrooms for holiday accommodation (Use Class C6), managers accommodation, cafe and associated alterations

    24 Oct 2025 469m away Heritage and listed buildings

In Torfaen

  • 26/P/0273/CND Granted

    Lloyds Tsb Bank Plc Commercial Street Pontypool Torfaen NP4 6YE

    Discharge condition 6 (bin and cycle storage) of application 24/P/0618/FUL for change of use of former Bank to create six residential flats (C3 use) and retention of partial A2 Use to ground Floor and basement

    22 Jun 2026 Conditions
  • 26/P/0315/CND Awaiting decision

    Crown Inn Greenhill Road Sebastopol Pontypool Torfaen NP4 5BQ

    Discharge condition 3 (external materials) of application 20/P/0398/FUL for change of use and renovation of public house to residential dwelling and tearooms

    16 Jul 2026 Conditions
  • 26/P/0249/CND Granted

    41 Liswerry Drive Llanyravon Cwmbran Torfaen NP44 8RF

    Discharge of Condition 3 (biodiversity enhancements) of planning permission 26/P/0156/HH

    9 Jun 2026 Conditions
  • 26/P/0268/CND Granted

    Big Pit (blaenafon) Trust Ltd Gilchrist Thomas Industrial Estate Blaenavon Torfaen NP4 9XP

    Discharge of condition 3 (Big Pit Fixing Detail) relating to planning application 25/P/0652/LBC installation of ASHPs to serve the Pithead Baths. Proposal to include an associated enclosure and a new AHU unit.

    18 Jun 2026 Conditions
  • 26/P/0295/CND Awaiting decision

    Big Pit (blaenafon) Trust Ltd Gilchrist Thomas Industrial Estate Blaenavon Torfaen NP4 9XP

    Discharge of Condition 2 re: 22/P/0225/FUL - BIG PIT NATIONAL COAL MUSEUM ECOLOGICAL MANAGEMENT AND ENHANCEMENT PLAN

    6 Jul 2026 Conditions