Planning application

Paignton Academy Waterleat Road Paignton TQ3 3WA

Granted Torbay P/2024/0451 Planning Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Removal of 16 existing 2000W metal halide floodlights and the installation of 12 1500W LED floodlights mounted on the 8 existing 15m high columns around the existing 3G pitch.

As published by the council, reference P/2024/0451

Application record

Reference
P/2024/0451
Type
Planning Application
Status
Decided
Decision
Approval
Received
5 Jul 2024
Validated
12 Sep 2024
Decided
21 Oct 2024
Ward
Clifton With Maidenway
Decision by
Delegated
Postcode
TQ3 3WA

Timeline

Dates from the published record

  1. 5 Jul 2024

    Received by Torbay

  2. 12 Sep 2024

    Validated

    Checked as complete and ready for consideration.

  3. 21 Oct 2024

    Decision issued: Approval

  4. 2 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Noahs Ark 267 Totnes Road Paignton Devon TQ4 7HB

    P/2010/1064 Submitted 17 Sep 2010 146m away

    Replacement of existing bar terrace with new at front

    Granted Full applications 4 docs
  • Paignton Zoo Environment Park Totnes Road Paignton TQ4 7EU

    P/2026/0350 Submitted 1 Jun 2026 149m away

    Works to form new pedestrian footbridge near zoo entrance with associated path alterations.

    Granted Full applications
  • 274 Totnes Road Paignton TQ4 7HB

    P/2019/1221 Submitted 15 Nov 2019 167m away

    Proposed rear extension & internal alterations.

    Granted Householder Extension 10 docs
    Domestic
  • Morrisons Totnes Road Paignton TQ4 7ET

    P/2024/0571 Submitted 21 Aug 2024 169m away

    Variation of condition in relation to P/2016/0372 (Variation of Condition 1 of P/1997/0846 to vary hours of opening for filling station to 6am-11pm Monday to Saturday and 8am-9pm on Sunday). Condition 01 Hours of use. Variation sought: Modify condition 1, change to: The petrol filling station shall not operate other than between the hours of 06:00 to 23:00 daily.

    Granted Amendments 8 docs
  • 9 Kings Ash Road Paignton TQ3 3TY

    P/2022/1210 Submitted 4 Nov 2022 191m away

    Formation of single storey extension to rear with decking.

    Granted Householder Extension 19 docs
    Small domestic
  • 25B Kings Ash Road Paignton TQ3 3TY

    P/2020/0593 Submitted 25 Jun 2020 208m away

    Replacement of windows at first floor level.

    Granted Full applications Windows or glazing 28 docs

In Torbay

  • P/2025/0768 Granted

    St Edmunds Hotel 25 Sands Road Paignton TQ4 6EG

    Change of use from guest house to dwelling.

    1 Dec 2025 Full applications
  • P/2026/0532 Awaiting decision

    41 Totnes Road Paignton TQ4 5LA

    Change of use from ambulance offices (use class E) to residential institution as adult respite centre (use class C2) to include construction of single storey extension to rear and associated works.

    24 Aug 2026 Full applications
  • P/2026/0271 Withdrawn

    15 Scarborough Road Torquay TQ2 5UJ

    Change of use from C1 (guesthouse) to C4 (six-bed HMO) with no external alterations. Existing self-contained basement flat retained as C3 dwelling. No building works proposed.

    27 Apr 2026 Full applications
  • P/2026/0512 Awaiting decision

    33A New Road Brixham TQ5 8NB

    Change of use of garage to affordable residential unit. Alterations to fenestration.

    14 Aug 2026 Full applications
  • P/2026/0309 Refused

    The Rosewood 56 Belgrave Road Torquay TQ2 5HY

    Change of use of upper floors of property from C1 (guesthouse) to six-bedroom HMO. Basement and ground floor owner's accommodation remains unchanged. No external alterations.

    11 May 2026 Full applications